Answers_to_RFIs_7-25-2022_0002.docx
DOCX document 13 KB Posted
- Attached to
- SECURITY SYSTEM INSTALL FIRE CACHE
- Solicitation number
- 140L3622Q0020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3622Q0020_Amd_0002.pdf | ||
| Answers_to_RFIs_7-22-2022_0001.docx | DOCX document | |
| Sol_140L3622Q0020_Amd_0001.pdf | ||
| WD_2015-5389_rev_17.pdf | ||
| SOW_Security_System_Billings_Fire_Cache_(2).docx | DOCX document | |
| Sol_140L3622Q0020.pdf | ||
| Project_Location_Map.docx | DOCX document | |
| Site_Map_Equipment_and_Camera_Location.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANSWERS TO RFIs 7/25/2022
Will there be any emt conduit required or will existing conduit be used? NO – the existing cabling is not in conduit, and I am not requesting conduit for the new runs unless it is required by law.
Is the building two stories or two separate warehouses?
Two separate buildings with a buried conduit between the buildings - this is accessible and is about 6” inches in diameter Are the warehouse an open warehouse? Yes, but i would recommend you do a site visit Are most of the runs in drop ceiling tile? No – only three of the ten runs will be above the drop ceiling.
How many days of recording for storage? The most we can get using a 4 TB NVR Will there be continuous recording 24/7? Depends, will continuous recoding be a more cost-effective option versus motion detection? If so, then yes 24/7.