BOISE DISTRICT EQUIPMENT SHED ROOF REPAIR
Solicitation number
140L2626Q0058
Issued by

About this file

This is a specification document for the Boise District Equipment Shed Roof Repair project, a federal construction contract for the United States Department of Interior – Bureau of Land Management. The project is located at 3948 South Development Way, Boise, Idaho 83705, and involves selective demolition of damaged roof trusses and metal roofing, installation of new metal-plate-connected wood trusses, and replacement sheet metal roofing.

The project requires strict adherence to work hour restrictions (8 AM to 5 PM, Monday through Friday, excluding federal holidays), maintenance of building access and emergency vehicle routes, and a nonsmoking policy across federal property. The contractor must submit a waste management plan within 14 days of Notice to Proceed, addressing salvage, recycling, and disposal of demolition materials. Structural design is delegated to the contractor and must comply with 2024 International Building Code, 2024 International Existing Building Code, and ASCE/SEI 7-2022 standards, classified as Risk Category I. New wood trusses must match existing profile, geometry, and bay configuration, with minimum chord sizes of 2 by 6 inches nominal for top chords and 2 by 4 inches nominal for bottom chords. Trusses require Simpson H1AZ or H2.5AZ x 2 hurricane tie hardware with Strong Drive SD Connector Screws. Sheet metal roofing must be exposed fastener type with 36-inch width coverage, galvanized or aluminum-zinc alloy-coated steel sheet (ASTM A 653/A 653M or A 792/A 792M), 26-gauge nominal thickness, and manufacturer's two-coat fluoropolymer finish with not less than 70 percent PVDF resin by weight. The roofing and fastener pattern must be rated for wind uplift resistance per UL 580/UL 1897 or FM 4471, with calculations or manufacturer's span/fastener tables demonstrating compliance. The manufacturer provides a 10-year finish warranty and the installer provides a one-year materials and workmanship warranty.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boise District Equipment Shed Roof Repair

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 PROJECT INFORMATION

A. Project Identification: Boise District Equipment Shed Roof Repair.

1. Project Location: 3948 South Development Way, Boise Idaho, 83705.

B. Owner: United States Department of Interior – Bureau of Land Management.

1.2 WORK RESTRICTIONS

A. Contractor's Use of Premises: During construction, Contractor will have full use of building and adjacent area. Contractor's use of premises is limited only by Owner's right to perform work and as follows:

1. Owner will occupy premises during construction. Perform construction only during normal working hours 8 AM to 5 PM Monday thru Friday, other than Federal holidays), unless otherwise agreed to in advance by Owner. Clean up work areas and return to usable condition at the end of each work period.

2. Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated.

1. Weekend Hours: As approved by Contractor Officer Representative.

C. Nonsmoking Building: Smoking is not permitted within the boundaries of the Federal Government property

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 1

SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Action Submittals:

1. Waste Management Plan: Submit plan within 14 days of date of Notice to Proceed. Plan shall be consistent with the salvage/disposal designations stated in the SOW and with the Work Plan required under Specification Section 024119.

B. Informational Submittals:

1. Recycling and Processing Facility Records: Manifests, weight tickets, receipts, and invoices.

2. Landfill and Incinerator Disposal Records: Manifests, weight tickets, receipts, and invoices.

C. Waste Management Plan: Develop a waste management plan consisting of waste identification, waste reduction work plan, and cost/revenue analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.

1. Salvaged Materials for Reuse: Identify materials that will be salvaged and reused.

2. Salvaged Materials for Sale: Identify materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.

3. Salvaged Materials for Donation: Identify materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.

4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.

PART 2 - EXECUTION

2.1 PLAN IMPLEMENTATION

A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.

B. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site.

1. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 2

2.2 SALVAGING DEMOLITION WASTE

A. Salvaged Items for Reuse in the Work: Clean salvaged items and install salvaged items to comply with installation requirements for new materials and equipment.

B. Salvaged Items for Sale and Donation: Permitted on Project site.

C. Salvaged Items for Owner's Use: Clean salvaged items and store as directed by the Contractor Officer Representative.

2.3 RECYCLING WASTE

A. General: Recycle paper and beverage containers used by on-site workers.

B. Packaging:

1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.

2. Polystyrene Packaging: Separate and bag materials.

3. Pallets: As much as possible, require deliveries using pallets to remove pallets from

Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.

4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.

C. Wood Materials:

1. Sort and stack reusable members according to size, type, and length.

D. Metals: Separate metals by type.

2.4 DISPOSAL OF WASTE

A. Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

B. Do not burn waste materials.

END OF SECTION 017419

SELECTIVE DEMOLITION 024119 - 1

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Items indicated to be removed and salvaged remain on Government property. Carefully detach from existing construction, in a manner to prevent damage, and deliver to Government.

B. Submittals:

1. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.

2. Work Plan: Submit a written work plan for Government review and approval before beginning any selective demolition. At minimum, the work plan shall address:

a. Truss Inventory: A marked-up drawing or schedule identifying, by location, each existing truss to remain, each to be removed as damaged, and each new truss location, based on the Contractor's field survey of actual conditions (no as-built drawings exist for this structure). This inventory shall reconcile with the truss quantities specified in the SOW Project Scope and Bid Schedule prior to demolition.

b. Phasing and Sequencing: Sequence of demolition and installation activities, including confirmation that demolition of existing trusses and roofing will not begin until the delegated truss design submittal required under Specification Section 061753 has been reviewed and approved by BLM, so the extent of time the structure remains without a complete roof/truss system is minimized.

c. Temporary Shoring and Bracing: A plan for temporary shoring, bracing, or other stabilization of remaining wall framing, posts, and adjacent trusses during removal of the existing metal roof and damaged trusses, addressing any loss of building stability while work is in progress.

d. Weather and Wind Contingency: Given that the original structural failure was wind-related, the work plan shall identify wind speed or forecast thresholds above which demolition or open-roof work will be suspended, and measures to secure loose materials, partially removed roofing, and exposed framing against wind during the course of the work.

e. Protection of Elements to Remain: Measures to protect the existing east end wall siding and any other existing construction not indicated for demolition, consistent with the Requirements for Building Reuse below.

f. Schedule Milestones: Proposed dates for demolition start/completion, coordinated with the Project Schedule in the SOW and with submittal approval milestones.

C. Government will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Government operations will not be disrupted.

D. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify COR. Hazardous materials will be removed by Owner under a separate contract.

SHOP-FABRICATED WOOD TRUSSES 061753 - 1

SECTION 061753 - SHOP-FABRICATED WOOD TRUSSES

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Applicable Codes: Structural design shall comply with 2024 International Building Code (IBC), 2024 International Existing Building Code (IEBC), and ASCE/SEI 7-2022, as adopted by BLM.

BLM is the Authority Having Jurisdiction; no local building permit will be obtained by the contractor.

1. This project is classified as a Repair under IEBC Chapter 4

B. Basis of Design: This is a delegated design. BLM has determined Risk Category I applies (unoccupied storage occupancy, low hazard to human life) per ASCE/SEI 7-2022 Table 1.5-1.

The truss designer shall select, state, and justify with cited sources (e.g., ASCE Hazard Tool for the project site coordinates) the Exposure Category, ground snow load, and basic wind speed used in the design. Project site location: 3948 S Development Way, Boise, ID 83705.

C. Submittals: Product Data, Shop Drawings, structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation, and ICC-ES evaluation reports for metal plate connectors and metal truss accessories. The structural analysis submittal shall include, at minimum:

1. A design criteria summary stating Risk Category I and the Exposure Category, ground snow load, and basic wind speed selected by the truss designer, with cited sources;

2. Calculated reactions, including uplift, at each truss bearing point;

3. Hurricane tie hardware selection (see Fasteners/Installation below) with allowable uplift capacity shown alongside the calculated reaction it resists, for each bearing condition;

4. A permanent and temporary bracing diagram per TPI DSB and TPI BCSI.

D. Fabricator Qualifications: Shop that participates in a recognized quality-assurance program that complies with quality-control procedures in TPI 1 and that involves third-party inspection by an independent testing and inspecting agency acceptable to the Government.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Structural Performance: Provide metal-plate-connected wood trusses capable of withstanding design loads established per the Basis of Design without exceeding TPI 1 deflection limits.

Trusses shall match the existing truss profile, geometry, and bay configuration. Member sizing, connections, and hurricane tie hardware shall be designed per the Basis of Design above.

B. Comply with applicable requirements and recommendations of the following publications:

1. TPI 1, "National Design Standard for Metal Plate Connected Wood Truss Construction."

2. TPI DSB, "Recommended Design Specification for Temporary Bracing of Metal Plate

Connected Wood Trusses."

SHOP-FABRICATED WOOD TRUSSES 061753 - 2

3. TPI BCSI, "Guide to Good Practice for Handling, Installing, Restraining & Bracing Metal Plate Connected Wood Trusses."

C. Wood Structural Design Standard: Comply with applicable requirements in AF&PA's "National Design Specifications for Wood Construction" and its "Supplement."

2.2 MATERIALS

A. Lumber: DOC PS 20 and applicable rules of lumber grading agencies certified by the American Lumber Standards Committee Board of Review, any species, graded visually or mechanically.

1. Provide dry lumber with 19 percent maximum moisture content at time of dressing.

B. Minimum Chord Size for Roof Trusses: 2 by 6 inches nominal for top chords, 2 by 4 inches nominal for bottom chords.

C. Connector Plates: Shall be specified to meet the requirements of the truss configuration and construction.

D. Fasteners: Where trusses are exposed to weather or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.

E. Hurricane Tie Hardware: Simpson H1AZ or H2.5AZ x 2, or equivalent, with Strong Drive SD Connector Screws or manufacturer-recommended equivalent fasteners. Hurricane tie hardware system shall demonstrate allowable uplift restraint equal to or greater than the calculated uplift shown in the structural analysis submittal, and corrosion resistance equal to or better than the specified hardware.

2.3 FABRICATION

A. Assemble trusses using jigs or other means to ensure uniformity and accuracy of assembly with joints closely fitted. Fabricate wood trusses within manufacturing tolerances in TPI 1.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install and brace trusses according to TPI recommendations and as indicated. Install trusses plumb, square, and true to line and securely fasten to supporting construction.

B. Anchor trusses securely at bearing points; use metal truss tie-downs or floor truss hangers as applicable. Install fasteners through each fastener hole in metal framing anchor.

1. Simpson H1AZ or H2.5AZ x 2, OR Equivalent, with SD fasteners per manufacturers recommended attachment

SHOP-FABRICATED WOOD TRUSSES 061753 - 3

C. Install and fasten permanent bracing during truss erection and before construction loads are applied. Anchor ends of permanent bracing where terminating at walls or beams.

1. Install permanent and temporary bracing per TPI DSB, TPI BCSI, and the bracing diagram shown on the sealed truss design drawings submitted with the delegated design package.

D. Do not alter trusses in field.

E. Remove wood trusses that are damaged or do not meet requirements and replace with trusses that do meet requirements.

END OF SECTION 061753

SELECTIVE DEMOLITION 024119 - 2

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 DEMOLITION

A. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.

B. Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

C. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

D. Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

See Work Plan requirements above.

E. Requirements for Building Reuse:

1. Maintain existing building structure (including structural framing, siding and trusses) and envelope (exterior skin and framing, nonstructural roofing material) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

2. Maintain existing interior nonstructural elements not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

F. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

G. Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill. Do not burn demolished materials.

END OF SECTION 024119

SHEET METAL ROOFING 076100 - 1

SECTION 076100 - SHEET METAL ROOFING

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Submittals: Product Data and color Samples. Submittal shall also include manufacturer's documentation of wind uplift resistance (see Performance Requirements below) for the specific panel profile, gauge, and fastener pattern proposed.

B. Warranty on Finishes: Manufacturer agrees to repair or replace sheet metal roofing that shows evidence of deterioration of factory-applied finishes within 10 years.

C. Installation Warranty: Installer agrees to repair or replace components of sheet metal roofing that fail in materials or workmanship within one year.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Standard: Comply with SMACNA's "Architectural Sheet Metal Manual

B. Wind Uplift Resistance: The roofing panel and fastener pattern shall be rated for wind uplift resistance, per UL 580/UL 1897 or FM 4471, adequate to resist wind pressures calculated using the basic wind speed and Exposure Category stated in the truss delegated design submittal under Specification Section 061753, for Risk Category I. Contractor shall submit calculations or manufacturer's span/fastener tables demonstrating the proposed panel and fastener pattern meets this requirement.

2.2 ROOFING SHEET METALS

A. Panel Type: Exposed fastener metal roofing – 36” Width coverage

B. Metallic-Coated Steel Sheet: Galvanized-steel sheet, ASTM A 653/A 653M, G90, or aluminum-zinc alloy-coated steel sheet, ASTM A 792/A 792M, Class AZ50 coating designation, Grade 40 with smooth surface; 0.018-inch - 26 Ga nominal thickness.

1. Finish: Manufacturer's standard two-coat fluoropolymer system with color coat containing not less than 70 percent polyvinylidene fluoride (PVDF) resin by weight

2. Concealed Finish: Manufacturer's standard white or light-colored acrylic or polyester backer finish.

3. Style and Color shall be matched to existing sheeting based on manufacturers standard available options for profile and color.

SHEET METAL ROOFING 076100 - 2

2.3 ACCESSORIES

A. Fasteners: Wood screws, annular-threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners. Fastener type and spacing shall be as required to achieve the wind uplift resistance performance requirements specified above.

1. Exposed Fasteners: Heads matching color of sheet metal roofing using plastic caps or factory-applied coating.

B. Metal Accessories: Matching sheet metal roofing in finish and material required for a complete roofing assembly, including trim, copings, fasciae, clips, flashings, metal closures, and similar items. Use products and shapes similar to existing roof system.

C. Note that matching appearance is intended for new roof material to match the appearance of the previous roof; no actual original roof will remain as it will all be removed and replaced.

2.4 FABRICATION

1. Fabricate sheet metal roofing to comply with details shown and recommendations in

SMACNA's "Architectural Sheet Metal Manual" that apply to the design, dimensions, geometry, metal thickness, and other characteristics of installation to match existing material used on the building.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Anchor roofing securely in place, with provisions for thermal and structural movement.

B. Install work with lines and corners of exposed units true and accurate. Form exposed faces flat and free of buckles, excessive waves, and avoidable tool marks, considering metal temper and reflectivity.

C. Seal joints as shown and as required for leakproof construction.

END OF SECTION 076100

PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. Project Identification: Boise District Equipment Shed Roof Repair.
1. Project Location: 3948 South Development Way, Boise Idaho, 83705.

B. Owner: United States Department of Interior – Bureau of Land Management.

1.2 WORK RESTRICTIONS
A. Contractor's Use of Premises: During construction, Contractor will have full use of building and adjacent area. Contractor's use of premises is limited only by Owner's right to perform work and as follows:
1. Owner will occupy premises during construction. Perform construction only during normal working hours 8 AM to 5 PM Monday thru Friday, other than Federal holidays), unless otherwise agreed to in advance by Owner. Clean up work areas and return to u...
2. Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated.
1. Weekend Hours: As approved by Contractor Officer Representative.

C. Nonsmoking Building: Smoking is not permitted within the boundaries of the Federal Government property

PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
ADP772E.tmp
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Action Submittals:
1. Waste Management Plan: Submit plan within 14 days of date of Notice to Proceed. Plan shall be consistent with the salvage/disposal designations stated in the SOW and with the Work Plan required under Specification Section 024119.
B. Informational Submittals:
1. Recycling and Processing Facility Records: Manifests, weight tickets, receipts, and invoices.
2. Landfill and Incinerator Disposal Records: Manifests, weight tickets, receipts, and invoices.
C. Waste Management Plan: Develop a waste management plan consisting of waste identification, waste reduction work plan, and cost/revenue analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.
1. Salvaged Materials for Reuse: Identify materials that will be salvaged and reused.
2. Salvaged Materials for Sale: Identify materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.
3. Salvaged Materials for Donation: Identify materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.
4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.
PART 2 - EXECUTION
2.1 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
B. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site.
1. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.
2.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Reuse in the Work: Clean salvaged items and install salvaged items to comply with installation requirements for new materials and equipment.
B. Salvaged Items for Sale and Donation: Permitted on Project site.
C. Salvaged Items for Owner's Use: Clean salvaged items and store as directed by the Contractor Officer Representative.
2.3 RECYCLING WASTE
A. General: Recycle paper and beverage containers used by on-site workers.
B. Packaging:
1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.
2. Polystyrene Packaging: Separate and bag materials.
3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.
4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.
C. Wood Materials:
1. Sort and stack reusable members according to size, type, and length.

D. Metals: Separate metals by type.

2.4 DISPOSAL OF WASTE
A. Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
B. Do not burn waste materials.
ADPAA1E.tmp
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Items indicated to be removed and salvaged remain on Government property. Carefully detach from existing construction, in a manner to prevent damage, and deliver to Government.
B. Submittals:
1. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements. Submit before Work begins.
2. Work Plan: Submit a written work plan for Government review and approval before beginning any selective demolition. At minimum, the work plan shall address:
a. Truss Inventory: A marked-up drawing or schedule identifying, by location, each existing truss to remain, each to be removed as damaged, and each new truss location, based on the Contractor's field survey of actual conditions (no as-built drawings ...
b. Phasing and Sequencing: Sequence of demolition and installation activities, including confirmation that demolition of existing trusses and roofing will not begin until the delegated truss design submittal required under Specification Section 061753...
c. Temporary Shoring and Bracing: A plan for temporary shoring, bracing, or other stabilization of remaining wall framing, posts, and adjacent trusses during removal of the existing metal roof and damaged trusses, addressing any loss of building stabi...
d. Weather and Wind Contingency: Given that the original structural failure was wind-related, the work plan shall identify wind speed or forecast thresholds above which demolition or open-roof work will be suspended, and measures to secure loose mater...
e. Protection of Elements to Remain: Measures to protect the existing east end wall siding and any other existing construction not indicated for demolition, consistent with the Requirements for Building Reuse below.
f. Schedule Milestones: Proposed dates for demolition start/completion, coordinated with the Project Schedule in the SOW and with submittal approval milestones.
C. Government will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Government operations will not be disrupted.
D. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify COR. Hazardous materials will be removed by Owner under a separate contract.
PART 2 - PRODUCTS
2.1 PEFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 DEMOLITION
A. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain c...
B. Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
C. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
D. Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of...
E. Requirements for Building Reuse:
1. Maintain existing building structure (including structural framing, siding and trusses) and envelope (exterior skin and framing, nonstructural roofing material) not indicated to be demolished; do not demolish such existing construction beyond indic...
2. Maintain existing interior nonstructural elements not indicated to be demolished; do not demolish such existing construction beyond indicated limits.
F. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
G. Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill. Do not burn demolished materials.
ADP409E.tmp
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Applicable Codes: Structural design shall comply with 2024 International Building Code (IBC), 2024 International Existing Building Code (IEBC), and ASCE/SEI 7-2022, as adopted by BLM. BLM is the Authority Having Jurisdiction; no local building perm...
1. This project is classified as a Repair under IEBC Chapter 4
B. Basis of Design: This is a delegated design. BLM has determined Risk Category I applies (unoccupied storage occupancy, low hazard to human life) per ASCE/SEI 7-2022 Table 1.5-1. The truss designer shall select, state, and justify with cited sources...
C. Submittals: Product Data, Shop Drawings, structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation, and ICC-ES evaluation reports for metal plate connectors and metal truss accessories. The ...
1. A design criteria summary stating Risk Category I and the Exposure Category, ground snow load, and basic wind speed selected by the truss designer, with cited sources;
2. Calculated reactions, including uplift, at each truss bearing point;
3. Hurricane tie hardware selection (see Fasteners/Installation below) with allowable uplift capacity shown alongside the calculated reaction it resists, for each bearing condition;
4. A permanent and temporary bracing diagram per TPI DSB and TPI BCSI.

D. Fabricator Qualifications: Shop that participates in a recognized quality-assurance program that complies with quality-control procedures in TPI 1 and that involves third-party inspection by an independent testing and inspecting agency acceptable t...

PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Structural Performance: Provide metal-plate-connected wood trusses capable of withstanding design loads established per the Basis of Design without exceeding TPI 1 deflection limits. Trusses shall match the existing truss profile, geometry, and ba...
B. Comply with applicable requirements and recommendations of the following publications:
1. TPI 1, "National Design Standard for Metal Plate Connected Wood Truss Construction."
2. TPI DSB, "Recommended Design Specification for Temporary Bracing of Metal Plate Connected Wood Trusses."
3. TPI BCSI, "Guide to Good Practice for Handling, Installing, Restraining & Bracing Metal Plate Connected Wood Trusses."

C. Wood Structural Design Standard: Comply with applicable requirements in AF&PA's "National Design Specifications for Wood Construction" and its "Supplement."

2.2 MATERIALS
A. Lumber: DOC PS 20 and applicable rules of lumber grading agencies certified by the American Lumber Standards Committee Board of Review, any species, graded visually or mechanically.
1. Provide dry lumber with 19 percent maximum moisture content at time of dressing.
B. Minimum Chord Size for Roof Trusses: 2 by 6 inches nominal for top chords, 2 by 4 inches nominal for bottom chords.
C. Connector Plates: Shall be specified to meet the requirements of the truss configuration and construction.
D. Fasteners: Where trusses are exposed to weather or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.
E. Hurricane Tie Hardware: Simpson H1AZ or H2.5AZ x 2, or equivalent, with Strong Drive SD Connector Screws or manufacturer-recommended equivalent fasteners. Hurricane tie hardware system shall demonstrate allowable uplift restraint equal to or greate...
2.3 FABRICATION
A. Assemble trusses using jigs or other means to ensure uniformity and accuracy of assembly with joints closely fitted. Fabricate wood trusses within manufacturing tolerances in TPI 1.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install and brace trusses according to TPI recommendations and as indicated. Install trusses plumb, square, and true to line and securely fasten to supporting construction.
B. Anchor trusses securely at bearing points; use metal truss tie-downs or floor truss hangers as applicable. Install fasteners through each fastener hole in metal framing anchor.
1. Simpson H1AZ or H2.5AZ x 2, OR Equivalent, with SD fasteners per manufacturers recommended attachment
C. Install and fasten permanent bracing during truss erection and before construction loads are applied. Anchor ends of permanent bracing where terminating at walls or beams.
1. Install permanent and temporary bracing per TPI DSB, TPI BCSI, and the bracing diagram shown on the sealed truss design drawings submitted with the delegated design package.
D. Do not alter trusses in field.
E. Remove wood trusses that are damaged or do not meet requirements and replace with trusses that do meet requirements.
ADP3929.tmp
PART 1 - GENERAL
1.1 SECTION REQUIREMENTS
A. Submittals: Product Data and color Samples. Submittal shall also include manufacturer's documentation of wind uplift resistance (see Performance Requirements below) for the specific panel profile, gauge, and fastener pattern proposed.
B. Warranty on Finishes: Manufacturer agrees to repair or replace sheet metal roofing that shows evidence of deterioration of factory-applied finishes within 10 years.
C. Installation Warranty: Installer agrees to repair or replace components of sheet metal roofing that fail in materials or workmanship within one year.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Standard: Comply with SMACNA's "Architectural Sheet Metal Manual
B. Wind Uplift Resistance: The roofing panel and fastener pattern shall be rated for wind uplift resistance, per UL 580/UL 1897 or FM 4471, adequate to resist wind pressures calculated using the basic wind speed and Exposure Category stated in the tru...
2.2 ROOFING SHEET METALS
A. Panel Type: Exposed fastener metal roofing – 36” Width coverage
B. Metallic-Coated Steel Sheet: Galvanized-steel sheet, ASTM A 653/A 653M, G90, or aluminum-zinc alloy-coated steel sheet, ASTM A 792/A 792M, Class AZ50 coating designation, Grade 40 with smooth surface; 0.022-inch - 24 Ga nominal thickness.
1. Finish: Manufacturer's standard two-coat fluoropolymer system with color coat containing not less than 70 percent polyvinylidene fluoride (PVDF) resin by weight
2. Concealed Finish: Manufacturer's standard white or light-colored acrylic or polyester backer finish.
3. Style and Color shall be matched to existing sheeting based on manufacturers standard available options for profile and color.
2.3 ACCESSORIES
A. Fasteners: Wood screws, annular-threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners. Fastener type and spacing shall be as required to achieve the wind uplift resistance performance requirements specifie...
1. Exposed Fasteners: Heads matching color of sheet metal roofing using plastic caps or factory-applied coating.
B. Metal Accessories: Matching sheet metal roofing in finish and material required for a complete roofing assembly, including trim, copings, fasciae, clips, flashings, metal closures, and similar items. Use products and shapes similar to existing roo...
C. Note that matching appearance is intended for new roof material to match the appearance of the previous roof; no actual original roof will remain as it will all be removed and replaced.
2.4 FABRICATION
1. Fabricate sheet metal roofing to comply with details shown and recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to the design, dimensions, geometry, metal thickness, and other characteristics of installation to match existi...
PART 3 - EXECUTION
3.1 INSTALLATION
A. Anchor roofing securely in place, with provisions for thermal and structural movement.
B. Install work with lines and corners of exposed units true and accurate. Form exposed faces flat and free of buckles, excessive waves, and avoidable tool marks, considering metal temper and reflectivity.
C. Seal joints as shown and as required for leakproof construction.
END OF SECTION 076100