Amendment_0004_plus_RFI_Responses_0004.pdf
PDF 128 KB Posted
- Attached to
- SALEM OFFICE ENTRANCE SECURITY IMPROVEMENTS Federal contract opportunity
- Solicitation number
- 140L4321R0010
About this file
This document contains an amendment to a solicitation for entrance security improvements to the Bureau of Land Management's Northwest Oregon District Office in Salem, Oregon. The amendment extends the solicitation response deadline from July 9, 2021 to July 12, 2021 at 5:00 PM and includes responses to two requests for information from prospective offerors. The security improvements include demolition of portions of the existing storefront and reception area, installation of new ballistic office walls, doors and glass, architectural features to match existing aesthetics, new data and communication cabling and operating panels, and modification of existing building components. Offerors must provide detailed proposals including project scheduling, contractor and subcontractor qualifications, product assembly and installation details and schedule, framing components, fastening systems, product samples, testing reports, finish schedule and shop drawings. A licensed electrician is required for all electrical work including low voltage systems.
View the file
Other files for this federal contract opportunity
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L4321R0010 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LHA
PORTLAND OR 97204
1220 SW 3rd Avenue, 12th Floor
BLM OR-ST OFC PROC MGMT BR(OR952)
06/09/20210004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/17/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SALEM ENTRACE SECURITY IMPROVEMENTS, BLM, NORTHWEST OREGON DISTRICT.
Period of Performance: 07/19/2021 to 10/19/2021
The Purpose of this Amendment # 0004 is to extend the solicitation deadline from 07/09/2021 to 07/12/2021 at 1700 ES and to post the attached RFI'S received and the governments responses to them.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Timothy Wanamaker
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SALEM ENTRANCE SECURITY IMPROVEMENTS SOLICITATION NO. 140L4321R0010
NW OREGON DISTRICT
REQUESTS FOR INFORMATION (RFI)
Respondent Question 1: What intrusion and access systems do you already have in place and Security
Camera system?
District Response 1: Sonitrol currently holds the security monitoring contract for the building and grounds. The system consists of magnetic door locks, vehicle gate operators, exit motion sensors, proximity card readers, panic alarms and locks with door contacts, access control module(s), audio sensors, loop expansion modules, smart audio modules, LCD keypads, a Base Plus communicator, cameras and monitors, and Fire and sprinkler alarms. The system is in the process of upgrading to meet the requirements of the Department of Homeland Security’s HSPD-12 Access Control
Systems criteria. The cameras are a mixture of domes, bullets, and pan/tilt/zoom throughout the building and grounds. They are commercially available brands and can be serviced by most CCTV companies.
Respondent Question 2: With the demolition and dismantling of equipment, will you need a certified low voltage technician to safely put it back together and possibly expand inside the new construction?
District Response 2: A licensed electrician is required for all electrical work, including low voltage systems.
| Amendment 0004 |
| RESPONSES B09-Amendment 0004-RFI 140L4321R0010-Salem Office Security |
File details come from the government source that posted it. Updated .