This is a Statement of Work (SOW) for the O'Neil PPA Cottonwood Fuel Break Mowing 2026 project. The contractor is required to perform mowing operations on a fuel break area, with work measured and compensated based on the number of acres satisfactorily completed to specification. Total acres will be measured on a planar using GPS units and rounded up to the nearest whole acre, with partial payments allowed via invoice submission. Mobilization costs—including all preparatory work, personnel movement, equipment transport, and supplies—must be incorporated into the total cost per acre for mowing and seeding. The contractor must furnish motor vehicles for hauling equipment and personnel to the worksite and may not load tractors or mowers on public highways without BLM authorization. An individual assigned to mark project area boundaries must be capable of operating and troubleshooting GPS tracking devices.
Contract re-measurement may be requested in writing within 10 calendar days of project completion; if the difference between measurements exceeds 5%, payment will be based on the second measurement, and the contractor pays the re-measurement cost if the difference is 5% or less. Technical evaluation requires offerors to submit a comprehensive work plan addressing personnel experience, company relevant experience, project completion within required contract days including weather delays, mobilization approach, and remote area work experience. Offerors must also describe proposed mowing methods, equipment, ground crew configuration, and relevant experience with the proposed setup. Past performance evaluation requires submission of minimum three projects completed within the past three years for similar services; references must include project name, agency, contract number, location, type, acreage, total cost, contracting officer contact information, and identification of primary contractor or subcontractor status.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3726Q0111_Amd_0001.pdf | ||
| 140L3726Q0111_-_RFQ_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O’NEIL PPA COTTONWOOD FUEL BREAK MOWING 2026
STATEMENT OF WORK
O’Neil PPA Cottonwood Fuel Break Mowing SOW Page 10 of 11
b. It is expected that the individual assigned by the Contractor who is responsible for using the device to follow and/or mark project area boundaries will be able to operate and trouble shoot the unit.
3. The Contractor shall furnish motor vehicles for hauling equipment and personnel to the worksite. The Contractor shall not load tractors or mowers on public highways unless authorized by the BLM representative(s).
IV. MEASUREMENT AND PAYMENT
A. Measurement of Payment
1. Work will be measured and paid for by the number of acres that are satisfactorily completed to specifications.
2. Total acres completed will be measured on the planar by a GPS unit.
3. The measurement will be rounded up to the nearest whole acre.
4. Partial payments are allowed for acres treated via invoice submittal.
5. Re-measurement of the acreage under this Contract will be made upon the written request of the Contractor.
a. Request for re-measurement must be made in writing within 10 calendar days after the project has been completed.
b. If re-measurement indicates a difference of not more than 5% from the original measurement, the Contractor shall pay the actual cost of the re-measurement.
c. Payments will be based on the second measurement where the difference between measurements is more than 5%.
d. Where the difference is less than 5% the results from the first measurement will be used.
6. Mobilization includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations which must be performed or cost incurred prior to beginning work and after completion on the various items on the project site.
a. All costs associated with mobilization need to be incorporated into the total cost per acre for mowing and seeding.
B. Basis of Payment
Audrey Whetham Cross-Out
Evaluation Factors
TECHNICAL:
Offerors shall submit documentation describing their Technical Capability to perform the services requested in the Statement of Work. Documentation shall include, at a minimum:
1. Provide a work plan describing:
a) Your personnel for the contract and any relevant experience for them,
b) Relevant experience for the company,
c) How you will complete the project in the required number of contract days, including any temporary delays for weather, or other unexpected issues,
d) How you plan to mobilize,
e) Experience working in remote areas.
2. Describe your methods proposed for mowing such as equipment you will use, ground crew configuration, and other ground equipment used in support of mowing operations and experience working with this configuration.
PAST PERFORMANCE:
Offerors shall submit the following information as part of their proposal for both the offeror and proposed major subcontractors. Offeror is cautioned that sufficient information must be presented to enable the Government to evaluate the Contractor's proposed past performance and determine relevancy to this project.
The offeror shall provide at minimum three projects completed during the past three years for similar and relevant services drill seeding. Provide a brief narrative of the relevant projects. It is desirable, but not required, that references be other Federal Agencies.
If an offeror or the proposed employees for the offeror do not have a past performance history relevant to this solicitation, the offeror can request a neutral rating and will not be evaluated favorable or unfavorable on this factor. Offeror will have to demonstrate that their equipment has the capability to meet the specification requirements before award would be made. Include the following current information for each contract and subcontract. References will be used for past performance evaluations. It is the quoter’s responsibility to ensure contact references are provided with current and accurate contact information.
References shall include:
1. Name of Project
2. Name of Agency/Entity
3. Contract Number
4. Location of Project
5. Type of project
6. Project Acreage
7. Total cost for Project
8. Contracting Officer or Administrative contracting officer (including phone number)
9. Contract Officer Representative (COR), Project Inspector (PI) or Project Manager
(including phone number)
10. Identify if Primary Contractor or Subcontractor.