This document contains questions and answers from a post-site visit related to solicitation number 140L3722R0007 for the NIFC 405 HGR fire system replacement project. Key details include that the contractor is to demolish and remove the existing 12-gauge storage rack system and provide a new system as specified. The contractor is also to remove the existing shelving system and dispose of it offsite. Addendum 1 removed the requirement for a breaker testing instrument from the specification. Addendum 1 also provided the available fault current for the 15kV oil-filled transformer and the current load coordination study information. The panel is to be replaced as noted on drawings E002 and E101. Due to long material lead times, the period of performance has been adjusted to 200 days and interior work limiting building occupancy is restricted to the days described in the project schedule. Clearances are provided for card readers, fire pull stations, and door control hardware to fit between doors and nearby obstructions. The existing cable raceway system is to be used to support and allow movement of conductors and communication wiring to movable doors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NIFC_405-HGR_Fire_Safety_-_Bid_Schedule-V2_0003.pdf | ||
| NIFC_405-HGR_Fire_Safety_-_Prologue_5-6-2022_Addendum_3_0003.pdf | ||
| Sol_140L3722R0007_Amd_0003.pdf | ||
| Sol_140L3722R0007_Amd_0002.pdf | ||
| Sol_140L3722R0007_Amd_0001.pdf | ||
| Site_Visit_Roster_0001.pdf | ||
| NIFC_405-HGR_Fire_Safety_-_Prologue_4-26-2022_0001.pdf | ||
| BLM_NW31_Addenda_1_0001.pdf | ||
| NIFC_405-HGR_Fire_Safety_-_Specs.pdf | ||
| Clauses_Provisions.pdf | ||
| Sol_140L3722R0007.pdf | ||
| CertificationVaccination.pdf | ||
| NIFC_405-HGR_Fire_Safety_-_Bid_Schedule.pdf | ||
| NIFC_405-HGR_Fire_Safety_-_Prologue.pdf | ||
| NIFC_405-HGR_Fire_Safety_-_Plans.pdf | ||
| B08_SF1442_HowTo_1Nov2021.pdf | ||
| Wage_Determination_ID20220025_02-25-2022.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Fire and Aviation 3833 S Development Ave
Boise, Idaho 83705-5354
POST SITE VISIT Q&A 4/25/2022
NIFC 405-HGR Fire Safety Solicitation Number 140L3722R0007
# CONTRACTOR QUESTIONS GOVERNMENT RESPONSE
1 On drawing A101 Sheet Note 18: It notates a new 12 gauge storage rack system to be Unicor and then goes into dimensions as if this system is to be provided as a part of the proposal/contract.
When on the site walk I noticed an existing shelving system in the exact locations the drawings are showing the new system.
I also have not found a demo note specifying the removal of the existing system.
Existing storage racks to be demolished and removed.
Contractor to provide new storage rack system as specified.
2 Is it the Government’s intention to have the existing shelving system removed and replaced with a new Unicor system.?
If so, what would the Gov’t like to have done with the existing shelving system.
Contractor to remove existing shelving system and dispose off‐site.
3 Spec 262416. Paragraph 2.7 Do you really want a breaker testing instrument? This is thousands of dollars, and you need staff trained to operate the equipment.
All breakers need to be removed from the panel to use current injection test equipment.
If you want this, please provide a specification what equipment you are wanting.
See Addendum 1. Item was removed from specification.
4 Provide the Available Fault Current at the 15kV Oil Filled Transformer.
See Addendum 1. Information was provided on E002.
5 Provide the current Load Coordination Study for the hanger.
We are unaware of any item in the contract requiring this information.
6 Can you provide a written (SOW) Scope Of Work for the project?
See Specification 011000
7 The panel schedule for Panel 100 says to refer to the One Line for the AIC rating. On the one Line there is no AIC Ratting provided.
See Addendum 1. Information was provided on E002.
8 The One Line for Panel 100 says PROVIDE
WITH INTERGRAL SURGE PROTECTION.
Is this a new Panel 100 or a new TVSS in Existing Panel 100?
Panel is to be replaced as noted on E002 and E101.
9 What is your plan in the new material delivery environment we are now in [long material lead time]?
Market investigation has been performed to evaluate current material lead time. Due to investigation POP has been adjusted to 200days.
Construction impacting the interior of the building and requiring the building to be unoccupied shall be limited to the days described in the prolog.
10 Is there clearance between the two hanger bay doors for the Card Reader to fit?
The outside door clearance is 4”, between the sheet metal panel and the nearest building obstruction.
The inside door clearance is 17”, between the sheet metal panel and the nearest building obstruction.
11 Is there clearance between hanger bay door and the building for the fire pull station and door control hardware?
The inside door clearance is 17”, between the sheet metal panel and the nearest building obstruction.
12 What method of installation has the design engineer planned on for us to install the conductors to movable doors?
Contractor to use existing cable raceway system to support and allow movement of conductors and communication wiring.
13 Can you verify that any new exposed Fire Alarm is to be RED EMT conduit?
No requirement describing red EMT serving the Fire Alarm.