This is a Technical Specifications document for the 2025 Phillips Reservoirs Repair project issued by the Bureau of Land Management's Malta Field Office in Montana. The document details the technical requirements for repairing four reservoirs in Phillips County, approximately 55-60 miles south of Malta, Montana.
The specifications cover repairs at Taint, Paleface, Whiteface, and Wapati Reservoirs. Key work elements include excavation (12,600 CY total), embankment construction (7,200 CY total), riprap installation (352 CY across three classifications), geotextile fabric installation (726 SY), permanent erosion control using Flexamat Plus (3,200 SY), compost soil amendment (200 CY), and culvert pipe installation (100 LF of 36-inch HDPE pipe at Taint Reservoir). The document includes detailed requirements for earthwork, materials testing, construction methods, quality control, and environmental considerations. Work must occur between July 15 and November 30 due to wildlife concerns. Specifications require contractors to protect existing structures, control water during construction, and restore disturbed areas with topsoil and specified seed mix. The document contains extensive technical requirements for erosion control materials, geotextiles, riprap gradations, and soil compaction standards.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2025 PHILLIPS RESERVOIRS REPAIR
BUREAU OF LAND MANAGEMENT
PHILLIPS COUNTY, MONTANA
TECHNICAL SPECIFICATIONS
BUREAU OF LAND MANAGEMENT
MALTA FIELD OFFICE
501 SOUTH 2ND STREET EAST
MALTA, MT 59538
DECEMBER 2024
THIS PAGE IS INTENTIONALLY LEFT BLANK
2024 Phillips Reservoirs Repair Table of Contents 12/18/2024
TECHNICAL SPECIFICATIONS
TABLE 0F CONTENTS
DIVISION 1 – GENERAL REQUIREMENTS
Section 01010 Summary of Work Section 01050 Field Engineering Section 01150 Measurement and Payment Section 01200 Project Meetings Section 01300 Submittals Section 01400 Quality Control/Quality Assurance Section 01600 Material and Equipment Section 01700 Contract Closeout
DIVISION 2 – SITEWORK
Section 02110 Clearing Section 02275 Riprap Section 02300 Earthwork Section 02350 Permanent Erosion Control (Flexamat Plus) Section 02370 Geosynthetics Section 02724 Outlet Works Section 02910 Restoration and Topsoiling
RELATED DOCUMENTS
WORK DATA SHEET
DRAWINGS – Bound Separately
2024 Phillips Reservoirs Repair SUMMARY OF WORK
12/18/2024 01010-1
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01010 – SUMMARY OF WORK
PART 1 - GENERAL
1.01 WORK INCLUDED:
This project will repair the following reservoirs: Spillway and dam embankment repair for Taint Reservoir, Paleface Reservoir, and Whiteface Reservoir. Dam embankment repair for Wapati Reservoir. All four of these reservoirs are in Phillips County, Montana approximately 55 to 60 miles south of Malta, Montana. Major items of work for each reservoir include:
Taint Reservoir:
• If necessary, dewater reservoir and construction area.
• Remove culvert at existing spillway.
• Knock down sides of head cuts at existing spillway. Slope and shape sides as per contract drawings.
• Install new HDPE culvert. Build headwall with hand-laid riprap at culvert inlet and build rip rap headwall and stilling basin at culvert outlet.
• Excavate dike and secondary spillway along right side of primary spillway. Grade banks to a smooth surface sloped as per contract drawings.
• Use excavation from head cut and new secondary spillway to raise crest elevation of dam embankment, build up upstream face of dam embankment, and extend embankment at right end of dam.
• Shape and slope primary spillway below culvert stilling basin. Prepare spillway channel and embankments for permanent erosion control installation by placing topsoil, top with 1 inch of compost, and incorporate perennial seed mix.
• Install permanent erosion control (Flexamat Plus) along primary spillway and along the left and right embankments.
• Prepare surface and install riprap at downstream end of primary and secondary spillways.
• Reclaim all disturbed areas including staging areas, borrow areas, and temporary roads.
Replace topsoil, add compost, and prepare soil for seeding as per specifications.
• Reseed all rebuilt, disturbed, and reclaimed areas with perennial seed mix.
Paleface Reservoir:
• If necessary, dewater reservoir and construction area.
• Remove rip rap from existing spillway and stockpile.
• Remove and dispose of culvert at existing spillway. Fill and compact back to original grade.
• Knock down sides of head cut at existing spillway. Backfill to match downstream slope of existing dam embankment.
• Excavate new spillway to the left side of the existing dam embankment. Location noted
12/18/2024 01010-2 on contract drawings.
• Use excavation from new spillway to build new dike to plug old spillway, raise crest elevation of dam embankment, and build up upstream face of dam embankment. Dam face and dike embankments shall be built to 3:1 slope.
• Grade both banks of new spillway to a 3:1 slope to a smooth surface for the entire length, tapering back to existing natural grade.
• Prepare spillway channel and embankments for permanent erosion control installation by placing topsoil, top with 1 inch of compost, and incorporate perennial seed mix.
• Install permanent erosion control (Flexamat Plus) in new spillway.
• Install riprap at base of new spillway. Reuse stockpiled riprap along with new riprap.
• Reclaim all disturbed areas including staging areas, borrow areas, and temporary roads.
Replace topsoil, and compost, and prepare soil for seeding as per specifications.
• Reseed new spillway, new dike, and all rebuilt, disturbed, and reclaimed areas with perennial seed mix.
Whiteface Reservoir:
• If necessary, dewater reservoir and construction area.
• Excavate and contour area in front of inlet of existing culvert to direct water flow toward inlet.
• Raise the crest elevation across the upstream edge of the existing secondary spillway inlet with a dike to regulate flow into the spillway. Align this spillway crest along the access road. See detail 3/12 of contract drawings.
• Knock down and excavate sides of head cuts at primary spillway.
• Fill and shape area around existing culvert inflow and fortify with hand-laid riprap headwall.
• Fill and shape area around existing culvert outflow and build riprap headwall and stilling basin.
• Shape primary spillway beyond stilling basin and grade embankments of spillway to a smooth surface at a 2:1 slope or flatter.
• Prepare primary spillway surface and embankments for permanent erosion control installation by placing topsoil, top with 1 inch of compost, and incorporate perennial seed mix.
• Install permanent erosion control (Flexamat Plus).
• Prepare surface and install riprap at downstream end of permanent erosion control
(Flexamat Plus).
• Knock down and reshape the area of head cuts at the secondary spillway. Make a gradual sloping grade from edge of natural grade to base of head cut.
• Prepare secondary spillway surface and embankments for permanent erosion control installation by placing topsoil, top with 1 inch of compost, and incorporate perennial seed mix.
• Install permanent erosion control (Flexamat Plus) along this new gradual sloping grade.
Note: It is important to provide a smooth transition at the upstream end of the permanent
12/18/2024 01010-3 erosion control (Flexamat Plus) to ensure the direction of water flow into the spillway.
• Install riprap at the downstream end of permanent erosion control (Flexamat Plus).
• Raise the crest elevation and build up upstream face of dam embankment with excavated material from primary and secondary spillways. Taper grade gradually to existing grade beyond left side of built-up dam embankment.
• Reclaim all disturbed areas including staging areas, borrow areas, and temporary roads.
Replace topsoil, add compost, and prepare soil for seeding.
• Reseed all rebuilt, disturbed, and reclaimed areas with perennial seed mix.
Wapati Reservoir:
• To the extent necessary, dewater reservoir and construction area.
• There is a large slide area on the downstream side of the dam embankment toward its left side.
• Excavate the slide in the downstream face of the dam embankment to below and beyond the slide plane on all sides of the slide to completely remove the slide area.
• Rebuild the dam crest elevation back to 4 feet above existing spillway crest elevation.
• Use borrow fill to build up the upstream face of dam embankment to a 3:1 slope and minimum crest width of 12 feet over entire length of the dam embankment.
• Install permanent erosion control (Flexamat Plus) on upstream face of rebuilt dam embankment (No compost or seeding required under this mat).
• Reclaim all disturbed areas including staging areas, borrow areas, and temporary roads.
Replace topsoil, add compost, and prepare soil for seeding.
• Reseed dam embankment and all rebuilt, disturbed, and reclaimed areas with perennial seed mix.
1.02 CONTRACTOR USE OF PREMISES:
Confine operations to the site of the proposed Work or within the right-of-way or construction easements provided and shown on the drawings. Construction camps and staging areas outside the construction area must be approved by the Contracting Officer (CO). Obtain advance approval from the CO of all staging areas, excavated soil stockpile and waste areas and camp areas.
It shall be understood that the responsibility for protection and safekeeping of equipment and materials on or near the site will be entirely that of the CONTRACTOR and that no claim shall be made against the GOVERNMENT by reason of any act of an employee or trespasser whether GOVERNMENT has paid CONTRACTOR for equipment or materials in storage or not. It shall be further understood that should any occasion arise necessitating access by the GOVERNMENT to the sites occupied by these stored materials and equipment, the CONTRACTOR owning or responsible for the stored materials or equipment shall immediately remove same. No materials or equipment may be placed upon the property of the GOVERNMENT until the CO has agreed to the location contemplated by the CONTRACTOR to be used for storage. CONTRACTOR is solely responsible
12/18/2024 01010-4 for obtaining and shall pay all costs in connection with any additional work area, storage sites, access to the site, or temporary right-of-way, which may be required for proper completion of the Work.
No waste fluids from equipment (such as fuel, oil, grease, or antifreeze) shall be drained or spilled on the ground. All waste fluids shall be captured and disposed of properly offsite. Of a waste fluid is accidentally spilled on the ground, the Contractor shall excavate the spill area to a depth 12 inches below contaminated material, remove excavated material from the worksite and dispose of it properly offsite, at the Contractor’s expense.
1.03 PROTECTION OF EXISTING UTILITIES:
Utility service connections are generally shown on the drawings, but the CONTRACTOR is solely responsible for locating all existing underground installations, including service connections, in advance of excavating or trenching, by contacting 811, or 1-800-424-5555 (Montana 811.org) or the owners thereof and prospecting. The CONTRACTOR shall use his own information and shall not rely solely upon information shown on the drawings concerning existing underground installations.
Repair all damage to existing utilities or property at CONTRACTOR's expense.
1.04 PROTECTION OF EXISTING STRUCTURES:
Where excavation will be required adjacent to existing structures, the CONTRACTOR is solely responsible to maintain the structural integrity of the existing structures. Take whatever means necessary to ensure that the existing structures are not damaged. Repair all damage to the existing structures at CONTRACTOR's expense. Repair any fences destroyed or damaged during construction to the satisfaction of the government. Unless otherwise noted on the Construction Drawings, restore all existing ditches disturbed by construction to their original size, line, and grade.
Structures located downstream of the dam shall also be protected during reservoir dewatering activities. Restore or repair to original condition roads, culverts, bridges, cattleguards and fences or any other structures damaged by the CONTRACTOR’s activities and access to the sites at no additional cost to the project.
1.05 FIELD CHECK OF EXISTING STRUCTURES:
Dimensions and elevations of existing structures and locations of existing fences, pipelines, conduits, cables, and equipment shown on the drawings were taken for the most part from available records and survey data and are not guaranteed for accuracy.
Check all dimensions and elevations of existing structures, pipelines, conduits, cables, equipment, or other existing items, both above and below ground, affected by or affecting the Work under this contract, prior to the start of construction or ordering materials and equipment affected thereby.
1.06 SITE ACCESS:
Determine the adequacy of all roads, culverts, cattleguards, and bridges used in moving or gaining
12/18/2024 01010-5 access for equipment and materials to the construction site. Provide alternative methods of access, such as a temporary crossing for any equipment that exceeds the structural limits of existing facilities.
Improvements for road access including fill, culverts, and fencing to remain after project completion as approved by CO.
Access to the Work:
1. Access to the Work: Access to the work area shall be on existing public roads. Any public or private roads including cattle guards, gates and culverts, or any off-road travel areas damaged in any way by the Contractor’s operations shall be restored by the Contractor, at the Contractor’s expense, to the same condition existing prior to the commencement of work.
2. Access to the work shall be provided by and at the Contractor's expense. Prior to the building of access routes across lands under the jurisdiction of the Bureau of Land Management, the Contractor shall obtain approval of the Contracting Officer.
3. Public or private access roads damaged by the Contractor shall be restored, at the Contractor's expense, to the same condition they were in at the commencement of work.
4. Access to construction shall be accomplished with regard for environmental considerations.
1.07 SEQUENCING AND SCHEDULING:
Permitted Work Period: Work on this project can only occur between July 15th and November 30th during any calendar year to accommodate wildlife concerns in the vicinity.
Climatic Conditions: No work required under this section will be allowed when materials are frozen or excessively wet.
Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, submit an updated schedule within 3 calendar days. As a minimum, the estimated start and completion dates shall be shown in the schedule.
1.08 QUALITY ASSURANCE:
Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract
12/18/2024 01010-6 incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
1.09 DELIVERY, STORAGE, AND HANDLING:
Delivery: Protect products incorporated into the work from damage while in transit to the site.
Storage: Provide temporary storage facilities for products. Storage shall comply with the manufacturer's instructions. The storage area shall permit access for inspection and handling.
Handling: The Contractor shall replace, at his expense, any products damaged by loading, hauling, and unloading.
1.10 FIELD OFFICES AND SHEDS:
Provide field offices and storage sheds required for completion of the work. Locate these temporary structures in areas approved by the CO. All expenses for telephone, utilities, security, and waste disposal are the responsibility of the CONTRACTOR. Provide the name and telephone number of a representative who may be contacted after hours in case of emergency.
1.11 SOILS:
The following design criteria would be included with this action:
1. Construction activities shall not be performed during periods when the soil is too wet to adequately support equipment/vehicles. If equipment/vehicles create ruts more than three inches deep, operations must cease as the soil will be deemed too wet to adequately support equipment/vehicles.
2. Erosion control and sediment containment BMPs (i.e., straw wattles, silt fence, erosion control blankets, Mats, etc.) shall be installed if needed, and as directed by the CO, to aid in stabilization and capture of sediment until vegetation reestablishes to effectively control erosion and sediment.
3. Where soils are disturbed and topsoil is present, topsoil shall be stripped, separated from subsoil/parent material, and stockpiled for use in reclamation.
1.12 WILDLIFE:
Surface disturbing activities will not be permitted between March 15th and July 15th to mitigate impacts to Greater sage-grouse breeding and nesting activities.
12/18/2024 01010-7
1.13 LIVESTOCK:
Livestock may be present in the area during construction. If livestock become a hinderance to the work, contractor shall notify the CO, and the government will remediate the issue.
1.14 INVASIVE VEGETATION:
Vehicles and equipment shall be washed and cleaned of plant seeds prior to entering the project area, and between moving to new sites, to prevent the introduction of invasive plants/seeds.
An inventory and possible treatment of the sites should be done prior to the commencement of the project so that the presence / absence of invaders can be identified and dealt with.
Monitor project areas prior to project completion for newly established noxious and invasive plant populations. Integrated weed management will continue to be implemented on public lands.
1.15 PREPARATION:
Work Layout: The Government will set survey stakes and monuments to give the Contractor measurements, lines, and grades necessary for the work executed under the Contract. Survey stakes, monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.
Work Limits and Control Points: Will be staked and established by the Contracting Officer.
1.16 PROJECT MONUMENT:
Requirements: Save any existing project monument at start of repair work. Replace monument at completion of repair work.
1.17 SALVAGEABLE ITEMS:
Requirements: Salvageable items to be removed from the site shall become the property of the Contractor. All materials salvaged off the individual sites will be removed from government property and legally disposed of. All fees associated with the removal and disposal shall be paid for by the contractor. Burning or burying of removed materials is not permitted on government property.
1.18 DISPOSAL OF DEBRIS:
Requirements: Items or debris to be removed from the site, but not designated as salvageable items for the Government, shall become the property of the Contractor. Disposal of materials
12/18/2024 01010-8 offsite in a legal manner and payment of disposal fees required is the Contractor's responsibility.
Burning or burying of removed materials is not permitted on government property.
1.19 REFERENCES:
References to documents, such as ASTM, shall be for the current printing.
1.20 ABBREVIATIONS:
AASHTO - American Association of State Highway and Transportation Officials ASTM - American Society for Testing and Materials AWWA – American Water Works Association CO - Contracting Officer HDPE – High-density polyethylene OSHA - Occupational Safety and Health Act SDR – Standard Dimension Ratio
PART 2 - PRODUCTS - NONE
PART 3 - EXECUTION - NONE
PART 4 - PAYMENT – NONE
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
Payment: No direct payment for the work described under this section will be made. Payment for this item will be included in the bid price for other items of the contract.
END OF SECTION 01010
2024 Phillips Reservoirs Repair FIELD ENGINEERING 12/18/2024 01050-1
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01050 - FIELD ENGINEERING
GOVERNMENT will establish primary control with control points adjacent to the Work site.
GOVERNMENT will develop and provide any necessary surveys, grade stakes, and benchmark.
CONTRACTOR is responsible to perform measurements and maintain controls to complete the construction as staked by the government in the field. If the initial staking completed by the GOVERNMENT is destroyed in the construction process the CONTRACTOR is responsible for the cost of any re-staking that is required.
1.02 PRESERVATION OF REFERENCE POINTS:
Carefully preserve benchmarks, reference points, section corners, and stakes and, in case of destruction, the CONTRACTOR is responsible for the resetting of such points and responsible for any mistakes that may be caused by their loss or disturbance.
PART 2 - PRODUCTS – NONE
PART 3 - EXECUTION – NONE
PART 4 - MEASUREMENT AND PAYMENT:
4.1 METHOD OF MEASUREMENT:
Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT:
Payment: No direct payment for the work described under this section will be made.
The Contractor shall include consideration for this item in the bid price for other items of the contract.
END OF SECTION 01050
2024 Phillips Reservoirs Repair MEASUREMENT AND PAYMENT 12/18/2024 01150-1
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01150 - MEASUREMENT AND PAYMENT
1.01 SCOPE:
The method of measurement and basis of payment is described in this section.
1.02 GENERAL:
A. Bid price for each item of the Contract covers all Work shown on the Drawings and required by the specifications and other Contract Documents.
B. All costs are included in the unit and lump-sum prices bid including all materials, equipment, supplies, and appurtenances; all construction plant, equipment, and tools; and all labor and supervision necessary to fully complete the Work.
C. No item that is required by the Contract Documents, for the proper and successful completion of the Work, will be paid for outside of or in addition to the prices submitted in the Bid.
D. All work not specifically set forth as a pay item in the Bid Form is considered an incidental obligation of the CONTRACTOR, and all costs in connection therewith shall be included in the unit prices bid.
1.03 ESTIMATED QUANTITIES:
A. All quantities in the Work Date Sheet, Bid Schedule, or other Contract Documents are approximate only, and are to be used only as:
1. A basis for estimating the probable cost of the Work, and
2. For comparing Bids submitted for the Work.
B. Actual work performed, and materials furnished under the unit-price items for those items to be field measured may differ from the estimated quantities.
C. Payment will be paid at the unit price bid for listed items successfully completed according to Contract requirements.
D. Lump-sum items will be paid at the lump-sum price bid for the items listed.
1.04 AUTHORITY:
A. Contracting Officer will perform all measurements and compute quantities for payment.
12/18/2024 01150-2
B. Contracting Officer will verify measurements and quantities provided by CONTRACTOR.
C. CONTRACTOR provides access to work areas for survey measurements, as required.
1.05 MEASURED QUANTITIES:
A. Measurement by Volume: Measured by cubic dimension using mean length, width, and height or thickness.
1. Fill quantities will be computed using the average-end-area method or other computation method approved of by the Contracting Officer.
B. Measurement by Area: Measured by square dimension using mean length and width. Items that are measured by area will be measured parallel to the ground surface.
C. Linear Measurement: Measured by linear dimension at the item centerline or mean chord.
Items that are measured by the lineal foot will be measured parallel to the ground surface, unless otherwise specified.
D. Stipulated Sum/Price Items: Measured by weight, volume, area, or linear means, or combination, as appropriate, as completed items or units of the work.
E. Lump-Sum Items: Will not be measured for payment. Interim measurements may be made to monitor work progress.
1.06 SCHEDULE OF VALUES:
A. A schedule of values or “allocation of contract price” is required for all lump sum items.
B. The schedule of values is used only to help assess the intermediate value of work completed for the purpose of making progress payments. The schedule of values is not considered as a commitment to prices in the event of later negotiations.
1.07 MEASUREMENT AND PAYMENT ITEMS:
Mobilization & Preparatory Work: Consists of preparatory work and operations performed by the CONTRACTOR, including but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of facilities necessary for all work on the project; for premium on bonds and insurance for the Contract; and for other work and operations that must be performed or costs incurred before beginning work on the various items on the project site. Payment for this item shall be included in Mobilization Bid Item price.
Mobilization costs for subcontracted work are also considered included.
12/18/2024 01150-3
Topsoil Stripping & Replacement: Consists of stripping, stockpiling, and replacing topsoil from all staging, borrow, excavation, embankment, and waste areas. This will include reseeding of replaced topsoil with a mix of perennial forbs and grasses in accordance with the Contract Documents. Compost will be added to the replaced topsoil on all embankment slopes as noted in Section 02910 of these Specifications. Removal of woody vegetation and trees are considered incidental to this item. Payment for this item shall be included in the bid price for other items in the contract.
Excavation: Consists of excavation and stockpiling or wasting as necessary to construct work in accordance with the Contract Documents. See the Work Data Sheet for ESTIMATED excavation volumes for each reservoir. Payment for this item shall be included in each Site Pay Item 02300(1) price.
Muck Excavation: Consists of excavation and wasting, as necessary, to remove muck (saturated soil) from the area of the following locations: 1) Minor excavation and contouring of area in front of inlet of existing spillway culvert of Whiteface Reservoir; 2) Embedment trench at bottom edge of Flexamat erosion control on upstream face of Wapati Reservoir dam embankment. Wasting will be in areas as directed by the CO. Muck excavation is minor to this project, is considered incidental to the excavation work, and shall be considered in payment of Excavation.
Compacted Embankment: Consists of loading from stockpiles, excavating from construction areas and borrow areas, and hauling, placing, and compacting embankment in accordance with the Contract Documents. Embankment areas include spillways, dam embankments, and dikes. See the Work Data Sheet for embankment volumes for each reservoir. Payment for this item shall be included in each Site Pay Item 02300(2) price.
Water Control/Dewatering: Consists of dewatering the reservoirs and other water control measures that may be necessary to complete the Work in accordance with Contract Documents. Includes all design, equipment, facilities (including, but not limited to pumps, hoses, trenches, dikes, wells, sediment control), and operation required to maintain excavations and work areas free from water.
This item also includes removal of dewatering facilities upon completion of construction. The Contractor is responsible to design and maintain all construction water control features to prevent damage to the Work. Payment for this item will be considered incidental to the Work and shall be included in the bid price for other items in the contract.
Riprap: Consists of supplying from offsite sources, transporting existing riprap on site, and placing riprap in the designated spillway sections in accordance with the Contract Documents. Supplying and installing geotextile filter fabric between riprap and subgrade is considered incidental to this item. Riprap has been classified into 3 sizing categories. Refer to Section 02275 for gradation, the Work Data Sheet for sizes and volumes, and the Drawings for placement locations. Payment for this item shall be included in the Pay Item 02275(1) price of bid items No. 1 – Taint Reservoir, No. 2 – Paleface Reservoir, and No. 3 – Whiteface Reservoir.
12/18/2024 01150-4
Stabilization Geotextile Fabric: Consists of furnishing and installing geotextile stabilization filter fabric in accordance with the Contract Documents. Payment for this item shall be included in the Pay Item 02275(1) price of bid items No. 1 -Taint Reservoir, No. 2 – Paleface Reservoir, and No.
3 – Whiteface Reservoir.
Flexamat Plus Permanent Erosion Control: Consists of furnishing, hauling, and installing Flexamat Plus permanent erosion control on the designated spillway sections and dam embankment in accordance with the Contract Documents. Payment for this item shall be included in each Site Pay Item 02350(1) price.
Placing & Seeding Amended Embankment: Consists of furnishing, hauling, uniformly placing, and lightly incorporating a one-inch thickness of compost over all new embankments, spillways, and dikes in accordance with the Contract Documents. The Contactor shall also furnish, haul, and incorporate a perennial seed mix into all compost amended embankments, spillways, and dikes.
Payment for this item shall be included in each Site Pay Item 02910(1) price.
Outlet Works: Consists of furnishing, hauling, and installing outlet spillway pipe in the designated spillway section at Taint Reservoir in accordance with the Contract Documents. Payment for this item will be included in the Pay Item 02724(1) price of bid item No. 1 – Taint Reservoir.
PART 3 - EXECUTION – NONE
PART 4 – MEASUREMENT AND PAYMENT:
4.1 METHOD OF MEASUREMENT:
Units: The work described in this section shall not be measured for payment.
4.2 BASIS FOR PAYMENT:
Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the
END OF SECTION 01150
2024 Phillips Reservoirs Repair PROJECT MEETINGS 11/06/2023 01200-1
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01200 - PROJECT MEETINGS
1.01 PRE-CONSTRUCTION CONFERENCE:
A. A pre-construction conference will be held prior to the start of work. CONTRACTOR will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
B. CONTRACTOR, subcontractors, and the persons responsible for coordination of the work are required to be present at the meeting.
C. CONTRACTOR is required to be prepared to summarize and explain procedures planned for the project and to present any required pre-construction submittals.
D. CONTRACTOR, if contractor chooses to use materials not specifically outline in the contract, they are required to provide submittal details of those materials or methods proposed to be used in construction.
1.02 MID-CONSTRUCTION CONFERENCE:
A. Mid-construction conferences may be held during construction. CONTRACTOR will be notified in advance of meeting time, date, and place. The purpose will be to review required and completed work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
B. CONTRACTOR, subcontractors, and the persons responsible for coordination of the work are required to be present at the meeting.
1.03 CLOSEOUT CONSTRUCTION CONFERENCE:
A. A closeout construction conference will be held after all construction has been completed.
CONTRACTOR will be notified in advance of the meeting time, date, and place. The purpose will be to review completed work, payroll, cleanup, and final payments.
B. CONTRACTOR, subcontractors, and the persons responsible for coordination of the work are required to be present at the meeting.
11/06/2023 01200-2
PART 3 - EXECUTION
3.01 PROJECT MEETINGS
A. Pre-Work Conference:
1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.
3. Be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.
B. Progress Meetings:
1. To be held at the project site, or as determined by the Contracting Officer.
2. May be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.
C. Final Inspection:
1. To be held at the project site, or as determined by the Contracting Officer.
2. Notify the Contracting Officer in writing at least 5 working days before the completion date so the Government can schedule final inspection.
3. The superintendent shall be present during this inspection.
11/06/2023 01200-3
PART 4 - PAYMENT – NONE
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made.
Consideration for this item shall be included in the bid price for other items of this contract.
END OF SECTION 01200
2024 Phillips Reservoirs Repair SUBMITTALS 11/06/2023 01300 - 1
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 – SUBMITTALS
1.01 DESCRIPTION:
This section includes the procedures for submittals. Items that need to be reviewed by the GOVERNMENT are included.
3.01 SUBMITTAL PROCEDURE:
A. Coordinate all submittals and review them for accuracy, completeness, and compliance with contract requirements; and indicate CONTRACTOR's approval thereon as evidence of such coordination and review. Items submitted without evidence of the CONTRACTOR's approval will be returned for resubmission.
B. Date and Number: Forward to GOVERNMENT at least 30 days prior to needing approval or delivery to the site, all items required by the individual sections of the specifications. Unless a different number is called for in the individual sections, submit six copies of each submittal, six copies of all operation and maintenance instructions, and four specimens of each sample requested, of which all but two copies will be retained by GOVERNMENT. The other copies will be returned to the CONTRACTOR along with the GOVERNMENT's comments. If the CONTRACTOR wants more than two copies returned, submit the number of additional copies desired.
C. Cover Letter: Forward all submittals with a cover letter from the CONTRACTOR, identifying the project and the portion of the Project to which it applies. Submittals that are related to or affect each other shall be forwarded simultaneously as a package to facilitate a coordinated review.
Uncoordinated submittals will be rejected. The GOVERNMENT reserves the right to require submittals in addition to those called for in individual sections.
D. Electronic Submittals: An internet based electronic submittal and review system will be available for this project. The use of this system will be organized by the Government at no cost to the Contractor and will be the means for receiving and reviewing submittals.
11/06/2023 01300 - 2
3.02 GOVERNMENT'S APPROVAL:
The GOVERNMENT will indicate approval or disapproval of each submittal and, if not approved, will indicate reasons therefor. Any work done prior to approval shall be at the CONTRACTOR's own risk. Any work done, or materials provided, prior to approval will not be eligible for payment until approval is obtained. Approvals do not relieve the CONTRACTOR from responsibility for complying with the requirements of this Contract. If submittals show variations from the Contract requirements, the CONTRACTOR shall describe such variations in writing, in the cover letter at the time of submission. The request for a variation shall include a proposal addressing the net effect on contract price and time.
3.03 REQUIRED SUBMITTALS:
A. Permits: Submit to the Contracting Officer at the preconstruction conference a copy of all permits required by the governing authorities not obtained by the Government.
B. Subcontractors: At the preconstruction conference, provide a list of all suppliers and subcontractors to be used on the project and a completed Form SF1413 (form provided at the end of this section) for each subcontractor.
C. Certificates: For those items called for in individual sections, furnish certificates from manufacturers, suppliers, or others certifying that materials or equipment being furnished under the Contract comply with the requirements of these specifications.
D. Work Schedule and Progress Payment Schedule: Submit a Work Schedule and an estimated Progress Payment Schedule.
3.04 SUMMARY OF PROJECT- SPECIFIC REQUIRED SUBMITTALS: The following is a summary of submittals, by section, required by these specifications. Consult individual sections for a more complete description of individual requirements.
11/06/2023 01300 - 3
List of Submittals*
Submittal Number Submittal
Specification Reference Date Due**
01150-1 Schedule of Values for Lump Sum Items 01150 ** 01300-1 Contractor-Obtained Permits 01300 Preconstruction Conf.
01300-2 List of Subcontractors & Suppliers with completed
Form SF1413 for each subcontractor 01300 Preconstruction Conf.
01300-3 Work Schedule 01300 Preconstruction Conf.
01300-4 Estimated Progress Payment Schedule 01300 ** 02275-1 Rip Rap Source / Test Results 02275 ** 02300-1 Embankment Construction Plan/Proposed Work
Schedule 02300
02350-1 Flexamat Plus Shop Drawings 02350 ** 02910-1 Seed Mix Specifications 02910 ** *This list is not intended to be exhaustive; consult individual sections.
**Due date for all submittals is 30 days prior to needing approval or delivery to the site, unless stated otherwise.
11/06/2023 01300 - 4
END OF SECTION 01300
2022 Phillips Reservoirs Repair QUALITY CONTROL/ QUALITY ASSURANCE 11/06/2023 01400-1
DIVISION 1 - GENERAL SECTION 01400 - QUALITY CONTROL/
REQUIREMENTS QUALITY ASSURANCE
1.01 DEFINITIONS:
A. Quality Control - planned and specific actions or operations necessary to produce a product that complies with the contract documents. Quality control consists of actions, inspections, sampling, and testing necessary to ensure the work follows the contract documents and to control production and construction processes. Quality control is keyed to the construction sequence to quickly determine when the work is out of compliance with the contract documents and to respond to correct the situation and bring the work into compliance. Quality control is the responsibility of the CONTRACTOR.
B. Quality Assurance – planned and systematic observations, testing, and actions to verify that the work complies with the contract documents. Quality assurance includes oversight of the CONTRACTOR’s quality control, verifying the results of the CONTRACTOR’s testing and additional assurance sampling and testing. The GOVERMENT will provide quality assurance at a level determined necessary by the Contracting Officer.
C. Verification/Compliance Testing – sampling and testing which is carried out independent of the CONTRACTOR’s quality control testing to confirm/verify that the work complies with the contract documents. The frequency of verification/compliance testing will be determined by the Contracting Officer. Verification/compliance testing will not be used to determine construction procedures or operations (i.e., rolling patterns, lift thickness, etc.). Verification/compliance testing will be provided by the Contracting Officer.
PART 2 - PRODUCTS - NONE
PART 3 - EXECUTION
3.01 COOPERATION WITH QUALITY ASSURANCE:
A. Assure that the GOVERNMENT and Contracting Officer always have access to all work areas while work is in progress.
B. Notify the Contracting Officer when the work is ready for quality assurance/quality control testing. Establish and update the construction schedule to provide the Contracting Officer estimated sampling/testing dates and times. Contracting Officer may choose to obtain a split and comparison test of any samples collected for quality control testing. Provide adequate notice of testing plans to coordinate collection of samples.
END OF SECTION 01400
2024 Phillips Reservoirs Repair MATERIAL AND EQUIPMENT 12/18/2024 01600 - 1
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01600 - MATERIAL AND EQUIPMENT
1.01 COMPLETION OF WORK:
It is understood that, except as otherwise specifically stated in the Contract Documents, the CONTRACTOR shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, supervision, temporary construction of any nature, and all other services and facilities of any nature whatsoever necessary to execute, complete, and deliver the Work within the specified time.
1.02 CONTRACTOR RESPONSIBILITY:
Store materials to insure the preservation of their quality and fitness for the Work. Locate stored materials to be incorporated in the Work to facilitate prompt inspection by the GOVERNMENT. The CONTRACTOR is responsible for the condition and security of all materials furnished by CONTRACTOR and shall replace all such material found to be defective or which has been damaged after delivery. This includes the replacement of material which is found to be defective at any time prior to expiration of the guarantee period.
1.03 MANUFACTURER'S RECOMMENDATIONS:
Apply, install, connect, erect, use, clean, and condition manufactured articles, materials, and equipment as directed by the manufacturer.
1.04 SAMPLES:
Provide materials, supplies, and equipment in accordance with samples submitted by the CONTRACTOR and approved by the Contracting Officer.
PART 3 - EXECUTION - NONE
2024 Phillips Reservoirs Repair MATERIAL AND EQUIPMENT 12/18/2024 01600 - 2
PART 4 - PAYMENT – NONE
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item will be included in the bid price for other items of the
END OF SECTION 01600
2024 Phillips Reservoirs Repair CONTRACT CLOSEOUT 11/06/2023 01700-1
DIVISION 1 - GENERAL REQUIREMENTS SECTION 01700 - CONTRACT CLOSEOUT
1.01 DESCRIPTION:
The work covered under this section includes items required in final closeout of this Project. Included are items such as post-construction inspection, acceptance of the work, closeout records and Project record drawings.
1.02 SUBMITTALS:
Provide closeout submittals for approval prior to final payment.
PART 2 - PRODUCTS
2.01 MISCELLANEOUS PRODUCTS:
Provide all maintenance materials, spare parts, tools, keys, and other items either required in the Contract Documents or furnished by the suppliers of the various products.
3.01 CLEANING:
Remove all tools, equipment, surplus materials, and rubbish. Repair all marred surfaces, and remove grease, dirt, stains, and foreign materials from finished surfaces.
3.02 POST-CONSTRUCTION INSPECTION:
Prior to expiration of the one-year correction period, the GOVERNMENT will inspect the Project to determine whether corrective work is required. The CONTRACTOR will be advised 5 days prior to inspection and notified in writing of all deficiencies. CONTRACTOR shall attend the post-construction inspection.
END OF SECTION 01700
2024 Phillips Reservoirs Repair CLEARING 11/06/2023 02110-1
DIVISION 2 – SITEWORK SECTION 02110 - CLEARING
PART 1 - GENERAL
1.01 WORK INCLUDED:
The work within this section consists of removing all trees, root balls, shrubs, brush, tall grass, and similar vegetation as necessary to complete the Work.
PART 2 - PRODUCTS – NONE
3.01 REQUIREMENTS:
Remove all trees, shrubs, brush, tall grass, and similar vegetation in conflict with the Work. Perform all clearing in a safe, prudent, and lawful manner and only within the construction limits indicated on the Drawings and staked in the field. Dispose of all trees onsite in a slash pile at no additional cost to the GOVERNMENT. Trees will have their limbs removed and will be cut into 5 foot or shorter sections. Remove no trees from the site without approval from the CO. No trees shrubs or other vegetation will be buried.
3.02 TOPSOIL REUSE:
Do not use topsoil removed by stripping for backfill or constructing embankments.
PART 4 - PAYMENT – NONE
PART 4: MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Payment for this item will be included in the bid price for other items of the contract.
END OF SECTION 02110
2024 Phillips Reservoir Repairs RIPRAP 12/18/2024 02275-1
DIVISION 2 – SITEWORK SECTION 02275 RIPRAP
PART 1 - GENERAL
1.01 WORK INCLUDED:
Material requirements for furnishing riprap from offsite source and placement as specified in Contract Drawings.
1.02 SUBMITTALS:
A. Submit source of riprap.
B. Submit laboratory test results that show conformance to the material requirements of this section.
1.03 REFERENCES:
The publication(s) listed below form a part of these specifications to the extent referenced. The publications are referred to by the basic designation only.
C. American Society of Testing and Materials (ASTM)
1. ASTM C88 Test Method for Soundness of Aggregates by
Use of Sodium Sulfate or Magnesium Sulfate
2. ASTM C127
3. ASTM C535
Test Method for Density, Relative Density, and Absorption of Coarse Aggregate Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
4. ASTM D4992 Standard Practice for Evaluation of Rock to be Used for Erosion Control
5. ASTM D5312 Test Method for Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions
6. ASTM D6473 Test Method for Specific Gravity and Absorption of Rock for Erosion Control
2.01 ROCK:
A. Riprap provided from offsite shall be hard, durable, dense, angular in shape, reasonably well-graded, sound rock fragments resistant to abrasion, free of cracks, shale, seams, clay, organic
12/18/2024 02275-2 material, and defects that would hasten degradation by water, weathering, and frost action.
B. Quarried rock or boulders for use as riprap on this Project from offsite shall have the following properties:
1. Bulk specific gravity (saturated-surface dry): 2.50 minimum, (apparent specific gravity minimum: 2.60) when tested in accordance with ASTM D6473.
2. Absorption: 2 percent of less, when tested in accordance with ASTM D6473.
3. Sodium sulfate soundness, loss: 10 percent loss or less for five cycles, when tested in accordance with ASTM C88, 5 cycles.
4. Resistance to abrasion, loss: 10 percent or less after 100 revolutions and 40 percent or less after 500 revolutions, when tested in accordance with ASTM C535.
5. Resistance to freeze thaw, loss: 10 percent or less, when tested in accordance with
ASTM D5312.
C. Shape:
1. Angular boulders or cobbles are acceptable. Do not use rounded stone or boulders from a streambed source as riprap. Do not use shale or stone with shale seams.
2. The stone will be accepted based on visual analysis, the Government’s riprap form, or both. Submit samples before placing the riprap.
3. Each stone must have its greatest dimension not greater than three times its least dimension.
D. Gradation: Furnish stone that is reasonably well-graded conforming to the gradation listed in Table 02275-1.
12/18/2024 02275-3
TABLE 02275-1
RIPRAP GRADATION
Riprap Class
Weight (pounds)
Diameter* (inches)
Percent Smaller by Weight
12-inch 95 12 100 50 9 65-90 30 7 25-50 5 4 Not to exceed 10**
Class II 700 24 100 500 22 70-90 200 16 60-40 30 8 Not to exceed 10**
Class III 2000 34 100 1400 30 70-90 700 24 60-40 40 9 Not to exceed 10**
*Diameter of the median dimension when measuring length, depth, and breadth.
** Include rock spalls or cobbles in an amount to just fill spaces between larger rocks, but not in excess. Larger-sized rock should be in point-to-point contact. Minimum rock size of 4 inches.
3.01 AREAS TO RECEIVE EROSION PROTECTION
1. Place riprap erosion protection to the lines and grades as shown on the Contract Drawings. Do not place riprap until surface has been prepared, and approved by the
CO.
3.02 PLACING
A. Subgrade Preparation:
1. Excavate, fill, or grade foundation soils in accordance with Section 02300 so riprap limits are as indicated on the Contract Drawings or as directed by the CO.
2. Install non-woven geotextile fabric underlayment on prepared surfaces. Ensure required manufacturer’s Recommendations for overlaps are maintained and outer edges of geotextile are buried a minimum of 1 foot below grade. Geotextile fabric specifications are outlined in section 02370, Geosynthetics.
12/18/2024 02275-4
B. Slope-protection rock need not be hand-placed (except at culvert inlets) or compacted but shall be handled and dumped to avoid material segregation. Riprap should be placed with an average depth as specified on the Contract Drawings. Riprap should be placed consistently and evenly throughout the marked areas.
C. Hand place 12-inch riprap at culvert inlet protection for Taint and Whiteface Reservoirs. This involves laying of rocks in an interlocking pattern with the voids between the larger rocks filled with smaller rocks. The finished surface shall be kept relatively even to decrease flow turbulence at the culvert inlet.
D. Place Class II riprap so that larger rocks are evenly distributed, and smaller rocks filling the spaces.
E. Place Class III riprap at floor and slopes of stilling basins at Taint and Whiteface Reservoirs.
Place riprap so that larger rocks are evenly distributed, with smaller rocks filling the spaces. Place rocks in such a way as to maximize dissipation of energy of water flow by creating rough and irregular surfaces at the basin.
F. Dump and smooth by moving rocks into position so that material, when in place, is stable.
G. Begin slope-protection at toe and proceed up the slope.
H. Leave no unfilled spaces within slope protection.
4.01 METHOD OF MEASUREMENT:
A. Units: Riprap supply and installation will be measured in cubic yard of rock installed and will be measured using neat lines. Riprap supply and installation will include transportation from offsite source locations. Supply and install geotextile fabric and place riprap as per specifications and Contract Drawings.
4.02 BASIS OF PAYMENT:
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item: Pay Unit:
02275(1) Rip Rap with Geotextile Fabric Cubic Yards
END OF SECTION 02275
2024 Phillips Reservoirs Repair EARTHWORK 12/18/2024 02300-1
DIVISION 2 - SITEWORK SECTION 02300 – EARTHWORK
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Unauthorized excavation consists of excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Contracting Officer (CO).
Unauthorized excavation, as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .