Answers_to_RFIs_7-25-2022_0002.docx

DOCX document 13 KB Posted

Attached to
SECURITY SYSTEM INSTALL FIRE CACHE
Solicitation number
140L3622Q0020
Issued by

View the file

Other files

File Type Posted
Sol_140L3622Q0020_Amd_0002.pdf PDF
Answers_to_RFIs_7-22-2022_0001.docx DOCX document
Sol_140L3622Q0020_Amd_0001.pdf PDF
WD_2015-5389_rev_17.pdf PDF
SOW_Security_System_Billings_Fire_Cache_(2).docx DOCX document
Sol_140L3622Q0020.pdf PDF
Project_Location_Map.docx DOCX document
Site_Map_Equipment_and_Camera_Location.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANSWERS TO RFIs 7/25/2022

Will there be any emt conduit required or will existing conduit be used? NO – the existing cabling is not in conduit, and I am not requesting conduit for the new runs unless it is required by law.

Is the building two stories or two separate warehouses?

Two separate buildings with a buried conduit between the buildings - this is accessible and is about 6” inches in diameter Are the warehouse an open warehouse? Yes, but i would recommend you do a site visit Are most of the runs in drop ceiling tile? No – only three of the ten runs will be above the drop ceiling.

How many days of recording for storage? The most we can get using a 4 TB NVR Will there be continuous recording 24/7? Depends, will continuous recoding be a more cost-effective option versus motion detection? If so, then yes 24/7.