Q_A_Doc_0001.docx

DOCX document 12 KB Posted

Attached to
SCHNELL TRAIL IMPROVEMENTS Federal contract opportunity
Solicitation number
140L3421Q0017
Issued by
Department of the Interior Bureau of Land Management Montana-Dakotas

View the file

Other files for this federal contract opportunity

Other files attached to SCHNELL TRAIL IMPROVEMENTS, newest first.
File Type Posted
Sol_140L3421Q0017_Amd_0001.pdf PDF
B03 Wage Determination.pdf PDF
A06 Specifications.pdf PDF
Past Performance Questionnaire.doc DOC document
A06 Drawings.pdf PDF
Sol_140L3421Q0017.pdf PDF
A06 Schedule of Items.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHNELL TRAIL REPAIR-140L3421Q0017

QUESTION AND ANSWER DOCUMENT

Q.1. The drawings (Sheet 4 of 5 of the attached document) are calling for "Tread Material" to be the top portion of the trail construction. However, nothing in the specs describes what "Tread Material" is. Could you elaborate on what fill is considered "Tread Material"?

A.1 . Drawing Sheet 4 of 5 is labeled "Standard Trail Terms." This drawing is simply an illustration of terms used in trail construction to help better define those terms, and the contract specifications specifically state in Part 3.01.A.2. of MT-02796 that "All Trail Excavation shall be full bench excavation." Full bench excavation is described in Part 1.02.G. of MT-02796 as "Where the entire trailbed is constructed on undisturbed material." Therefore, there will be no tread material fill required, and the trailbed will consist of the natural material.

File details come from the government source that posted it. Updated .