This document is an Amendment to Solicitation 140L1224Q0041 for the GREENWOOD CREEK PARKING LOT REHAB project issued by the Department of the Interior Bureau of Land Management California Region.
The amendment makes changes to the original solicitation, including extending the bid due date and revising the specifications. The revised bid due date is now January 31, 2023. The amendment also clarifies product and service requirements, including the types of work and materials needed for the parking lot rehabilitation. No other significant changes to the original solicitation terms or requirements are noted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L1224Q0041_Amd_0001.pdf | ||
| Sol_140L1224Q0041.pdf | ||
| B08_RFQ_Solicitation_No__140L1224Q0041.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
�����������������������#���"�$��%&'()*+�,%�-,)*�&./0,1(+23+4+05�5,��+�*+.+'6+2�&5�57+�8(&.+�2+9'30&5+2�%,*�57+�*+.+'85�,%�,%%+*9�8*',*�5,�57+�7,)*�&02�2&5+�98+.'%'+2�4&-�*+9)(5�'0�*+:+.5',0�,%�-,)*�,%%+*$��'�����;�"�#����������������������#�����"�����
=>?>=@>ABCDE�=>�FGH
G
H���=EDD>IB�J>KL�?MNDB�JO�HP�Q A�=>O?D>DB�ER=�QM?�?S=�Q@�T=>F��U�GVP�V
WXY�Z[\]�\Ẑ _�̀abc�deeb\̂]�Z̀ �_̀ f\g\hdZ\̀a�̀g�h̀ aZidhZ]j̀if̂ i]Y��\Z�_̀ f\g\̂]�Z[̂ �h̀ aZidhZj̀if̂ i�à Y�d]�f̂ ]hi\k̂ f�\a�\Ẑ _�WlYmn$�&..,)05'03�&02�&88*,8*'&5',0�2&5&�opq�rstuvrswx ���������������$�����������<�'�����y�����mz<�����"��#"���!,���"���#���� ��� ����!5������;���#���"����� � ����������������������������"������'����m|$��5�����#"������������� ��������,���"�WWY�Z[\]�\Ẑ _�̀abc�deeb\̂]�Z̀ �d_̂ af_̂ aZ]�̀g�]̀ b\h\ZdZ\̀a]%&.'('5-�.,2+�.,2+� m}�$�2&5+2�o~���p������xm}&$�4,2'%'.&5',0�,%�.,05*&.5�,*2+*�0,$��$�2&5+2�o~���p������x�&$�&4+024+05�,%�9,('.'5&5',0�0,$
.,2+� y$�0&4+�&02�&22*+99�,%�.,05*&.5,*�o�������rss�����u�����~���s���w��p����wsx
�$�&24'0'95+*+2��-�opq����sr������p�s���x.,2+��$�'99)+2��- 8&3+���,%��8&3+9|$�*+�)'9'5',0�8)*.7&9+�*+�$�0,$�$�+%%+.5'6+�2&5+n$�&4+024+05�4,2'%'.&5',0��0,$� z$�8*,:+.5�0,$�opq�����v����sxm$��.,05*&.5�'2�.,2+d_̂ af_̂ aZ�̀g�]̀ b\h\ZdZ\̀aj_̀ f\g\hdZ\̀a�̀g�h̀ aZidhZ
�GVP�V
.7+./�,0+ &$�57'9�.7&03+�,*2+*�'9�'99)+2�8)*9)&05�5,{�o~�s�vq���u���rv��x��57+�.7&03+9�9+5�%,*57�'0�'5+4�m|�&*+�4&2+�'0�57+�.,05*&.5�$�57+�&�,6+�0)4�+*+2�.,05*&.5�,*2+*�'9�4,2'%'+2�5,�*+%(+.5�57+�&24'0'95*&5'6+�.7&03+9�o�u�����������s��v�����v����qqv�s��.$�57'9�9)88(+4+05&(�&3*++4+05�'9�+05+*+2�'05,�8)*9)&05�5,�&)57,*'5-�,%{2$�,57+*�o~�s�vq�����s��q���wvqv���v�����w��u���rv��x����r��rv��v���w�����s���x��9+5�%,*57�'0�'5+4�m|<�8)*9)&05�5,�57+�&)57,*'5-�,%�%&*�|�$m}����$ Ŷ�\_è iZdaZ� .���"� �$�,*2+*�0,$�'0�'5+4�m}&$ m|$�2+9.*'85',0�,%�&4+024+05�4,2'%'.&5',0�o r���v¡sw����¢�£��s��v����s�wv�����v���uwv������v�v���v��¤����r�����u�¥s�������sr�¦�srs�qs��v��s��D§̈�?©ª«¬«®«©̄�¬«̈°�«̄�±ª©¬²�F>�®±©³̈L�Í ¨̈ µ̄©©°�=́ ¨̈²�¶®́²«̄·� ©�@̈§®±�¶́ ©̧ ¬̈�«¹§̈ ´̈±º�®»̈ °̄̈°¼¶½́¾©¹̈¿�D§̈�¾½́¾©¹̈�©À�§«¹�®»̈ °̄»̈ ̄�«¹�©¿��U�N̄¬©́¾©́®̈�§̈�®®¬§̈°��½̈¹«©̄¹�Á>̄¹µ̈ ¹́�µ«§�?«̈�S«¹«�?«·̄�«̄�?§̈ ̈L� U�@̈»©³̈�®̄°�́ ¾̈ª®¬̈�?EJ�®̄°�N̄¬©́¾©́®̈�§̈®®¬§̈°�½¾°®̈°�?EJ¼D§̈�°®̈�®̄°�«»̈�À©́ �́ ¬̈̈«¾�©À�©ÀÀ̈ ¹́�«¹�́ »̈®«̄¹�MC=Â>CIBüD§̈�©ÀÀ̈ ©́́�»½¹�®¬²̄©µª̈°·̈�§«¹�®»̈ °̄»̈ ̄�±º�¹½±»««̄·�®�¹«·̄ °̈�¬©¾º�©À�§«¹�?RP��®ª©̄·µ«§�§̈ «́�¾́©¾©¹®ª¼¶̈ «́©°�©À�¶̈ À́©́»®̄ ¬̈¿��HV�GV
��©��FV�ÄV
� m�&$�0&4+��&02�5'5(+�,%�.,05*&.5'03�,%%'.+*�o���s��r��rv��xmz&$�0&4+�&02�5'5(+�,%�9'30+*�o���s��r��rv��x mz.$�2&5+�9'30+2 m��$�)0'5+2�95&5+9�,%�&4+*'.&�mz�$�.,05*&.5,*�,%%+*,* m�.$�2&5+�9'30+2o~v����urs��q��sr�����u���rv¡sw�����v��x o~v����urs��q�����r���v��� qqv�srxÅ©§̄�=®±́®ª 95&02&*2�%,*4��}��*+6$�mm�n}m��8"�� "��������39&�%&*��|y�.%*��z�$n|�8"�;��#����������#�#��� � ������'�����&��"�m}&<������"�����"��
Amendment No. 0001
Prebid site visit questions and summary
RFP# 40654094 – Greenwood Creek Parking Lot Rehab
Date/Time: 6/6/2024 at 10:00 am
Summary:
BLM employee Armando Porras was present at the Greenwood Creek Parking Lot until 10:28 am. Four contractors attended the pre-bid site visit.
• The group reviewed contract requirements:
o Task 1; Project schedule, logistics and proposed products.
o Task 2; Site preparations o Task 3; Seal cracks o Task 4; Seal coat o Task 5; Pavement markings o Site clean up and pollution prevention
The pre-bid visit ended at 10:28 am.
Questions:
Q: Regarding the coat seal on asphalt dike, there are sections that deteriorated to the point where sealing would not be beneficial, are you sure you want to seal coat those sections?
A: Sealing asphalt curb has been removed from required tasks on the Scope of Work, Task 4. Acquiring and installing reinforced concrete wheel stops has been added to Revised Scope of Work, please reference
Task 6.
Q: Can we black out lettering [“KEEP CLEAR” at shuttle loading zone] our stencil is slightly different than existing?
A: Yes, as long as no underlying pavement markings are visible or distinguishable. Scope of work has been updated to reflect this, please reference Task 5.
Q: Can apply pavement markings the same day we seal coat?
A: Yes, allow for first coat to thoroughly dry before applying second coat. Allow second coat to thoroughly dry before continuing to pavement markings. Contractor shall plan work on relatively dry days. Temperature forecast for the Coloma CA. must exceed 65 degrees Fahrenheit, the day before, the days of, and the day after work. Scope of work has been updated to reflect this, please reference Task 4.
Q: Would you like us to paint short red curb section?
A: Yes. Scope of work has been updated to reflect this, please reference Scope of Work Task 5.
Q: Does scope of work include replacement of ADA stall sings?
A: No
Q: Landscaping requirements?
A: Remove debris and vegetation from cracks and up to and along edge of pavement/asphalt. Contractor shall follow Caltrans Standard Specifications, 37-5.03B Surface Preparations.
Q: **CTPE Specifications**: The SOW specifies the use of CTPE sealer that meets or exceeds RP 355e and ASTM D5727 standards. However, during discussions with potential subcontractors, I've been informed that the use of CTPE may no longer be allowed in California. One subcontractor suggested using emulsified asphalt instead, which is said to be compatible. Could you please clarify whether CTPE is still acceptable for this project or if an alternative like emulsified asphalt would be permissible?
A: Yes, proposed emulsified asphalt must meet CalTrans Standard Specifications 37-5.01D(2)(b) Asphaltic
Emulsions and 37-5.02B Mix Design. CTPE sealer requirement has been removed from revised Scope of
Work, refence Task 4.
Q: **Paint Specifications**: The SOW mentions restriping the existing pavement markings with thermoplastic traffic paint. However, some potential subcontractors have pointed out that the pictures provided seem to depict a painted parking lot. Given this observation, they have doubts about thermoplastic paint's necessity and practicality. Could you provide further insight into the reasoning behind specifying thermoplastic paint and whether alternatives such as traditional paint would be acceptable?
A: Thermoplastic paint has been removed from requirements. Proposed paint shall meet Caltrans
Standards Specifications for Section 84: Markings; 84-2.02C Paint & 84-2.03C Application of Stripes and
Markings. Please see updated Scope of Work, Task 5.
SECTION C, UNIFORM CONTRACT FORMAT (UCF)
DESCRIPTION / SPECIFICATION / STATEMENT OF WORK (SOW)
SOW Page 1
Amendment No. 0001
PROJECT TITLE:
Greenwood Creek Parking Lot Rehab
Table of Contents SOW 1.0 Background on the Government’s Requirement
SOW 2.0 General Scope of Work
SOW 3.0 Overall Objective(s)
SOW 4.0 Specific Tasks
SOW 5.0 Delivery / Performance Schedule
SOW 6.0 Government-Furnished Property, Materials, Services
SOW 7.0 Security and Administrative Matters
SOW 8.0 Technical Exhibits and Definitions
SOW Page 2
SOW 1.0 Background on the Government’s Requirement
The Greenwood Creek Recreation Site, managed by the Bureau of Land Management
(BLM), provides access to the South Fork American River, trails, and other recreational and interpretive opportunities. The asphalt parking lot for the recreation site was constructed in 2013 and requires surface treatment to increase its useful life. The parking lot includes a vault toilet and has 42 parking bays, 2 ADA parking bays and shuttle drop off zone.
SOW 2.0 General Scope of Work
The contractor shall furnish all labor, equipment, supplies, materials, and obtain all requisite permits to execute the objectives of this contract at the Greenwood Creek
Recreation Site Parking Lot.
Effort shall include:
• Preparation of the existing asphalt surface.
• Sealing of existing asphalt cracks (1,000 linear feet approximately).
• Sealcoat entire parking lot and entrance driveway (2,300 square yards approximately).
• Pavement markings matching existing, 42 parking bays, 2 ADA parking bays, shuttle loading zone, fire lane and restrictive striping and messaging.
• Acquire 19, 6-foot, precast, concrete wheel stops and install according to
Task 6.
It is recommended that the contractor, but not required, visits site and/or verifies provided qualities.
Place of Performance:
All work associated with this contract is to be conducted at Greenwood Creek Parking
Lot, located at Greenwood Creek Recreation Site; CA-49, Lotus, CA 95664. The recreation site is located in El Dorado County, approximately 4 miles Northeast of
Coloma, CA at (38.826099, -120.948298). The parking lot driveway is accessed from
HWY-49.
All work and staging for project shall be done within entrance gate. Gate to remain close during the duration of the project and shall only be opened when work requires it.
Contractor shall have limited use of premises for construction operations, therefore contractor shall:
• Schedule operations so that Work is conducted during regular office hours which are 7:30 AM to 4:30 PM, Monday through Friday.
SOW Page 3
• Parking lot will be closed to the public during construction, contractor shall coordinate with COR on best dates for closure.
• Gate to the site will allow for, only, government and contractor access.
Government will close parking lot for public access during project execution.
• Limit use of premises to work areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
o Provide minimum 72 hours advance notice to Contracting Officer of activities that will impact normal Government operations. Secure
Contracting Officer's written approval of activities that will impact normal
Government operations to avoid delays in overall construction and permit proper installation or work.
• Schedule and sequence operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Schedule
Work in such manner as to avoid delays in overall construction and permit proper installation of work.
Period of Performance:
The period of performance shall be from August 5, 2024 through September 16, 2024.
SOW 3.0 Overall Objective(s)
The objective of this work is to restore Greenwood Creek Parking Lot and driveway, to prevent further degradation of the asphalt surface
SOW 4.0 Specific Tasks
The following is intended to convey the general work tasks associated with the execution of this contract.
All performed work must be done in a manner that prevents damage to existing asphalt curb; contractor is responsible for any newly created damages to government furnished property.
All State, County, City Permits and Licenses shall be the contractor’s responsibility to obtain and provide copies to the Contracting Officer Representative (COR) and CO.
Task 1: The contractor shall submit to and receive approval from the COR the following submittals prior to receiving a Notice to Proceed (NTP):
• Proposed pre-construction date and time.
• Certificates of insurance.
• Relevant city, county, and state business licenses.
• Proposed Project Schedule
SOW Page 4
• List of proposed products, specifications, and associated certifications for:
1. Sealer mix design specifications
2. Crack sealer product specifications
3. Paint specifications
4. Concrete wheel stop specifications
Task 2: Upon receiving a NTP the contractor shall clean and prepare Site.
• Remove debris and vegetation from cracks and up to and along edge of pavement/asphalt.
• Contractor shall follow Caltrans Standard Specifications, 37-5.03B Surface
Preparations.
Task 3: After preparing site, contractor shall seal cracks.
• Seal cracks with a product that is suitable for crack size and also compatible with sealcoating product.
• Prep any oil, gas or diesel spots with a suitable primer compatible with sealcoating product.
• Contractor shall follow Caltrans Standard Specifications, 37-6.02B Crack
Treatment Material and 37-6.03 Construction.
• Cold-applied crack treatment must have a minimum shelf life of 3 months from the date of manufacture.
Task 4: Apply 2 coats of sealer to entirety of area designated in exhibit (approximately
2300 square yards).
• Two coats shall be applied at rate and cure time recommended by sealer product specifications.
• Does not include existing Asphalt dike/curb.
• Allow for first coat to thoroughly dry before applying second coat. Allow second coat to thoroughly dry before continuing to pavement markings.
• Emulsified asphalt must meet CalTrans Standard Specifications 37-5.01D(2)(b)
Asphaltic Emulsion:
SOW Page 5
• Emulsified asphalt mix design must meet CalTrans Standard Specifications, 37-
5.02B Mix Design shown in following table:
• A parking area seal must contain a minimum of 2 percent polymer by volume of undiluted asphaltic emulsion.
• Contactor shall protect curb and prevent damage to asphalt curb/dike, located on the south side of the parking lot.
• Contractor shall plan work on relatively dry days. Temperature forecast for the
Coloma CA. must exceed 65 degrees Fahrenheit, the day before, the days of, and the day after work. Contractor must schedule parking lot closure with COR, 2 weeks prior.
Task 5: Parking lot and driveway markings.
• Restripe existing pavement markings as they exist.
o 40 parking bays, 2 ADA parking bays o Shuttle drop off zone o Double Solid Yellow line through the center of entrance driveway.
o 50-foot, red, fire lane on asphalt curb
• The paint used for traffic stripes and pavement markings must comply with
CalTrans Standard Specifications for the paint type and color shown in following table: 84-2.02C Paint
• The color of painted traffic stripes and pavement markings must comply with
ASTM D6628.
• Construction shall conform with CalTrans Standard Specifications 84-2.03C
Application of Stripes and Markings.
• No underlying pavement markings shall be visible or distinguishable.
• Follow ADA Standards for Accessible Design (28 CFR Part 36)
Task 6: Acquire and Install, Reinforced Concrete Wheel Stops.
• Install, 19, precast, reinforced, concrete wheel stops on the southern side of the parking lot; parallel to asphalt curb/dike, with a 6-inch offset from asphalt dike.
SOW Page 6
• Wheel stops must be installed centered and perpendicular to each white parking stall marking on south side of parking lot. Stalls on side edges, 4 total, will require an additional wheel stop. Please see diagram below:
Wheel Stop Layout (only for southern side parking stalls)
• All, 19, wheel stops shall be 6-foot in length minimum, 6-inches wide minimum.
• No damaged shall me made to existing asphalt surface during installation.
• Must comply with CalTrans Standard Specifications, 78-5 Parking Bumpers, specifically 78-5.02 Materials and 78-5.03 Construction.
Task 7: Site Clean-up and pollution prevention
• Contractor shall execute thorough site clean-up and prevent runoff or pollutants from entering soil or waterways at all times.
SOW 5.0 Delivery / Performance Schedule
Period of Performance: The contractor shall complete the work within 60 days of a receipt of Notice to Proceed with the lead time procurement, planning and scheduling of
45 days and 15 days for construction.
SOW 6.0 Government-Furnished Property, Materials, Services
General:
The Contractor shall furnish all personnel, materials, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the work tasks defined in this Performance Work Statement, except for those items specified as government-furnished.
SOW Page 7
Equipment:
The Government shall furnish the below equipment to assist the Contractor in meeting the requirement of this contract, including, traffic barricades. Except for those items specified as government furnished property and services.
Contractor is responsible for any equipment stored and used in the parking lot.
Facilities The Government will provide overall access to Greenwood Creek Parking lot and will provide gate key, within 24 hours upon request.
Utilities No utilities available in site, only vault toilet is available. The contractor shall provide drinking water for employees.
Applicable Publications (Current Editions):
2018, Standard Specifications; California State Transportation Agency (Caltrans).
SOW 7.0 Security and Administrative Matters
Security:
The Contractor shall be responsible for safeguarding all Government property provided for Contractor use or under their control, including securing all facilities the Contractor may access after normal business hours.
Contractor shall coordinate work schedule with Contracting Officers Representative to minimize public and employee ingress/egress to the building.
Safety:
The Contractor shall not require, or allow any employee, engaged in the performance of this Contract to work under conditions which are unsanitary, hazardous, or dangerous to his/her health or safety, as determined under safety and health standards promulgated by the Secretary of Labor under Section 107 of the Contract Work Hours and Safety
Standards Act (40 U.S.C. 327 et seq.) as amended and other Federal, State and applicable local government safety standards.
Department of Labor Code of Federal Regulations Title 29 and other Federal, State and local government safety standards will apply in its entirety to the Contractor.
Examples of applicable safety standards are OSHA 29 CFR 1910, OSHA 29 CFR 1926, California Title 19, "Public Safety", California Title 8, "General Industry Safety Orders", and 41 CFR, Subpart B, "Public Contracts, General Safety and Health Standards."
The contractor shall also use the “BLM SAFETY AND HEALTH STANDARDS” (The
Yellow Book) for reference.
Should the contractor fail to comply with any of these standards and regulations, the contractor shall be found to have defaulted on the terms of the contract.
SOW Page 8
Contingency Plan:
Sudden or unusual events could result in a negative impact to the delivery / performance of these requirements.
As an aid to properly plan for such events, the Contractor shall prepare and submit for approval a Contingency Plan for each Place of Performance for these requirements.
The Contractor will outline in detail the method(s) that the Contractor shall use in meeting Contract requirements in the following circumstances:
• a natural disaster occurs which impacts upon the Contractor's ability to perform
• a labor strike occurs which impacts upon the Contractor's ability to perform.
• a hazardous materials spill which impacts the Contractor’s ability to perform, or which may affects public safety
• an incident which causes major damage which impacts the Contractor's ability to perform
• other unforeseen circumstances
In all cases, the Contractor will assume that government cannot provide supplemental forces, and continues to need the same or additional performance under the Contract, which the Contractor must meet.
This Contingency Plan shall be submitted as a part of the Contractor proposal.
Emergency Response:
Response to emergency service calls outside of the normal business hours shall not exceed four (4) hours regardless of the time during the day or night, weekends or holidays.
Response to emergency service during normal business hours shall not exceed two (2) hours.
Response is defined as having all personnel and equipment required to correct an emergency at the site of the emergency or at a pre-approved staging area, ready, willing, and able to perform the emergency work. The Contractor will provide a draft emergency response plan prior to Contract start date.
Emergency Services:
On occasion, services may be required to support an activation or exercise of contingency plans outside the normal business hours described above. The Contractor's responsibilities for emergency support will be in accordance with the contingency plan.
Hazardous Materials and Hazardous Response:
The Contractor will conform to all Bureau, Federal, State, and local regulations in the use and disposal of hazardous materials and hazardous waste. The Contractor will provide
SOW Page 9 the appropriate response to any emergency involving hazardous materials at any of the facilities covered by this Contract. The Contractor will provide proof/certification of it's personnel qualified to work with hazardous materials and wastes to the Bureau. The
Contractor will notify the Bureau immediately upon discovering a release of hazardous waste into the environment.
Public contact:
Contractor personnel may encounter adjacent landowners or members of the public during the performance of their work.
Contractor personnel will present a professional appearance and be able to provide appropriate identification, including display of proper identification by each employee.
All Contractor and subcontractor personnel shall comply with all Federal and State laws relative to citizenship.
Contractor personnel shall inform any trespassers along the right of way of hazards and, as necessary and appropriate, ask trespassers to leave fenced off or restricted areas.
If Contractor personnel may encounter emergency personnel, policemen, or firemen along the right of way, the Contractor personnel shall notify the On-Site Foreman
If Contractor personnel encounter the news media, they should refer all questions to the
On-Site Foreman, who shall keep the COR informed of all news media contacts.
Government Observations:
Government personnel other than COR may from time to time observe, photograph, or otherwise record Contract operations. However, these personnel will not interfere with
Contractor performance.
Regular Work Hours:
The performance period established for this contract is based upon all work being conducted during regular working hours between 8:00am and 4:30pm, Monday through
Friday, excluding government holidays.
If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the COR in sufficient time to allow satisfactory arrangements to be made for access to the work site.
Communications:
“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Pacific Standard Time.
POC:
Armando Porras
Civil Engineering Tech.
279 977-8021
SOW Page 10 aporras@blm.gov
M-F (8:00 a.m. – 4:00 p.m.)
Office: 5152 Hillsdale Circle
El Dorado Hills, CA 95762
Federal Holidays:
The following Federal Legal Holidays are observed:
New Year’s Day Martin Luther King, Jr. Day
President’s Day Memorial Day
Juneteenth Day Independence Day
Labor Day Columbus Day
Veterans Day Thanksgiving Day
Christmas Day
Fire Danger Season:
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
Drawings:
Typical Drawings: Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
Reduced Size Drawings: Any drawings identified as "REDUCED SIZE DRAWINGS" are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full-size drawings may contact the Contracting Officer identified in the solicitation.
Preservation of Historical and Archeological Data:
The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are
SOW Page 11 ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
The Contractor will be responsible for protecting the cultural resources within the affected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
SOW 8.0 Technical Exhibits and Definitions
Standard Definitions:
Physical Condition
The Physical appearance of Federal equipment or facilities that considers cracks, chips, dents, abrasions, rust, corrosion, general cleanliness, vibration, operating temperature, and discoloration and other items as identified by the COR.. Physical condition may be determined by visual as well as diagnostic means.
Contracting Officer (CO)
The Secretary of the Interior or designated authorized representative who is the only agent capable of signing a federal award or obligating funds.
Contracting Officer’s Representative (COR)
The Contracting Officer’s designated representative as indicated in a delegation of authority letter.
Quality Assurance (QA)
Surveillance of Contractor performance to determine performance requirements are met.
Quality Control
Those actions taken by the Contractor to control the production of goods or services so that they meet the requirements of the performance work statement.
SOW Page 12
Technical Exhibits:
EX 1: Work Site Boundary
EX 2: Parking Lot & Driveway
SOW Page 13
EX 3: Parking Lot
EX 4: Driveway
SOW Page 14
EX 5: Asphalt Surface
EX 6: Shuttle Loading Zone
SOW Page 15
EX 7: Driveway Entrance and gate
EX 8:50-foot, Red, Asphalt Fire Lane/Curb
SOW Page 16
EX 9: Parking Lot Layout