Technical Evaluation Critera_Exhibit Fabrication and Installation_7_27_20.docx

DOCX document 21 KB Posted

Attached to
RPFO- EL MALPAIS RANGER STATION EXHIBIT
Solicitation number
140L2220Q0009
Issued by

View the file

Other files

File Type Posted
Payment Schedule_0003.docx DOCX document
Sol_140L2220Q0009_Amd_0003.pdf PDF
Sol_140L2220Q0009_Amd_0002.pdf PDF
FabInstContractQuestions_2020August_And_0001.docx DOCX document
Technical Evaluation Critera_Exhibit Fabrication and Installation_7_27_20 (Merino Jennifer L)_And_0001.docx DOCX document
Sol_140L2220Q0009_Amd_0001.pdf PDF
Statement of Work_Contract for Fabrication and Installation of Ranger Station Exhibits (1)_And_0001.docx DOCX document
Appendix B - Exhibit Design Plans_Part5of9.pdf PDF
Sol_140L2220Q0009.pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part1of9(1).pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part8of9.pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part6of9.pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part3of9(1).pdf PDF
Appendix B - Exhibit Design Plans_Part1of9.pdf PDF
SITE VISIT_updated.docx DOCX document
Directions to El Malpais Ranger Station.docx DOCX document
Statement of Work_Contract for Fabrication and Installation of Ranger Station Exhibits.docx DOCX document
FINAL 100 Design - Exhibit Design Plans_Part4of9(1).pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part5of9(1).pdf PDF
Appendix B - Exhibit Design Plans_Part7of9.pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part7of9.pdf PDF
Appendix A_Ranger Station_Floor Plan_Blueprint.pdf PDF
Appendix B - Exhibit Design Plans_Part8of9.pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part9of9.pdf PDF
FINAL 100 Design - Exhibit Design Plans_Part2of9(1).pdf PDF
Appendix B - Exhibit Design Plans_Part2of9.pdf PDF
Appendix B - Exhibit Design Plans_Part6of9.pdf PDF
Appendix B - Exhibit Design Plans_Part3of9.pdf PDF
Appendix B - Exhibit Design Plans_Part9of9.pdf PDF
Appendix B - Exhibit Design Plans_Part4of9.pdf PDF
Appendix DTextGraphicsand Artifacts.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Evaluation Criteria El Malpais Ranger Station Exhibit Fabrication and Installation

The Government is seeking offers that provide the best combination of quality and price to select the greatest overall benefit or "best value" offer. Therefore, award may be made to other than the lowest price offered. The evaluation criteria are listed below in descending order of importance. Technical factors other than cost or price, when combined, are considered significantly more important than cost or price.

A technical Evaluation Panel (panel) consisting of no less than three members will conduct the initial evaluation. The panel will include the government project manager who is technically qualified to evaluate all proposals. Upon completion of the evaluation period, the panel will review each proposal and make their final award recommendation to the Contracting Officer.

Provide your bid in two separate volumes:

Volume 1- Pricing.

Volume 2 - Non-pricing, which includes information that addresses the evaluation factors.

Evaluation Factors

Understanding the Scope of Work and Technical Approach

Each bid should include (1) a proposal outlining how they might execute the exhibit design plans including examples of materials to be used for fabrication and installation; and (2) a statement demonstrating experience and success in completing high quality exhibit fabrication and installation based on BLM provided design, including all the elements in the statement of work. The proposed technical approach for fulfilling the statement of work must demonstrate familiarity and high-level proficiency in understanding the exhibit fabrication and installation.

Qualifications of Proposed Personnel

The proposal should describe relevant professional experience in the following areas: (a) experience completing high quality exhibit fabrication based on specific design; (b) experience completing high quality installation of exhibits based on specific design; and (c) biographies including resumes and/or vitae of key staff and their role in your proposed work area. Key staff includes but is not limited to:

· Project Manager

· Fabrication Manager

· Graphic Panel Printer

· Installation Manager

Contractor's Past Performance

Preference will be given to those who have executed exhibit fabrication and installation based on specific design plans with a scope similar in scope to this solicitation. The applicant needs to showcase experience fabricating exhibits based on design plans and on installing them. Provide a list of projects completed in the past three (3) years in which you provided services related to fabrication and installation for projects similar in nature to this solicitation. Each project description must contain the following information:

· The name of the project

· The project start and end dates

· A brief description of project (no more than one (1) page)

· The owner of project

· The owner’s contact information

· The total dollar value of the project