This statement of work describes the procurement of two 20,000 gallon ribbed, horizontal fiberglass storage tanks by the Bureau of Land Management Billings Field Office. The tanks will replace an open pit system currently used to service livestock water on a BLM grazing allotment in cooperation with Milton Ranch, LLC. Bidders must provide, transport, and offload the tanks at the Sundance Lodge ware yard in Laurel, Montana by the required delivery date. Each tank must meet specifications including a minimum wall thickness of 0.375 inches, dimensions of approximately 12 feet diameter and 26 feet length, and capacity of 20,000 gallons or as approved by the contracting officer. Additional requirements include manways, fittings, access openings, storage saddles, and an internal ladder. The successful bidder must provide tanks manufactured according to applicable ASTM standards and covered under the manufacturer's warranty for underground and potable water tanks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Q_A_Doc_0001.docx | DOCX document | |
| Sol_140L3623Q0048_Amd_0001.pdf | ||
| A04_Statement_of_Work.pdf | ||
| A04_Schedule_of_Items.pdf | ||
| Sol_140L3623Q0048.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2023 Milton Storage Tanks
DOI-BLM-MT-C010
July 2023
Billings Field Office
5001 Southgate Drive
Billings, MT 59101
Statement of Work
Table of Contents
1 Background
2 Scope
3 General
4 Products
5 Delivery Location
6 Warranty
P a g e | 1
1 Background
The Bureau of Land Management (BLM) Billings Field Office (BiFO) is partnering with Milton
Ranch, LLC on upgrading the water storage system servicing the BLM grazing allotment. The project will involve purchasing two 20,000 gallon storage tanks to replace the open pit system currently in place to be used for non-potable water to service livestock, 2 Scope
Procure two 20,000 gallon ribbed, horizontal fiberglass storage tanks. Labor associated with plumbing and setting the tanks is not part of the scope.
It is the contractors’ responsibility to provide, transport, and off load the tank at the Sundance
Lodge ware yard managed by the Billings BLM Field Office, 2424 Thiel Road, Laurel, MT
59044. From Laurel, Montana, take Highway 212 (the road to Red Lodge) over the Yellowstone
River. About 1 mile past the bridge, turn east (left) onto Thiel Road. Drive down Thiel Road 1.3 miles to the ware yard on the south side of the road. The BLM will require three days’ notice before delivery to ensure the gate to the ware yard is open, and the Contracting Officer
Representative can be available to accept delivery.
3 General
Quality Assurance
A. Governing Standards, as applicable:
1. Tank manufacturer shall be in the business of manufacturing tanks to applicable standards.
2. Tank shall be manufactured to meet or exceed ASTM D3299, ASTM D4097, and AWWA
D120.
Submittals
A. Product Data: Include rated capacities, accessories, appurtenances, and furnished specialties for each surface water-storage tank indicated.
1. Shop Drawings: Show fabrication and installation details for each water-storage tank, including the following:
a. Tank and shell openings.
b. Man-way extensions and hatches.
c. Plans, elevations, sections, details, and attachments to other work.
d. Certification of Occupation Safety and Health Administration conformance. (Manways, etc.)
e. Anchor details and material list for temporary ware yard storage.
P a g e | 2
4 Products
Two Single-Wall Fiberglass Reinforced Plastic (FRP) Storage
Tanks
A. Loading Conditions – Tanks shall meet the following design criteria:
1. Internal Load – Tanks shall withstand a 5-psig air-pressure test with 5:1 safety factor.
2. Tanks shall support accessory equipment – such as internal pump platforms, drop/fill tubes, submersible pumps and ladders – when installed according to tank manufacturers current
Installation Manual and Operating Guidelines.
3. Tanks shall have a structural wall thickness of a minimum 0.375” or thicker if load calculations require.
B. Installation conditions:
1. Tanks will be installed by the BLM grazing permittee, and not be the responsibility of the successful contractor.
2. Both tanks would be buried up to half the diameter.
B. Product Storage
1. Both Tanks shall be capable of storing approximately 20,000 gallons of water products with specific gravity up to 1.1.
2. Tanks shall be vented to atmospheric pressure.
3. Tanks shall be capable of storing products identified in the manufacturer’s current standard limited warranty.
C. Materials
1. Tanks shall be manufactured with 100% resin and glass-fiber reinforcement with no sand fillers.
D. Tank Dimensions
1. Tanks shall have a capacity of 20,000 plus gallons, or Government Contracting Officer(CO) approved.
2. Tanks shall have nominal outside diameter of approximately 12 feet.
3. Tank shall have approximate overall length of 26 feet.
Accessories
A. Manways
1. Each tank shall have one manway, it shall be flanged and 30"-nominal diameter, complete with gasket, bolting hardware and FRP cover, and approximately 3 feet from the inside flange, see internal ladder description below.
2. Actual location shall be shown on tank shop drawings, and approved by CO.
P a g e | 3
3. Each manway shall have an extension constructed of FRP. Length will be approved on shop drawing. The extension shall be designed to withstand all expected loads.
4. All tanks for stock water use require at least one manway, and extension.
5. Approved shop drawings provided by the contractor shall show exact location of the manway.
B. Fittings
1. Each tank shall have one air vent fitting at the top of the radius of the tanks. These fittings shall be 2 inches, flat faced, and flanged, and shall conform to ANSI B16.5 150 # bolting pattern.
2. One tank shall have a FRP top dome nozzle that shall be 4 inches, flat-faced and flanged, and shall conform to ANSI B16.5 150 # bolting pattern, which will be the overflow, and will also need a 3” flat faced flange fitting inside the tank, mounted on the left bottom dome fitting.
3. The tank with the overflow will have two FRP bottom dome nozzles, and one tank needs only one FRP bottom dome nozzles, they shall be 3 inches, flat-faced and flanged, and shall conform to ANSI B16.5 150 # bolting pattern.
C. Access Openings
1. FRP access openings shall be 30” in diameter
2. PVC Risers and FRP lids shall be provided by the tank manufacture for field installation on access openings.
3. Lockable manway.
D. Storage saddles
1. Saddles will be provided to the BLM for short term storage of the tanks in the BLM ware yard.
E. External Ladder
1. No external ladder shall be required.
F. Internal Ladder
1. Each tank will have one internal ladder about 3 feet from the inside flange.
2. The ladder per tank will be 16 feet in length and constructed out of fiberglass.
5 Delivery Location
A. Sundance ware yard (BLM FO Admin Site)
2424 Thiel Road
Laurel, MT 59044
6 Warranty
Warranty
A. Warranty shall be manufacturer’s warranty for underground water and potable water tanks in effect at time of delivery.