A05_PWS_REV_1.pdf

PDF 521 KB Posted

Attached to
CRVFO FY26-FY30 VAULT TOILET CONTRACT (SILT)
Solicitation number
140L1725Q0049
Issued by

About this file

This Performance Work Statement (PWS) details vault toilet pumping services for the Bureau of Land Management's Colorado River Valley Field Office (CRVFO), covering recreational areas in Colorado. The contract will run from October 1, 2025 to September 30, 2026, with options for four additional 12-month years. The contractor is required to provide all equipment, personnel, and services necessary to pump and clean vault toilets at 19 different locations, including campgrounds, boat ramps, and trailheads across the Upper Colorado River Valley region.

Key service requirements include maintaining vault toilets at no more than 50% capacity, responding to emergency service requests within 24 hours, transporting and disposing of waste at designated treatment plants, and providing detailed pumping reports after each service. The contractor must pressure wash vaults, add 50 gallons of liquid to reduce odors, and submit a final assessment report. The contract is a firm-fixed-price type, with the government reserving the right to require up to 23,000 gallons of pumping services within one calendar year, with additional quantities billable at unit price. Locations are spread across areas near Rifle, Glenwood Springs, Carbondale, Gypsum, Wolcott, and other nearby towns.

View the file

Other files

File Type Posted
B03_SCLS_2015-5439_REV_26.pdf PDF
Sol_140L1725Q0049.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Pumping of Vault Toilet Restrooms for the Bureau of Land

Management (BLM) Colorado River Valley Field Office (CRVFO)

Part 1 General Information

1. GENERAL: This is a non-personnel services contract to provide vault pumping and pre-designated sites. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform vault pumping as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The Upper Colorado River Valley Field Office supports thousands of citizens a year in a range of recreational activities including: rafting, boating, camping, hiking, and picnic areas. These areas are heavily utilized from April through November necessitating refuse and waste collection and removal to prevent environmental and health impacts to the environment and its patrons.

1.3 Objectives: The objective for this service is to provide regular pumping services for vault toilets, a sanitary environment and prevent overflow or contamination, and comply with local health and environmental regulations.

1.4 Scope: The contract supports periodic cleaning and provisioning of required resources to support patronage of all vault sites within the recreational area. The contractor shall provide all materials and labor to access, remove, transport, and dispose of waste in accordance with local regulation. The contractor shall provide continuity of serviceability to all vault toilets from a standpoint of capacity as outlined in the specified tasks.

1.5 Period of Performance: The period of performance for this contract shall begin on 1 October 2025 and end on 30 September 2026. The governments unilateral right to exercise options for the following four calendar years. The period of performance shall be for one (1) Base Year of 12 months and four

(4) 12-month option years. The Period of Performance is listed on the purchase order schedule.

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which the contractor assures that work complies with the requirement of the contract.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Planas defined at FAR 37.604. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: The contractor is not required to perform on the federal holidays below.

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth National Independence Day

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 9:00am to 4:00pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm-fixed-price contracts, the contractor will not be reimbursed when the government facility is closed. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed per the Matrix at Exhibit A. Each single vault has a capacity of 1000 gallons of waste.

1.6.6 Type of Contract: The government will award a Firm—Fixed Price Contract

1.6.7 Security Requirements:

1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.7.2 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.3 Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.8 Special Qualifications: RESERVED

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with

Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

These meetings shall be at no additional cost to the government.

1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

maintain written and oral communications with the Contractor concerning technical aspects of the contract:

issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel: RESERVED

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.13 Contractor Travel: RESERVED

1.6.14 Other Direct Costs: RESERVED

1.6.15 Data Rights: RESERVED

1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.17 PHASE IN /PHASE OUT PERIOD: RESERVED

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative BLM Bureau of Land Management CFR Code of Federal Regulations CO Contracting Officer CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf CRS Colorado Revised Statute DIAR Department of the Interior Acquisition Regulation DOI Department of the Interior FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KFO Kremmling Field Office OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SRMA Special Recreation Management Area TE Technical Exhibit UCRD Upper Colorado River District

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide access to all facilities and lands in coordination with the COR.

The government will notify the contractor of the need for pumping no later than one week prior to required pumpings.

3.2 Facilities: RESERVED

3.3 Utilities: RESERVED

3.4 Equipment: RESERVED

3.5 Materials: RESERVED

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. Services: The Contractor shall furnish all toilet pumping equipment, tank truck, tools, and other equipment and supplies necessary to perform the work.

4.2 Facilities: RESERVED

4.3 Utilities: The addition of 50 gallons of water may be necessary to dilute solidified waste in order to thoroughly pump the vault.

4.4 Equipment: RESERVED

4.5 Materials: RESERVED

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The contractor shall provide services for the Upper Colorado River Special Recreation Management Area supporting the removal of waste from Vault Toilets identified under para 1.6.5.

5.1.1. Scheduling. The contractor shall coordinate scheduled cleaning access with the COR no later than 24 hours prior to attempting site access. The contractor shall respond to COR notifications of level of service requirement and provide service within 10 business days. While the COR may assist the contractor in monitoring levels, the contractor is responsible for maintaining the level of service for these sites.

5.1.2. Training. The contractor is responsible for ensuring all personnel are trained and appropriately certified for the positions related to this work inclusive of all of the terms and conditions of this purchase order.

5.1.3. Level of Service. The contractor is responsible for always maintaining the vaults utilization to not greater than 50% or capacity during the period of performance. The government reserves the right to service within 24 hours of notification from the COR that a vault exceeds 50% capacity.

5.1.4. Solid Waste (Rubbish). The contract shall collect up to 5lbs of solid waste (other than toilet paper) without charge. Any solid waste in excess of 5lbs shall incur a flat rate charge for that vaults service.

5.2. Waste Removal.

5.2.1 The contractor shall provide all equipment, power, and materials to independently suction or otherwise remove vault toilets per commercial standard. The government reserves the right to no fewer than twenty-three thousand gallons (23,000) within one calendar year. Additional quantities shall be billable to the unit price established within the schedule.

5.2.2. Following removal of waste and cleaning, the contractor shall provide no less than 50 gallons of liquid (water or other industry standard) at the bottom of each vault to reduce odor and vector borne risks.

5.2.3. The contractor is responsible for the proper removal and re-installation of manhole covers to prevent damage to the facility and mitigate risk to pedestrians.

5.2.4. Following pumping, the contractor will provide a detailed report to accompany invoicing after each service including date of service, volume of waste removed, and any emergency maintenance or repair recommendations.

5.3. Transportation and Disposal of Waste. The contractor will remove all waste from the Location of Performance and deposit it at a state designated wastewater treatment plant. Facilities lists are available from the Colorado Department of Public Health and Environment. The contractor is solely responsible for compliance with all Federal, State, and Local Laws related to waste transportation and cleanup of any unauthorized spillage from the contractor’s vehicle.

5.4. Vault Inspection and Maintenance.

5.4.1. Standard Cleaning. The contractor shall pressure wash or use other standard commercial processes to treat and clean vault facilities. The contractor shall clear any blockages presented within the vaults structure to support proper functionality. The contractor shall, free of cost, provide for the cleanup of any waste products outside of containment lost during the cleaning and disposal process.

5.4.2. Final Assessment Report. The contractor will provide the COR with a Final Assessment Report with their final invoice. This report will provide a technical inspection of each vault for serviceability.

5.5 Insurance. The contractor shall maintain and provide proof of all required insurance to the government upon request. This may include, but is not limited to: Vehicular Insurance, Business Liability Insurance, and other labor related insurance related by the State of Colorado and this contract.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

Public Law 92-500

40 CFR 63.1256

CRS 25-8-205

CRS 25-13-106

CRS 32-7-141

5 CCR 1002-22

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1 – Performance Requirements Summary

7.2. Attachment 2 – Deliverables Schedule

7.3 Exhibit A – Work Matrix

Attachment 1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS # 1.

1.6.7 Physical Security

The Contractor provided key control ensuring no unauthorized access to facilities for which they are provided with temporary access to keys. The contractor lost no keys in the performance of the contract.

ZERO Deviation Direct Observation

PRS # 2

5.1.3. Level of Service

The contractor empties and cleans all vaults to maintain a capacity of 50% or less at all times. The contractor responds to request for emergency service within 24 hours of notification from the COR.

95% Periodic Surveillance;

Validated Customer Complaint

PRS # 3

5.3. Transportation and Disposal of

Waste

The contractor transports and disposes of waste product under the terms and conditions of the contract. The contractor experience no unauthorized spillage of wastewater outside of authorized areas.

ZERO Deviation Validated Customer Complaint

PRS # 4

5.4.1. Standard Cleaning

Following wastewater removal, the contractor pressure washes the vault to facilitate inspections and ensure servicablility

95% Periodic Surveillance;

Validated Customer Complaint

Attachment 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Pumping Report Upon Completion of wastewater disposal

1 – provided during invoice submission

Adobe or MS Office

IPP.gov

Final Assessment Report At the time of final invoice

1 – provided during invoice submission

Adobe or MS Office

IPP.gov

Proof of Insurance Upon request from the COR or Contracting Officer

1 Adobe or MS Office

COR or Contracting Officer

EXHIBIT A

Vault Facility Name

No. of Vault s

Location

Distance from nearest town in miles

Estimated per Year

0-

1 2

Hubbard Mesa 2 39°34'31.3"N

107°48'42.9"W

X

Grand Hogback / Rifle Arch Trailhead

CR13

39°36'46.9"N; 107°48'34.5"W

5 miles north of Rifle X

South Canyon Boat Launch

I70

39°33'54.6"N; 107°24'58.1"W

10 miles west of Glenwood Springs X

Sutey Ranch Trailhead 1

CR112

39°27'08.5"N; 107°11'52.9"W

7 miles north of Carbondale X

Lower Prince Creek Campground

Prince Creek Road 39°27'08.5"N; 107°11'52.9"W

6 miles south of Carbondale

X

Upper Prince Creek Campground

1 Prince Creek Road 39°19'57.3"N; 107°09'05.7"W

7 miles south of Carbondale

Dotsero Landing Boat Ramp

2 1-70 Frontage Rd 39°39'02.0"N; 107°03'40.2"W 6 miles west of Gypsum

Deep Creek

1 Coffee Pot Rd 39°40'41.0"N; 107°05'47.6"W

11 Miles NW of Gypsum X

Lyons Gulch Campground

1 Colorado River Road 39°41'54.7"N; 107°04'21.2"W 10 miles NW of Gypsum

Cottonwood Island Boat Ramp

1 Colorado River Road 39°42'45.0"N; 107°02'40.4"W 13 miles NW of Gypsum

Pinball Campground

Colorado River Road 39°50'30.6"N; 106°56'28.8"W 26 miles north of Gypsum

X

Catamount Campground

Colorado River Road 39°53'25.9"N; 106°49'56.3"W 29 miles north of Wolcott

X

Two Bridges Boat Ramp

Colorado River Road 39°53'28.2"N; 106°42'11.3"W 18 miles north of Wolcott

X

Two Bridges Admin Area – under contruction 1

Colorado River Road 39°53'28.2"N; 106°42'11.3"W 18 miles north of Wolcott

Wolcott Campground

Hwy 6 39°42'46.1"N; 106°41'50.9"W 1 mile west of Wolcott

Bocco Mountain - possible addition, doesn’t exist yet

1 39°43'14.7"N; 106°42'08.6"W 3 miles northwest of Wolcott

Gypsum Campground

I-70 Frontage Road 39°39'18.5"N; 106°58'32.2"W 1 mile west of Gypsum

File details come from the government source that posted it. Updated .