This document is a Bid Schedule for the CNIDC Trailer Asphalt Shingle Roof Replacement contract opportunity. The solicitation number is 140L3924Q0113, and the federal agency involved is the Department of the Interior Bureau of Land Management Nevada Region.
The Bid Schedule outlines the required work, which includes shingle replacement, window sealing, installation of gutters and downspouts, and potential replacement of roof sheeting. The pricing is provided on a per-unit basis for each line item. The total cost of the project is to be $0. This appears to be a template document, as no specific pricing or quantities are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3924Q0113_Amd_0001.pdf | ||
| 52_222-55_clause_0001.docx | DOCX document | |
| 2024-06-04_00_CNIDC_Trailer_Roof_Replacement_Combined_Specs.pdf | ||
| B03_Wage_Det_Humboldt_County_NV20240031.pdf | ||
| A04_2024-06-03_CNIDC_Roof_Replacement_SOW.docx | DOCX document | |
| Sol_140L3924Q0113.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule Bid Schedule for BLM Trailer Roof Replacement in Clark RV Park in Battle Mountain
| Line 10 Shingle replacement and Window Sealing | Unit | Per Unit ($) | Total ($) | |
| Mob/Demob | 1 | $0.00 | ||
| Demo | 1 | $0.00 | ||
| Asphalt Shingle replacement (LS) | 1 | $0.00 | ||
| Line 10 Base Subtotal (LS) | $0 | |||
| Line 20 Installation of gutters, downspouts, etc. | ||||
| (Sealing or total replacement cost) | 1 | $0 | ||
| Line 30 Cost, if needed, to replace all Roof Sheating | ||||
| (To include demo and haul off of existing material) | 1 | $0 | ||
| Total Cost | $0 |