140L0624F0048_COVE_RAMP_FINAL_CONSTRUCTION_PLANS_REVISED_03-04-2025_0001.pdf
PDF 3 MB Posted
- Attached to
- GAOA COVE BOAT RAMP & SHORELINE
- Solicitation number
- 140L2625R0002
About this file
These are the construction drawings for the Gaoa Cove Recreation Site Boat Ramp Replacement and Shoreline Stabilization project located in Owyhee County, Idaho, prepared for the U.S. Department of the Interior Bureau of Land Management. The six-sheet technical drawing set details a comprehensive renovation of an existing boat ramp at the CJ Strike Reservoir, including a new 30-foot wide concrete boat ramp with a 6.13% grade, riprap bank stabilization, and associated site improvements.
The technical drawings specify critical design elements such as a cast-in-place concrete ramp with Class 4000A concrete, 3/4" crushed aggregate base, subgrade separation geotextile, and a unique 1" x 1" V-groove surface pattern for traction. The project also includes removing existing infrastructure, clearing and grubbing the site, implementing bank stabilization with riprap and willow plantings, and restoring surrounding areas. The project coordinates are located at approximately 42.937° N latitude and -116.826° W longitude, with an approximate water elevation of 2,467 feet at the time of survey.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
OREGON
MONTANAWASHINGTON
CANADA
NEVADA UTAH
WYOMING
IDAHO
STATE OF
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
BRUNEAU, ID
PROJECT
AREA
CJ STRIKE
RESERVOIR
G100
SHEET 1 OF 6
C O
N
ST
R U
C
TI
O N
D R
A W
IN
G
S
C O
VE R
EC
. R D
SH-78
CONTRACT NOTES
1. ALL ITEMS SHOWN OR NOTED ON PLANS WHICH ARE NOT
SPECIFICALLY BID ITEMS ARE CONSIDERED INCIDENTAL ITEMS. THE
COST OF FURNISHING AND INSTALLING ALL INCIDENTAL ITEMS WILL
NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE UNIT
PRICE BID FOR OTHER ITEMS.
GENERAL NOTES
1. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR
CONSTRUCTION, EXCEPT THE US ARMY CORPS OF ENGINEERS
SECTION 404 PERMIT, WHICH WILL BE PROVIDED BY THE
GOVERNMENT.
2. IF THERE ARE CONTRADICTIONS BETWEEN THE CODES AND
STANDARDS, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS
AT THE SITE BEFORE STARTING WORK AND SHALL IMMEDIATELY
NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OF
ANY DISCREPANCIES.
4. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS
OF THE WORKING DRAWINGS AND/OR SPECIFICATIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE GOVERNMENT BEFORE
PROCEEDING WITH ANY WORK INVOLVED.
5. DRAWINGS INDICATE THE FINISHED PRODUCT. THEY DO NOT
INDICATE A METHOD OF CONSTRUCTION. CONTRACTOR SHALL TAKE
ALL PRECAUTIONS NECESSARY TO PROTECT THE STRUCTURE
DURING CONSTRUCTION. SUCH PRECAUTIONS SHALL INCLUDE, BUT
NOT BE LIMITED TO BRACING, SHORING FOR CONSTRUCTION
EQUIPMENT, ETC.
6. ANY TEMPORARY SHORING FOR EXCAVATION AND/OR DEWATERING
IS THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL
SUBMIT PLANS TO GOVERNMENT PRIOR TO CONSTRUCTION.
7. OBSERVATION VISITS TO THE JOB SITE BY THE COR SHALL NEITHER
BE CONSTRUED AS INSPECTION NOR APPROVAL FOR
CONSTRUCTION.
8. THE CONTRACTOR SHALL PREPARE AND FURNISH TO THE COR A SET
OF RECORD DRAWINGS AT THE COMPLETION OF THE PROJECT.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING
SOURCES FOR GRANULAR MATERIAL, RIPRAP, ANY OTHER
EARTHWORK MATERIALS, WATER FOR CONSTRUCTION, AND
ADDITIONAL MATERIALS THAT MAY BE NECESSARY FOR PROPERLY
CONSTRUCTING THE PROJECT.
10. DISPOSE OF ALL MATERIALS OFF SITE AT A LOCATION AND SITE
THAT SHALL BE APPROVED BY THE GOVERNMENT AND TO BE
DETERMINED BY THE CONTRACTOR.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMING WITH
OSHA REQUIREMENTS AND OTHER SAFETY STANDARDS REQUIRED
DURING CONSTRUCTION.
12. THE CONTRACTOR SHALL PLACE AND INSTALL CONSTRUCTION
FENCING AROUND THE CONSTRUCTION SITE PRIOR TO
COMMENCING CONSTRUCTION.
13. NO CHANGES ARE TO BE MADE TO THESE PLANS WITHOUT THE
KNOWLEDGE AND CONSENT OF THE GOVERNMENT.
14. NO DEVIATIONS FROM DESIGN SHALL BE MADE WITHOUT THE
WRITTEN APPROVAL OF THE GOVERNMENT.
15. PROVIDE 14 DAYS NOTICES PRIOR TO START OF CONSTRUCTION
FOR GOVERNMENT STAFF PLANNING PURPOSES.
16. EXISTING FEATURES: EXISTING ROADWAYS, UTILITIES, STRUCTURES,
AND OTHER FEATURES ARE SHOWN USING SURVEYED
INFORMATION. ADDITIONAL UNDERGROUND FACILITIES MAY EXIST.
17. COORDINATES AND ELEVATIONS FOR THE PROJECT SITE ARE BASED
ON A SITE SPECIFIC SURVEY. CONTROL POINTS ARE IDENTIFIED ON
THE PLANS.
18. ALL EQUIPMENT SHALL BE CLEANED AND INSPECTED PRIOR TO USE
ON THE PROJECT SO AS TO PREVENT THE TRANSPORT AND SPREAD
OF NOXIOUS WEED AS WELL AS TO PREVENT SPILLS OR LEAKS OF
EQUIPMENT FLUID.
19. DISTURBANCES IN STAGING AREA SHALL BE KEPT MINIMAL, AND
SHALL BE RESTORED TO EXISTING CONDITIONS AFTER
CONSTRUCTION ACTIVITIES.
20. THE GOVERNMENT WILL ACT UPON CONTRACTOR'S SUBMITTALS OR
SHOP DRAWINGS AND TRANSMIT A RESPONSE TO THE
CONTRACTOR NO LATER THAN 15 CALENDAR DAYS AFTER RECEIPT.
RESUBMITTALS WILL BE SUBJECT TO THE SAME REVIEW TIME. NO
ADJUSTMENT OF CONTRACT TIME OR PRICE WILL BE ALLOWS DUE
TO GOVERNMENT'S REVIEW OF SUBMITTALS OR SHOP DRAWINGS.
21. ALL PLANTING MATERIAL WILL BE PROVIDED BY THE GOVERNMENT
AND PLANTING WILL BE DONE BY THE GOVERNMENT. PROVIDE
NOTICE TO THE GOVERNMENT 7 DAYS PRIOR TO COMPLETION OF
GRADING AND SITE PREPARATION TO SCHEDULE PLANTING.
CIVIL
1. TEMPORARY STOCKPILES SHALL BE PLACED AS FAR FROM
RESERVOIR AS PRACTICABLE.
2. AT COMPLETION OF PROJECT, STOCKPILE/STORAGE AREAS SHALL
BE REMOVED AND RESTORED TO EXISTING CONDITIONS UNLESS
SPECIFIED OTHERWISE BY THE GOVERNMENT.
3. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE
REHABILITATED TO THE ORIGINAL CONTOURS AND RESTORED TO
THE ORIGINAL CONDITION TO THE GREATEST EXTENT POSSIBLE.
DRAINAGE
1. PROVIDE DEWATERING SUMPS AND PUMPS AS NEEDED IN NEW
RAMP STRUCTURE EXCAVATION. DEWATERING PLANS SHALL BE
APPROVED BY THE GOVERNMENT PRIOR TO CONSTRUCTION.
CONCRETE
1. CONCRETE MIX DESIGN TO BE CLASS 4000A WITH 3/4" AGGREGATE IN
ACCORDANCE WITH PROJECT SPECIFICATIONS, CAST-IN-PLACE
CONCRETE. THE CONCRETE MIX DESIGN PARAMETERS ARE
REFERENCED BELOW.
MINIMUM COMPRESSIVE STRENGTH OF f'c = 4,000 PSI AT 28 DAYS
MINIMUM CEMENT CONTENT OF 560 LB/CY
MAXIMUM WATER CEMENT RATIO OF 0.44
MAXIMUM SLUMP OF 2.5"±1.0
AIR CONTENT OF 6.5% ±1.5
2. THE CONTRACTOR SHALL KEEP VEHICLES OFF OF THE NEW
CONCRETE BOAT RAMP UNTIL THE CONCRETE HAS REACHED THE
SPECIFIED 28-DAY STRENGTH.
3. REINFORCEMENT SHALL BE GRADE 60.
ENVIRONMENTAL RESTRAINTS
1. POLLUTION: COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS
AND REGULATIONS CONTROLLING POLLUTION OF THE
ENVIRONMENT. PROTECT AGAINST THE CONTAMINATION OF SOIL,
WATER, OR AIR BY OIL, FUEL, FLUID SPILLS, CHEMICALS, GARBAGE,
DEBRIS, OR OTHER WASTES AT ALL TIMES. CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING IDAHO DEPARTMENT OF
ENVIRONMENTAL QUALITY (IDEQ) CONSTRUCTION GENERAL PERMIT
(CGP) AND MAINTAINING COMPLIANCE WITH PERMIT REQUIREMENTS
THROUGHOUT CONSTRUCTION, IF NEEDED.
2. EQUIPMENT: EQUIPMENT IS TO BE SERVICED ONLY IN DESIGNATED
AREAS. TAKE MEASURES TO PREVENT SPILLS OF OIL OR OTHER
FLUIDS.
3. DUST CONTROL: HAVE AVAILABLE AT ALL TIMES ADEQUATE
SPRINKLER EQUIPMENT TO ABATE ANY DUST NUISANCE, OR AIR
POLLUTION THAT MAY ARISE DUE TO CONSTRUCTION OPERATIONS.
NO EXTRA PAYMENT WILL BE MADE FOR SPRINKLING OPERATIONS.
FAILURE TO CONTROL DUST MAY RESULT IN TEMPORARY
SHUTDOWN OF THE PROJECT AND NO ADDITIONAL TIME WILL BE
ALLOWED. PROVIDE ALL WATER NECESSARY FOR SPRINKLING
OPERATIONS.
4. HAULING SPILLS: PREVENT SPILLAGE OR SPREADING OF MATERIALS
ALONG HAUL ROADS OR ANY NON-DESIGNATED AREA. CLEAN UP
AND PROPERLY DISPOSE OF ANY SPILLS.
G101
SHEET 2 OF 6
G
EN
ER
A
L N
O
TE
S
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
QUALITY ASSURANCE PLAN
1. INSPECTION REPORTS SHALL BE DELIVERED TO THE
GOVERNMENT BI-WEEKLY OR MORE FREQUENTLY AS REQUIRED
BY THE GOVERNMENT.
2. TESTING INSPECTIONS AND SOURCE QUALITY CONTROL WILL
BE PERFORMED BY A QUALIFIED AND INDEPENDENT TESTING
AND INSPECTING AGENCY ENGAGED BY THE CONTRACTOR.
3. INSPECTION AND TESTING REQUIREMENTS
TABLES ON THIS SHEET APPLY ONLY TO THE BOAT RAMP
STRUCTURE AND ARE NOT APPLICABLE TO THE SHORELINE
STABILIZATION PROJECT COMPONENTS.
VERIFICATION AND INSPECTION CONTINUOUS DURING
TASK LISTED
PERIODICALLY DURING
TASK LISTED
1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN
BEARING CAPACITY.
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL.
3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS.
-- X
4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT AND
COMPACTION OF COMPACTED FILL.
5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND VERIFY THAT SITE HAS
BEEN PREPARED PROPERLY.
-- X
-- X
X --
-- X
REQUIRED INSPECTIONS AND TESTS OF SOILS (ONLY APPLIES TO BOAT RAMP STRUCTURE)
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED
STANDARD
IBC
REFERENCE
1. INSPECTION OF REINFORCING STEEL, INCLUDING
A. VERIFY SPACING AND PLACEMENT
B. VERIFY ANY SPLICING
C. VERIFY MINIMUM CLEARANCES
4. VERIFYING USE OF REQUIRED DESIGN MIX.
-- X ACI 318 --
---- X ACI 318: CH. 19,
26.4.3, 26.4.4
1904.1, 1904.2
5. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS,
PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF
THE CONCRETE.
X --
ASTM C172,
ASTM C31,
ACI 318: 26.4, 26.12
1908.10
6. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION
TECHNIQUES. X -- ACI 318: 26.5 --
7. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES. -- X ACI 318:
26.5.3-26.5.5 --
8. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE
MEMBER BEING FORMED.
-- X
ACI 318:
26.11.1.2(b) --
REQUIRED INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
X
X
X
6. PRIOR TO PLACEMENT OF SUBGRADE SEPARATION GEOTEXTILE, INSPECT FABRIC FOR DEFECTS
AND AFTER INSTALLATION INSPECT OVERLAPPING JOINTS.
-- X
IN THE ABOVE
#1
#3
#4
#5
#2
CONTROL POINT TABLE
POINT #
ELEVATION
2459.64
2469.90
2479.23
2475.97
2466.24
NORTHING
463087.38
463195.47
462849.68
462754.50
462913.39
EASTING
2570543.04
2571093.19
2570965.40
2570596.57
2570102.34
DESCRIPTION
CP S5R FA CTL
CP S5R FA CTL
CP S5R FA CTL
CP S5R FA CTL
CP S5R FA CTL
#1
BLM COVE EXISTING ALIGNMENT
STATION=11+60.00
OFFSET=0.00
NORTHING=463081.52
EASTING=2570588.78
10+00 11+00 11+60S19°46'40"E
BLM COVE EXISTING ALIGNMENT
STATION=10+00.00
OFFSET=0.00
NORTHING=463232.09
EASTING=2570534.64
N
GRAPHIC SCALE
150'100'50'0'
SCALE: 1"=100'
SURVEY CONTROL PLAN
1. THE COORDINATES SHOWN HEREON ARE REFERENCED TO NAD 1983 (2011)(EPOCH 2010) PROJECTED TO THE IDAHO WEST ZONE (1103).
2. TO ACHIEVE GROUND DISTANCES, MULTIPLY BY THE 1/CSF OF 1.000178 CONVERGENCE ANGLE AT POINT 1 = 00°08'15.7"
3. ELEVATIONS ARE NOMINAL NAVD (88) DERIVED FROM REDUNDANT OPUS SOLUTIONS AND COMPUTED USING GEOID 18(CONUS)
4. CONTROL POINTS 2-5 ARE LOCATED OUTSIDE OF SHEETS LIMITS , SEE CONTROL POINT TABLE FOR LOCATIONS.
SURVEY CONTROL NOTES
C100
SHEET 3 OF 6
SU
R
VE
Y
C O
N
TR
O L
D
EM
O
LI
TI
O N
P
LA
N
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
EXISTING APPROXIMATE WATER
LEVEL = 2457.80 AT TIME OF SURVEY
PROJECT AREA
CONSTRUCTION
FENCING
REMOVE EXISTING
30' X 70' BOAT RAMP
REMOVE TREE X 4
N
PROJECT AREA
SCALE: 1"=30'
DEMOLITION PLAN
GRAPHIC SCALE
45'30'15'0'
9+60 10+00 11+00 12+00
BP ST
A=
+0
0.
EL
EV
=2
4.
EP ST
A=
+6
0.
EL
EV
=2
1.
10.00%
BE
G
IN
R
AM
P
ST
A=
+5
7.
EL
EV
=2
4.
EN
D
R
AM
P
ST
A=
+0 2.
EL
EV
=2
9.
TRANISTION TO EXISTING
REGRADE TO A MAXIMUM 2% SLOPE
STA=10+33.36
ELEV=2454.59
M
AT
C H
E
XI
ST
IN
G
ST
A=
+0 4.
EL
EV
=2
9.
4'
2'
BOAT RAMP REFERENCE ALIGNMENT
STATION=10+00.00
NORTHING=463232.09
EASTING=2570534.64
10+00 11+00 11+6030'
TO
E
TO
E
TO
P
END RAMP
STA=11+02.76
S19°46'40"E
BEGIN RAMP
STA=10+57.98
TO
P
TO
E
TOE
TO
E
TO
P
56 24
BOAT RAMP REFERENCE ALIGNMENT
STATION=11+60.00
NORTHING=463081.52
EASTING=2570588.78
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
PROPOSED GRADE EXISTING GRADE
A C200
APPROX. WATER LEVEL MEASURED ON MAY. 20, 2024
2457.80
PROPOSED RIPRAP
LEGEND
RIPRAP
C101
N
6.13%
4:1 HORIZ. TO VERT SCALE
PROFILE
-1.71%
SCALE: 1"=20'
BOAT RAMP PLAN
BC200
PL
A
N A
N D
P R
O
FI
LE
SHEET 4 OF 6
SEE SHEET C300 FOR
BANK STABILIZATION DETAILS
SEE SHEET C300 FOR
BANK STABILIZATION DETAILS
RESTORE GRAVEL
SURFACING FULL DEPTH WITH
CRUSHED AGGREGATE TYPE 1 (3/4" BASE)
TO LIMITS OF BOAT RAMP
NEW CONCRETE BOAT RAMP
GRAPHIC SCALE
20'0' 40'
PROPOSED CONCRETE RAMP
PROPOSED NATIVE MATERIAL
EXISTING 30' X 70' BOAT RAMP
(TO BE REMOVED)
4'
30'
2'
6"
2'
6"
7" CAST-IN-PLACE CONCRETE,
CLASS 4000A
6" CRUSHED AGGREGATE TYPE A ( 3/4" BASE)
CUTOFF WALL
CUTOFF WALL
CL
EXISTING GRADE
2'
SUBGRADE SEPARATION
GEOTEXTILE
FINISH GRADE #4 REBAR @ 12" 0.C.
EACH WAY, 3" MIN. CLR FROM BOTTOM
EXISTING GRADE
FINISH GRADE
AN.T.S.
TYPICAL RAMP SECTION A
BN.T.S.
END WALL SECTION
SUBGRADE SEPARATION
GEOTEXTILE
SUBGRADE SEPARATION
GEOTEXTILE
1. ALL MATERIALS AND
CONSTRUCTION IN
ACCORDANCE WITH PROJECT
SPECIFICATIONS.
2. CONCRETE COMPRESSIVE
STRENGTH TO BE A MINIMUM
4,000 PSI AT 28 DAYS
#4 REBAR @ 12" 0.C.
EACH WAY.
COMPACT SUBGRADE
2'
6"
1RAMP EDGE AND END DETAIL
N.T.S
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
C200
TY
PI
C A
L
SE
C
TI
O N
S A
N D
D
ET
A
IL
S
12"
6"
4 MIN.
2'
CONSTRUCTION JOINT
1/2" STAINLESS STEEL DOWEL BAR X 18" LENGTH
CENTER ON JOINT @ 18" O.C. OR
3/8" X 4 1/2" X 4 1/2" DOWEL PLATES @ 18" O.C.
SECOND POURFIRST POUR
1/8" WIDE X 1-3/4" DEEP (BELOW V-GROOVE)
SAWCUT OR TOOLED JOINT
4SLAB JOINTS
NTS
1. CONTROL OR CONSTRUCTION JOINT IS
REQUIRED AT CENTERLINE OF RAMP.
2. JOINT SPACING IN THE LONGITUDINAL
DIRECTION SHALL NOT EXCEED 7.5 FEET FOR
CONTROL JOINTS AND 15 FEET FOR
CONSTRUCTION JOINTS.
3. CONTRACTOR SHALL SUBMIT LAYOUT PLAN
SHOWING FINAL CONTROL AND
CONSTRUCTION JOINT LOCATIONS. APPROVAL
OF THIS PLAN BY THE GOVERNMENT IS
REQUIRED PRIOR TO ANY CONCRETE
PLACEMENT.
4. CONTRACTOR SHALL SUBMIT A CONCRETE
FINISH PLAN DESCRIBING THE PROPOSED
METHOD TO OBTAIN V-GROOVE SURFACE
PATTERN SHOWN IN DETAILS 2 AND 3 ON THIS
SHEET.
RAMP SURFACE 1" x 1"
V-GROOVE PATTERN
SEE DETAIL 3
CL
V-GROOVE
SURFACE
PATTERN
60°
6 1/4"
3/4"±
7"
2RAMP SURFACE DETAIL
NTS 3RAMP SURFACE PATTERN DETAIL
NTS
CONTROL JOINT
1" 90°
1"
CONTROL JOINT
2'
RIPRAP D50 = 12"
BACKFILL VOIDS IN ROCK
WITH NATIVE SOIL FLUSH
WITH BOAT RAMP SURFACE
ABOVE WATER LINE.
RIPRAP D50 = 12"
BACKFILL VOIDS IN ROCK
WITH NATIVE SOIL FLUSH
WITH BOAT RAMP SURFACE
ABOVE WATER LINE.
4 MIN.
RIPRAP D50 = 12"
BACKFILL VOIDS IN ROCK
WITH NATIVE SOIL FLUSH
WITH BOAT RAMP SURFACE
ABOVE WATER LINE.
3" M
IN
. C
LR
0% CROSS-SLOPE
2"
M
IN
. C
LR
SHEET 5 OF 6
4 MIN.
SLAB JOINT NOTES
RAMP SECTION NOTES
TOE
TOE
TOE
TOE TOE
TOE
TOP
TOP
TOP
TOP
TOP
TOP
TOE
TOE
TOE
TOP
END RAMP
STA=11+02.76
BEGIN RAMP
STA=10+57.98
+5
+0
30'
NEW CONCRETE BOAT RAMP
50'
SHORELINE STABILIZATION
50'
SHORELINE STABILIZATION
7 8
24 13
WEST BANK STABILIZATION POINT TABLE
POINT #
ELEVATION
2459.04
2458.85
2458.80
2458.80
2458.82
2458.00
2457.00
2457.00
2457.00
2457.00
2457.00
2458.00
NORTHING
463129.64
463130.46
463128.71
463117.34
463114.41
463118.91
463121.69
463124.63
463142.12
463145.99
463148.84
463139.43
EASTING
2570553.41
2570548.83
2570541.19
2570525.53
2570521.48
2570518.21
2570516.19
2570520.24
2570544.35
2570546.41
2570546.51
2570549.89
EAST BANK STABILIZATION POINT TABLE
POINT #
ELEVATION
2457.00
2457.04
2458.00
2458.69
2458.60
2458.60
2459.27
2459.04
2458.54
2457.00
2457.00
2457.00
NORTHING
463152.06
463152.87
463147.14
463145.05
463144.01
463137.01
463135.02
463140.46
463141.14
463155.65
463146.41
463144.83
EASTING
2570627.22
2570631.03
2570632.25
2570632.69
2570627.80
2570594.83
2570585.48
2570583.53
2570585.41
2570580.19
2570588.39
2570593.17
WILLOW PLANTINGS TO BE
COMPLETED BY GOVERNMENT
CN.T.S.
BANK STABILIZATION SECTION
N
C C3
RIPRAP
NATIVE FILL MATERIAL
RETAIN AND PROTECT
RETAIN AND PROTECT
REMOVE 1
EXISTING TREE REMOVE 3
EXISTING TREES
REMOVE AND RESET RETAIN AND PROTECT
RETAIN AND PROTECT
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F
LA
N D
M
AN
AG
EM
EN
T
B A
N K
S
TA
B
IL
IZ
A
TI
O
N D
ET
A
IL
S
CN.T.S.
BANK STABILIZATION SECTION
SCALE: 1"=20'
BANK STABILIZATION PLAN
NATIVE PLANTINGS BY GOVERNMENT.
RIPRAP D50 =12"
FILL IN VOIDS IN RIPRAP BELOW WATER LINE WITH
3/4" AGGREGATE TYPE A. CONSTRUCT IN LIFTS TO
ENSURE VOIDS ARE FILLED AND INTERLOCK
BETWEEN LOOSE RIPRAP. TOP DRESS WITH
SUITABLE BORROW MATERIALS ABOVE WATERLINE.
EXISTING GRADE
PROPOSED GRADE
SUBGRADE SEPARATION
GEOTEXTILE
WATER
SURFACE
ELEVATION
5H:1V
RESERVOIR BOTTOM
ELEVATION
VA
R
IE
S
LIVE WILLOW STAKES PLANTED BY GOVERNMENT.
BACKFILL VOIDS IN ROCK WITH SUITABLE BORROW
MATERIAL ABOVE WATERLINE.
SUITABLE BORROW MATERIAL
PER PROJECT SPECIFICATIONS
C300
SHEET 6 OF 6
2' M
IN.
CLEAR AND GRUB WITHIN LIMITS OF
SHORELINE STABILIZATION
" M
IN
FLAT TOP
MINIMUM OF 2 BUDS
EXPOSED ABOVE GROUND
RIPRAP
TAMP SOIL AROUND CUTTING
OR LIVE STAKE
SOIL
ANGLE CUT
NTS
WILLOW PLANTING DETAIL
LIVE STAKE
GEOTEXTILE
GRAPHIC SCALE
40'20'0'
DEWATERING AREA
EXISTING 30' X 70' RAMP
(TO BE REMOVED)
File details come from the government source that posted it. Updated .