Sol_140L3121Q0004_Amd_0001.pdf

PDF 87 KB Posted

Attached to
Little Rockies Fire Station Re-Siding, 2021
Solicitation number
140L3121Q0004
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3121Q0004 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LML

LEWISTOWN MT 59457

920 NE MAIN STREET

BLM CENTRAL MT DISTRICT OFC(MTl000)

LML

LEWISTOWN MT 59457

920 NE MAIN STREET

BLM CENTRAL MT DISTRICT OFC(MTL000)

02/26/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/26/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

*** RFQ Amendment #0001 ***

This request for quote is amended to include questions and answers from site tour that happened on March 10, 2021.

Question: Is the soffit vented? Answer: Yes, the soffit panels specified are center vented see Siding 07460-page 4 section C.

Question: Is the Fascia metal is the only metal to be replaced? Answer: Yes, the contractor shall reuse the gable flashing, and drip edge.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gina Merwin

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L3121Q0004/0001

Question: Is the Brick molding to be replaced?

Answer: That is not part of this contract, this project only includes the metal siding and flashing.

Question: How is the siding to be coordinated around the wood decks? Answer: The contractor shall propose a finish detail for around the deck on each building for the government's approval.

Question: What color is the siding, facia, and soffits? Answer: Color of materials need to be submitted to the government for approval.

Question: Can the contractor have material dropped off? Answer: YES, Materials may be dropped off at the side before construction begins with the conditions that the contractor is required to off load and place the materials.

Government employees will not be available for material handling.

Protection of materials. The contractor will have space in the fenced ware yard to store materials, with the understanding that the contractor is wholly responsible for their safety. The contractor is responsible for providing cones, barriers, tape, or any other methods to protect their materials until accepted by the government installed in place on the buildings.

Question: Will rat guard will not be required?

Answer: NO

Question: Can contractors camp on the site?

Answer: There will be space on the site for up to

3 campers without hookups.

Period of Performance: 05/03/2021 to 09/01/2021