This is Amendment 0001 to Solicitation No. 140L3626Q0046 for the Christenot Mill Stabilization project issued by the Bureau of Land Management (BLM) Montana State Office in Billings. The amendment incorporates questions and answers from interested contractors regarding the project scope and site conditions.
The solicitation concerns stabilization work at the Christenot Mill, located at approximately 7,600 feet elevation near Summit, Montana, approximately 32 feet north of a rough dirt road accessible by truck or UTV. Key project details include: a stream located 200 feet east of the site and Alder Gulch approximately 1 mile to the northwest; the original mill construction utilized Natural Hydraulic Lime (NHL) with local sand, though previous repairs used varying quality Portland-cement mortars; contractors must follow 2022 condition assessment recommendations and use appropriate NHL mortar with local sand, with limited mortar analysis or on-site compatibility testing strongly advised before large-scale repointing; NHL requires damp curing for approximately 7 days under controlled conditions with protection from freezing and rapid drying—standard concrete curing blankets and direct heat sources are ineffective or counterproductive, necessitating alternative protection methods such as insulating blankets, plastic sheeting, burlap, or temporary enclosures; and average daily temperatures exceed 40°F from May 18 through September 24, with average daily lows above 40°F only from July 9 through August 17, constraining practical masonry work within the performance period of September 15, 2026 through October 31, 2028. Contractors must acknowledge receipt of this amendment prior to the deadline specified in the original solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_8_-_Removal_Depth.mov | MOV file | |
| Attachment_4_-_Back_Wall_and_Multipatch.MOV | MOV file | |
| Attachment_6_-_Last_Priority.MOV | MOV file | |
| Attachment_1_-_SOW_-_Christenot_Mill_Stabilization.pdf | ||
| Attachment_5_-_Failing_Patch.MOV | MOV file | |
| Sol_140L3626Q0046.pdf | ||
| Attachment_9_-_Wage_Determination.pdf | ||
| Attachment_2_-_Drawings_-_Christenot_Mill_Stabilization.pdf | ||
| Attachment_3_-_Consultation.pdf | ||
| Attachment_7_-_Nuance.MOV | MOV file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jorge Alvarez
See continuation page
BLM MT-STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
BLM MT STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
LMA
LMA
140L3626Q0046
08/10/2026
07/30/2026
1 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140L3626Q0046/0001
See the details of the amendment below:
Period of Performance: 09/15/2026 to
10/31/2028
PROJECT DESCRIPTION: Christenot Mill Stabilization Solicitation No. 140L3626Q0046
Description of Changes - This amendment incorporates the following information:
1. Adds questions asked by interested contractors as well as the Government’s answers.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
Questions and Answers
Q1. How wide is the trail to the site?
A1. The site is fenced off with a buck and rail fence with about a 2- or 3-ft gap to enter the site.
Q2. How long is the trail from a Private/public road?
A2. There is not much of a trail to the site since it is very close to the road. The mill is 32 feet north of the dirt road. The dirt road is rough but drivable in a truck or UTV.
Q3. How far away is the nearest water source?
A3. There is a stream 200 feet to the east of the mill. I do not know if this stream is always flowing or if it can run dry. Additionally, Alder Gulch is about 1 mile to the northwest.
Q4. Has a mortar Analysis been completed?
A4. The Smyth report (and the background section of the SOW) state that the original construction used Natural Hydraulic Lime (NHL) with local sand, produced from local limestone. Previous repairs mixed Portland-cement mortars of varying quality; some should stay, some must be removed.
Q5. Is a mortar analysis required for this project? (NHL comes in different degrees of Hardness and a mortar analysis would be helpful) A5. Not explicitly required by the SOW. However, the SOW directs the contractor to follow the 2022 condition assessment recommendations and to use appropriate NHL mortar with local sand. Because NHL is available in different hydraulic grades (NHL 2, 3.5, 5) and the original mix proportions are unknown, a limited mortar analysis (or at least on-site compatibility testing of the proposed NHL mix against remaining original mortar) is strongly advisable before large-scale repointing. The Smyth report emphasizes matching the “living,” breathable properties of the original NHL rather than using Portland-based or overly hard modern mixes.
Q6. The Consultation report suggests concrete blankets and heaters. Neither are a good option with Natural Hydraulic lime.
A6. The Smyth consultation (p. 2–3) states that NHL requires damp curing (not simple drying), protection from freezing, and protection from rapid drying by sun/wind. It recommends concrete blankets plus heat for cold nights and canvas/burlap/plastic for hot, sunny, or windy days.
A. Concrete blankets work with heat produced as Portland Cement cures; they will be of little use with NHL products AA6. Standard concrete curing blankets rely primarily on the heat of Portland-cement hydration and provide limited value for pure NHL.
B. Heaters will cause flash drying of the lime and will lead to failure.
AB6. Direct, high-heat sources (propane heaters, etc.) risk flash-drying NHL and should be avoided.
A.6. Contractors must still provide effective moisture retention and freeze protection (insulating blankets, plastic sheeting, burlap, temporary enclosures, or low-output heat only if carefully controlled to maintain damp conditions without rapid drying). The key requirement from both the Smyth report and the drawings is that NHL must damp-cure for approximately 7 days under controlled conditions and must not freeze. Scaffolding cannot be moved until upper sections have cured sufficiently.
Q7. Question is when do the ave temps begin to dip below 40 in the project site area?
A7. The mill sits at ~7,600 ft (Drawing Sheet 1). In Summit, MT (a mile to the west and 640 feet lower than the Christenot Mill), the average daily temperature is above 40°F from May 18 through September 24, and the average daily low temperature is above 40°F from July 9 through August 17. Nighttime freezes remain possible outside that narrow window. Work scheduling and curing protection must account for this (SOW performance window is 15 Aug 2026 – 31 Oct 2028; practical masonry work will be constrained by temperature and curing requirements).
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .