This document contains two Excel spreadsheets outlining road decommissioning projects and a related federal contract opportunity notice.

The spreadsheets provide line item estimates for decommissioning over 2.5 miles of road, including mobilization of excavation equipment, general excavation and haul work using excavators and dump trucks, dewatering of streams if needed, and soil stabilization of disturbed areas using government provided seed and mulch. The projects are located on Bureau of Land Management property in Josephine County, Oregon.

The related federal contract opportunity is a solicitation notice for aquatic restoration services issued by the Bureau of Land Management's Oregon-Washington office. The notice seeks a contractor to perform aquatic restoration but provides no further details on required work, response deadline, or award date.

View the file

Other files for this federal contract opportunity

Other files attached to SERVICE AQUATIC RESTORATION, newest first.
File Type Posted
Sol_140L4322Q0151_Amd_0001.pdf PDF
RFQ_140L4322Q0151_and_Attachments.pdf PDF
Sol_140L4322Q0151.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Keene Ck and Upper Jenny Ck

South Fork Keene Creek Road Decommissioning Project: total road deco length 1.4 miles
Legal description: T40S-R03E-21
ItemDescriptionQytUnit of measureUnit PriceTotal Price
1Mobilization-move equipment from contractor's point of origin to ordering office (Medford): Excavator1EA
1AMobilization-non-street legal heavy equipment weighing over 12,000 pounds from ordering office to work site- Excavator to project access from Soda Mountain Road35Per Mile
1CWashing Equipment: prior to mobilization1EA
7General Excavation and Haul Work
7ALevel 3: 30,000 lbs or greater210HR
7BLevel 4: Dump Truck (10 yard capacity)10HR
8Dewatering of streams during excavation (if needed)2EA
9Soil Stabilization - general labor (govn't to provide seed and weed-free mulch)1acre
TOTAL
Upper Jenny Creek Road Decommissioning Project: total road deco length 1.1 miles
Legal description: T39S-R04E-22
1Mobilization-move equipment from contractor's point of origin to ordering office (Medford): Excavator1EA
1AMobilization-non-street legal heavy equipment weighing over 12,000 pounds from ordering office to work site- Excavator to project access from Soda Mountain Road50Per Mile
1CWashing Equipment: prior to mobilization1EA
7General Excavation and Haul Work
7ALevel 3: 30,000 lbs or greater146HR
8Dewatering of streams during excavation (if needed)1EA
9Soil Stabilization -general labor (govn't to provide seed and weed-free mulch)1acre
TOTAL