Amend_0003_140L4321R0020_0003.pdf

PDF 307 KB Posted

Attached to
Molalla Corridor Culvert Replacement and Slump Rep Federal contract opportunity
Solicitation number
140L4321R0020
Issued by
Department of the Interior Bureau of Land Management Oregon-Washington

About this file

This is an amendment to a solicitation for construction services. The amendment extends the deadline for submission of proposals to September 3, 2021 and provides clarifications to the statement of work. Specifically, it revises the in-stream work period from July 15 to August 31. It also answers two questions from potential offerors by clarifying that an existing 48-inch culvert is incorrectly labeled on the plans as 24 inches, and confirming that option item one covers excavation and embankment work for two slide repair sites. The solicitation is for the Molalla Corridor Culvert Replacement and Slump Repair project for the Bureau of Land Management Salem District Office in Oregon.

View the file

Other files for this federal contract opportunity

Other files attached to Molalla Corridor Culvert Replacement and Slump Rep, newest first.
File Type Posted
Sol_140L4321R0020_Amd_0003.pdf PDF
Amend_0002_140L4321R0020_0002.pdf PDF
Sol_140L4321R0020_Amd_0002.pdf PDF
Sol_140L4321R0020_Amd_0001.pdf PDF
Amend_0001_140L4321R0020_0001.pdf PDF
Sol_140L4321R0020.pdf PDF
RFP_Solicitation_140L4321R0020_Molalla_Culvert_Repl.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L4321R0020 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LHA

PORTLAND OR 97204

1220 SW 3rd Avenue, 12th Floor

BLM OR-ST OFC PROC MGMT BR(OR952)

08/02/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/02/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Construction Contract for Molalla Corridor Culvert Replacement and Slump Repair in

Clackamas County for the BLM Northwest Oregon District Office, Salem, Oregon.

The purpose of this amendment is for the following changes:

1) Change to Section 107.10(e). In-Stream Work 1 (attached).

2) Two (2) questions and answers (attached).

The date and time for submission of proposals has been extended to September 3, 2021 at

10:00 AM/PT.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susanne Clark

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

x 1

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L4321R0020/0003

Legacy Doc #: BLM

Period of Performance: 09/10/2021 to 09/24/2022

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

AMENDMENT 0003

Change 1 (Revised from Amendment 0002) Section 107.10(e) II. In-Stream Work 1. The Contractor shall perform all in-stream portions of work during the ODF&W In-Stream Work period between July 15th and August 31st.

Q&A

Question 1 Bid item 13 is for a 48” CMP culvert that is over 10’ deep. After much searching we are unable to find this culvert on the plans, can you please point us to this culvert?

Response: The Deep Culvert at MP 7.12 is labeled on the plans as a 24" Diameter. The existing culvert is a 24" and shall be replaced with a 48" Diameter pipe. The plan should read "REPLACE w/ ALZD CMP, 48 INCH DIA. X 80 FT LONG". The RIPRAP quantity should read "RIPRAP INLET, 2.7 CUYD". The cover height estimate for MP 7.12 is labeled correct on the plans ("11 FT COVER HEIGHT"). The change in quantity to the inlet Riprap at MP 7.12 does not change the estimated quantity on Bid Item #4 251 (01) Riprap - Class 100. This does not change Bid Item #5 Aggregate - Pipe Bedding.

Question 2 What Bid Item covers the Excavation and Embankment backfill for the 12’ deep repairs? None of the current bid items appear to cover this work

Response: Option Item #1 covers all work associated with the two slide repair sites in the vicinity of MP 5.31.

s2clark Highlight

Amend 0003_140L4321R0020
Amend 0003