This draft Performance Work Statement (PWS) details the Bureau of Land Management's (BLM) Nevada Terrestrial Assessment, Inventory, and Monitoring (AIM) Surveys for the 2026 field season. The project involves collecting terrestrial data across multiple Nevada districts, with a total of 433 sampling points to be surveyed between April and September 2026. The contractor will be responsible for conducting comprehensive environmental assessments using specific methodologies, including plot characterization, vegetation measurements, soil analysis, and supplemental data collection methods like sagebrush shape recording and plant density counts.
The contract is structured with incremental payments totaling 100% of the award, with milestone payments ranging from 15-20% based on training completion, points sampled, and data quality control. The project requires a field crew with specific qualifications, including a project manager with a bachelor's degree in a relevant scientific field and at least two years of professional experience. Key requirements include using electronic data capture devices, following BLM monitoring manuals, completing calibration training, and submitting data through Survey123. The work will be conducted across various BLM districts in Nevada, including Battle Mountain, Elko, Ely, Southern Nevada, Winnemucca, and Humboldt River Field Office areas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Request_for_Information___Terrestrial_AIM_NVSO_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF LAND MANAGEMENT
Nevada Terrestrial
Assessment, Inventory, and Monitoring Surveys
Performance Work Statement (PWS)
DRAFT
1. INTRODUCTION
The Bureau of Land Management (BLM) in the state of Nevada is collecting Terrestrial Assessment, Inventory and Monitoring (AIM) data to document effectiveness of the decisions established in its Resource Management Plans, to determine treatment effectiveness, and for habitat evaluation, among others. The Assessment, Inventory and Monitoring (AIM) strategy is one of the approved monitoring strategies for land health monitoring.
This scope of work is for Terrestrial AIM data collection. The requisite scope of work includes 433 points in the 2026 field season, as reflected in Table 1.
2. BACKROUND
2.1 Period of Performance
The period of performance for this project is 12/01/2025 through 11/30/2026.
2.2 Regulatory Guidance
The contractor shall be responsible for collecting data at targeted and randomly distributed points on BLM administered lands throughout individual BLM Districts within Nevada as depicted in Table 1. Data collection occurs in accordance with the most current version of the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems found on the https://www.blm.gov/aim website. At all plots, core methods as described in the Monitoring Manual will be followed in addition to the sagebrush shape contingent method associated with the Line Point Intercept Core Method. Additionally, for Ely District ESR plots, the plant density supplemental method will be collected (See Table 1). See Section 3.2.2 for details on contingent and supplemental data collection methods. Data collection shall be implemented at appropriate time windows for vegetation expression as detailed in Table 1.
Revisit plots will not require the completion of a soil pit or the plot characterization form.
The number of plots that will require a soil pit and the completion of the plot characterization form including determination of soil component and ecological site are described in Table 1 under the “Number of Plots with Soil Pits” column.
Table 1. Workload of plots per District and Project
District Office or Project
Total Number of Plots
Number of Plots with Plot Characterization (includes soil pit) Dates for Data Collection
Methods including supplemental methods
Battle Mountain District Land Use Plan (LUP) Effectiveness 50 10
MLRA 30 plots April 15 through July 15, other plots May 1 through September
Core methods plus sagebrush shape and forb frequency. Joshua tree demographics on 2 plots https://www.blm.gov/aim
Elko District Land Use Plan (LUP) Effectiveness 50 10
May 1 through September
Core methods plus sagebrush shape and forb diversity.
Ely District Land Use Plan (LUP) Effectiveness 50 40
MLRA 30 plots April 15 through July 15, other plots May 1 through September
Core methods plus sagebrush shape.
Joshua tree demographics on 4 plots.
Southern Nevada District Land Use Plan (LUP) Effectiveness 50 50 April 1 through July 15
Core methods plus sagebrush shape and forb frequency. Joshua tree demographics on 20 plots.
Winnemucca District Land Use Plan (LUP) Effectiveness 50 10
May 1 through September
Core methods plus sagebrush shape and forb frequency.
Ely District Emergency Stabilization and Rehabilitation (ESR) Treatment Effectiveness 90 33
MLRA 30 plots April 15 through July 15, other plots May 1 through September
Core methods plus plant density
Battle Mountain District Fuels Treatment Effectiveness 13 13
MLRA 30 plots April 15 through July 15, other plots May 1 through September 30 Core methods only
Winnemucca District Emergency Stabilization and Rehabilitation (ESR) and Fuels Treatment Effectiveness 30 20
May 1 through September
Core methods plus plant density
Humboldt River Field Office Wildlife 50 10
May 1 through September
Core methods plus forb frequency and APSI
Totals 433 196
2.3 Project Timeline and Deadlines
This project shall follow the timeline presented in Table 2.
Table 2: Project Timeline and Deadlines
Timeframe Description of Work December 2025 coordinate and conduct kick off meeting January-February 2026 hire field crews, equipment set up
February 2026
Early season (Southern Nevada District and MLRA 30) sample point coordinates provided to contractor by BLM. A geodatabase of point locations will be provided to the contractor no later than March 1, 2026
March 2026
A second geodatabase of point locations for the remaining points outside of Southern NV/MLRA 30 will be provided to the contractor no later than April 1, 2026.
March-April 2026 Coordinate and conduct pre-data collection meetings
March-April 2026
Early season (Southern Nevada District and MLRA 30 crews and crew managers attend Core Methods Training and complete initial calibration. Training location to be determined.
April 2026 Southern Nevada and MLRA 30 data collection begins
Late April 2026
Late season crews and crew managers attend Core Methods Training and complete initial calibration. Preferred location for training is Carson City, NV
May 2026 Data collection outside of Southern Nevada and MLRA 30 begins
July 15, 2026 Data collection is complete for Southern Nevada and MLRA 30.
September 30, 2026 Data collection for the remainder of Nevada is complete.
October 2026 Quality control and data edits are completed by contractor no later than October 31, 2026
November 2026
BLM quality control and data review period. Data edits recommended by BLM are completed or justification provided by 11/30/2026
2.4 Location Conditions
Data collection often occurs in remote locations, where cellular connection is unavailable or inconsistent. The BLM recommends that field crews be prepared to camp in primitive conditions over several days and to collect data in multi-day “hitches” to minimize travel time.
Data collection points may be up to 3 miles from a road (including 4WD or jeep roads) and may be on slopes as steep as 50%. Accessing sample point locations sometimes includes difficult off-trail route finding and planning ahead of time using a variety of tools such as topographic maps and aerial photos to locate the best and safest routes to sample locations. Weather conditions are variable and can include extreme heat and cold, monsoonal thunderstorms that can create flash-flooding, high wind speeds, and dust storms. Hazards created by wildlife and humans could be encountered. Under oversight of the contractor’s project/crew manager, field crews shall be responsible for safety and for appropriate coordination with local BLM field offices regarding rejection of sample points, possible hazardous conditions, and/or protection of local resources. In addition to attending the BLM provided field training, contractor personnel shall attend a general orientation at the local field offices or virtually to be informed of local issues, safety measures, and resource concerns.
3. SCOPE / TASKS
3.1 TASK 1 - COORDINATION
Once the contract is awarded, coordination is required between the contractor and BLM Nevada State Office Monitoring Coordinator, local AIM Field Office Leads and National AIM Team as described in Table 3.
3.1.1 Post Award Kick Off Meeting
After award, the contractor shall coordinate a meeting with the COR and BLM Nevada State Office Monitoring lead to discuss the survey design, field methodologies, training, and to answer any questions related to the monitoring effort. December 2025 is a recommended timeframe for the kickoff meeting.
3.1.2 Pre-Collection Meetings
At least one month prior to data collection, the contractor shall coordinate additional meetings with the COR, BLM Nevada State Office, and Field Office leads to discuss sample order strategy, reach evaluation criteria, and to answer any remaining questions related to the monitoring effort. Sample points shall be available in ArcGIS Online (AGOL) at least 30 days prior to the start of data collection. If a sample point must be rejected in the field, the point shall be replaced in accordance with the standards outlined in the official AIM point rejection protocol found in the Data Management Protocol document (https://www.blm.gov/aim/resources).
Table 3. Terrestrial AIM implementation roles and responsibilities.
Responsible parties
Data collection phase Task
National
AIM
Team
State Office Lead
Field Office Lead
Contractor Crew
Manager
Contractor Data
Collector Crew
Field season preparation
Hire/onboard field crews Lead
Equipment purchasing, calibration, set-up Lead
Safety training Lead Participate
Pre-training materials Co-lead Co-lead
Co-lead (Field Office training cadre)
Co-lead or Participate
Field trainings Assist Lead
Co-Lead (Field Office training cadre)
Assist or Participate Participate
Office point evaluation Assist Lead Lead
Provide landowner contacts Lead
Contact landowners for permission where needed Lead Assist
Data collection during field season
Hitch planning Lead Assist
Crew check-in and safety Assist Lead Participate
Monitoring Manual and Data Management Protocol assistance Assist Assist Assist Lead Participate
Field Maps/Survey 123 assistance Lead Assist Assist Participate
Data collection Assist Lead
Field QC of data in Survey123 Co-lead Co-lead
Office QC of data Lead
Regular data checks Participate Participate Participate Lead Participate
After field season
Ensure final data submission meets standards Assist Assist Assist Lead Lead
3.1.3 Hitch Plans
The contractor shall provide the COR, BLM State Office lead, and respective Field Office lead with a hitch plan including dates of field work, planned sample points, planned access routes prior to each hitch, and alternate sample points in case the planned sample points are rejected or temporarily inaccessible. In order to ensure BLM Field Office leads, have time to review and comment on the hitch plan, the draft hitch plan shall be provided to the COR, State Office Lead, and the respective Field Office lead at least six days in advance of each hitch. Given the interdependence of sample point progress among hitches, and unforeseen circumstances or access challenges, a need for flexibility in specific hitch plans is acknowledged.
3.2 TASK 2 – DATA COLLECTION
3.2.1 Timeframe
Data collection shall begin as specified in Section 2.3 ‘Project Timelines and Deadlines’ and according to the dates in presented in Table 1. The geography of Nevada dictates that windows of proper vegetation expression for data collection occur in an early season and a later season.
The early season occurs in the Mojave Desert portion of Nevada (Major Land Resource Area 30), which is in the southern part of the state and includes the Southern Nevada District and small portions of the Battle Mountain and Ely Districts. Less than 80 points total will be included in the early season. Data collection for MLRA 30 and Southern Nevada shall occur between April 1 and July 15.
The late season includes the remainder of the state, most of which is included in the Great Basin region. Data collection for this portion of Nevada, which includes all plots in the Winnemucca and Elko Districts, as well as most plots in the Battle Mountain and Ely Districts, shall occur between May 1st and September 30th.
Data collection must occur within these time windows with few exceptions (e.g., for unique weather conditions or due to wildfire activity preventing access to plot locations). Additionally, within these time windows, hitch plans shall be constructed to maximize optimal vegetation expression due to variations in local conditions, i.e. lower elevation points should be sampled earlier in the season, and higher elevation points generally later in the season. This timeframe generally corresponds to when vegetation is most readily identifiable in accordance with the most current version of the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems.
3.2.2 Data Methods
The contractor shall follow the latest version of the Terrestrial AIM Data Management Protocol, which includes the Calibration Protocol, Rejection Protocol, and Data Backup Protocol, and can be found on https://www.blm.gov/aim/resources.
Plot layout shall include three 25 meter transects arranged in a spoke with a bearing of 0°, 120° and 240°. Orientation of points shall be done using magnetic north with no correction for declination.
Samples points designated as revisits (not to be confused with revisit designs) shall be identified with appropriate changes in method collection and with guidance on office plot monument preferences.
3.2.3 Core Methods
Core methods shall be completed at each plot and shall include the following (with adjustments regarding revisits in accordance with the revisit guidance):
• Plot Characterization (required only for new plots as designated in Table 2)
Completion of all relevant fields in the Plot Characterization form included in the Monitoring Manual and Data Management Protocol.
A soil pit dug to 50-100cm in diameter and to a depth of at least 70cm or to the the depth where a restrictive layer such as a petrocalcic horizon or bedrock is encountered. The soil pit shall be placed in an area representative of the plot as a whole. The following soil pit attributes are required for each horizon described: horizon depths, percent rock fragments, soil texture, percent clay, soil color (dry or moist), soil structure, and effervescence.
Determination of the soil series (or other map unit component) and ecological site in the field at the plot location using soil map unit, ecological site and official soil series descriptions.
• Plot Observation
Completion of all relevant fields in the Plot Observation form included in the Monitoring Manual and Data Management Protocol.
Averaged GPS locations of plot center and the starts and ends of transects BLM staff may provide information on disturbance, management, and treatment history of areas where plots are located to populate in the notes section of this https://www.blm.gov/aim/resources form. If the BLM provides this information in the form of a word document or spreadsheet by May 1, 2026, then the contractor shall enter that information into the form. If BLM does not provide this information by May 1, 2026, then the contractor shall use field observations to populate the form.
• Photos
Photos shall be taken and provided to BLM in the Survey123 data collection application.
A photo shall be taken from the start of each Transect facing away (total of three photos, one for each transect) and one photo of soil pit. For LUP projects an additional 3 photos shall be taken from the ends of the transects facing toward plot center. Additionally, if transect photos are blocked by vegetation or other obstructions making it difficult to see the transect, then additional transect photos shall be taken.
Each transect photo will include a photo board with information on the site, date, Plot ID, transect number and transect azimuth. The photo board shall be placed at the start (or end if applicable) of the transect. If the photo board is not visible at the start (or end) of the transect due to rocks or vegetation, then it shall be moved slightly to the right or left, or no more than 1m in front of the transect start or end.
If the photo board is still obscured, then a person may hold it. The person should minimize their size in the photo as much as possible and turn their head away and be wearing appropriate attire for field work in the photo.
• Line-point Intercept (LPI) LPI observations shall be made every 0.5m along each 25m transect, for a total of
150-point observations per plot.
Plants shall be identified to the species level whenever possible with the exception of Artemisia tridentata and Artemisia arbuscula which should be identified to the sub-species. For plants that cannot be immediately identified to the species level, the completion of an unknown plants form is required. Photos of unknown plants shall be taken, and collection of specimens from outside the plot area can be taken, if it is certain that the plant being collected is not a BLM sensitive or threatened or endangered species. See section 3.2.7 for additional guidelines on plant identification and unknown plants.
Soil surface codes for rock fragments shall be collected using the full classification system of gravel, cobble, stone and boulder.
• Vegetation Height Vegetation heights shall be recorded at every 5th LPI observation, e.g. every
2.5m.
• Gap Intercept Gap intercept shall be collected along each 25m transect, for a total of 75m of gap intercept data per plot.
• Soil Aggregate Stability
18 soil surface samples shall be collected and tested for stability along three transects (six per transect line). Less than six samples may be collected along a line while adhering to the move protocol.
• Plot-Level Species Inventory Plants shall be identified to species whenever possible except for sagebrush
(Artemisia tridentata and Artemisia arbuscula), which shall be identified to the sub-species level. For plants that cannot be immediately identified to the species level, the completion of an unknown plants form is required. Photos of unknown plants shall be taken, and collection of specimens from outside the plot area can be taken, if it is certain that the plant being collected is not a BLM sensitive or threatened or endangered species. See section 3.2.7 for additional guidelines on plant identification and unknown plants.
An estimate of the abundance of each species on plot shall be made using the following categories and as described in the current Terrestrial Data Management Protocol (found on https://www.blm.gov/aim/resources):
• 1-5 individuals
• 6-10 individuals
• 11-100 individuals
• 101-500 individuals
• 501-1000 individuals
• >1000 individuals
3.2.4 Supplemental Methods
Supplemental methods shall be completed as indicated below, with all supplemental data collected in Survey123. These include:
• Sagebrush shape o For all LUP plots, each time a live sagebrush ≥20 cm in height is recorded as foliar cover when conducting line-point intercept, the shape of the sagebrush shall be recorded (spreading or columnar) as described in the 2019 Modified
HAF v. 2.0 guide (p. 14, Attachment 1). Please note that the 2019 Modified HAF was developed by BLM Idaho for use across the western United States where sagebrush ecosystems are present.
• Plant Density o For Ely ESR and Winnemucca ESR projects, the Plant Density supplemental protocol will be implemented on all plots. Perennial plant density counts by species will be recorded at five 1x1m quadrats along each transect for a total of 15 quadrats per plot. This protocol is described in Appendix A.
• Forb Frequency o For all Land Use Planning (LUP) and for the Humboldt River Field Office Wildlife project, the HAF forb frequency protocol shall be implemented at all plots, modified from Appendix B of the Sage-Grouse Habitat Assessment Framework (BLM TR 6710-1). This protocol consists of recording the presence of forb species from 1m radius semi-circles spaced every 2 meters along each transect for a total of 12 measurements per transect or 36 measurements per plot. This protocol is described in Appendix B.
• APSI
o For the Humboldt River Field Office Wildlife project, the AIM Pollinator
Supplementary Indicator (APSI) protocol will be implemented. This protocol involves recording information on pollinators and plant phenology. This protocol is designed for AIM crews that do not have strong experience in pollinator identification. This protocol is described in Appendix C.
• Joshua Tree Demography o For LUP plots located in Joshua tree (Yucca brevifolia and Yucca jaegeriana) habitat, the Joshua tree demographic protocol shall be conducted. This will occur on no more than 26 plots total as identified in Table 2. This protocol involves locating, measuring and assessing all live and dead Joshua tree individuals within a 50x 50m square plot superimposed on top of the 30m radius circular AIM plot. This protocol is described in Appendix D.
No other contingent indicators or supplemental indicators shall be collected.
3.2.5 Plot Monumentation
For any plots visited for the first time (i.e. those that require plot characterization), or any revisit plots with missing monumentation, plots shall be marked as follows:
Plot center shall be monumented with capped or bent rebar
For LUP revisit plots, starts and ends of transects shall also be marked with rebar.
Rebar is not required on transects for ESR, Fuels, or non-revisit LUP plots.
For plots on the Ely District, plot center rebar shall be marked with a 3.25” diameter metal monument cap engraved with the Plot ID.
The contractor is responsible for providing rebar and cap supplies for monumentation. For revisit plots, the crews shall search for a minimum of 30 minutes for previously established monumentation before re-establishing new monumentation.
3.2.6 Monitoring Methods Questions
All questions regarding monitoring methodology that are not answered by the most current version of the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems found on the https://www.blm.gov/aim website and other technical guides, as provided, shall first be addressed by the contractor, and then the BLM State Office lead, if further guidance is needed.
3.2.7 Plant Species Identification Guidelines
• Contractor is responsible for ensuring that data collectors can identify local plants to the species or sub-species, either by providing specialized local information or training, or by requiring formal educational or work experience background in field botany for data collectors.
• If species are encountered during data collection that are unusual for the area or habitat in which they are being recorded, then those species shall be recorded as unknowns and unknown plants forms shall be completed. This includes species without herbarium records or other research-grade observations within 50km of the plot location, or for species that would be unusual for the ecological site that they occur within. Examples of this include an obligate wetland species occurring in an upland area, or a species known to be restricted to alpine environments located in a lower montane or valley floor setting.
• New unknown plants forms shall be completed for every plot in which they are encountered (i.e.
the same unknown plant code shall not be repeated across multiple plots). Dead beyond recognition codes shall not be used.
3.2.8 Electronic Capture Devices
Electronic data capture while field sampling is required by the BLM. In the event that electronic data capture is not possible due to unforeseen circumstances, any data that is collected using paper forms shall be entered into Field Maps/Survey123 no later than ten working days after data collection takes place. The data shall be error-checked in detail after it is entered into Survey123. Refer to the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems – Second Edition and Terrestrial Data Management Protocol in the Field Crew Data Management section for additional information, found on the www.blm.gov/aim website.
Contractor is responsible for providing and setting up electronic capture devices with the current versions of AIM data capture applications. A list of these applications can be found on the AIM
DRAFT
https://www.blm.gov/aim http://www.blm.gov/aim
Data Capture Applications page: https://www.blm.gov/aim/resources Data Capture Applications.
Prior to fieldwork, applications must be populated with fields and picklists appropriate for the Field Office.
3.2.9 Rejected Points
If a point must be rejected in the field, in accordance with the standards outlined in the Terrestrial Data Management Protocol (found at https://www.blm.gov/aim/resources under Data Management Protocols, the contractor shall move on to one of the oversample points, as directed. Contractor shall communicate with the District Project lead and State Office Lead when field rejecting points. Points shall be rejected if they are greater than 3 miles walking distance or on slopes greater than 50 percent and implementing the move protocol as described in the Data Management Protocol does not place them in an area with a slope less than 50 percent. There may also be additional project-specific rejection and moving criteria.
3.2.10 Private Land Access
The contractor shall coordinate with BLM regarding private land access issues. If private land will be crossed in the process of collecting the data, the contractor shall contact the private landowner to acquire permission to cross their land. Contact information will be provided by the BLM field office project lead, if available. To comply with State law, private land permission shall be granted before the contractor crosses private land to comply with State law.
3.3 TASK 3 – QUALITY ASSURANCE, QUALITY CONTROL AND DATA TRACKING
The contractor shall follow and implement the Quality Assurance/Quality Control (QA/QC) steps outlined in the most current version of the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems and the latest Terrestrial Field Crew Data Management Protocol (https://www.blm.gov/aim/resources). The contractor shall complete the appropriate sections in Field Maps/Survey123 to show that the data has been checked for errors.
3.3.1 Calibration
Data collectors must calibrate as described in the Terrestrial AIM Data Management Protocol.
This includes calibrating every 30 days, or when a crew moves to a new vegetation type (e.g from a shrubland to a grassland), or a new crew member joins the crew. Calibration must be completed for the following methods: Line Point Intercept, Height, Gap Intercept, and Species Inventory.
The contractor shall submit calibration data in Survey123 using the calibration forms. These calibration plots will be seen in real time as soon as the information is uploaded for state office and appropriate Field Office lead(s) to review regularly.
3.3.2 Survey123
Field data shall be submitted via Survey123. Any data that is collected using paper forms shall be entered into Field Maps/Survey123 no later than ten working days after data collection takes place. The data shall be error-checked in detail after it is entered into Survey123. The procedure for this can be found in the most current version of the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems and the most current version of the Terrestrial Data Management Protocol in the Field Crew Data Management section.
3.3.3 Quality Assurance Visits
Upon request, the contractor shall allow BLM employees such as State Office leads and Field Office leads and/or stakeholders such as permittees or members of the public to attend and observe monitoring efforts.
3.4 TASK 4 – CONTRACTOR SUBMITTED DATA
3.4.1 Survey Synchronization
Completed surveys shall be uploaded to (synchronized with) the AIM enterprise database at the end of each day or as often as it is possible to connect to a Wi-Fi or cellular network with adequate bandwidth. When working in remote areas where it is not possible to connect regularly, backing up survey forms is recommended. The procedure for this is described in the latest version of the Terrestrial Data Management Protocol found at:
https://www.blm.gov/aim/resources.
4. CONTRACTOR FURNISHED EQUIPMENT
The contractor shall furnish the following equipment in performance of this contract.
4.1 Gear and Electronic Devices
All Terrestrial AIM gear, including electronic devices for data capture and equipment required to collect contingent indicators, is listed in the equipment checklist provided at https://www.blm.gov/aim/resources and also below.
o Electronic data capture tablets for Field Maps/Survey 123 data collection. Tablets shall use either Android or iOS operating systems and be upgradable to the current version of their respective operating system, for compatibility with listed applications. Tablets shall include a 10 megapixel or better digital camera and a GPS system with 5m accuracy.
o Professional grade compass with foldable mirror o The contractor is responsible for all other materials needed to successfully
DRAFT
complete the monitoring including but not limited to:
Clinometer Shovel 2mm Soil sieve Transect tapes and stakes Soil Stability kits Munsell soil color chart NRCS Field Book for Describing and Sampling Soils Soil knife Soil pit tape HCL for effervescence tests Plant press Plant ID books Pin flags 1m plant density frame or folding rulers
4.2 Field Vehicles
4.2.1 Four Wheel Drive
Field vehicles: 4-wheel drive (4X4) vehicles with high clearance are required to access some sampling locations. All terrain 10-ply tires are highly recommended.
4.2.2 Utility/All-Terrain Vehicle
A UTV/ATV may be needed to access some points. UTV/ATV equipment needed to access a point will be at the discretion of, and supplied by, the contractor. In using UTV/ATV equipment to access sites, no sustained impact to resource values should occur. UTV/ATVs must remain on designated roads and trails. Off-trail cross-country use of UTVs/ATVs is not allowed. Additionally, some roads are designated for street-legal vehicles only. Motorized access to wilderness or wilderness study areas will not be allowed, unless by written permission of the appropriate BLM Field Office manager. It is the responsibility of the contractor to know the rules and regulations when it comes to use of UTV/ATVs.
5. PERSONNEL & QUALIFICATIONS
5.1 Key Personnel: Project/Crew Manager
5.1.1 Project/Crew Manager Qualifications
The contractor shall designate a project/crew manager as its primary point of contact and to lead implementation of tasks as identified herein. At a minimum, the designated project/crew manager shall have the following education and experience:
• Bachelor’s degree in biological sciences, agriculture, natural resource management, chemistry, or a related discipline such as environmental science, conservation, ecology, rangeland management, or hydrology that included a combination of the plant, hydrology, and soil sciences, and natural resources management; and
• A minimum of two years of professional experience managing complex projects and/or field crews relevant to the collection of terrestrial rangeland data.
5.1.2 Replacement Approval
Key personnel assigned to this contract shall not be removed or replaced without prior written approval of the Contracting Officer’s Representative (COR). Approval/disapproval of key personnel replacement is the responsibility of the Contracting Officer (CO).
5.1.3 Personnel Availability
The contractor shall immediately notify the COR when key personnel are unavailable for work under this contract for a continuous period exceeding five field survey days.
5.2 Field crew
A minimum of two individuals, forming one crew, is required at each monitoring site. Each crew will have one crew lead, responsible for the contractor data collection crew responsibilities noted in Table 3. For previously visited plots that do not require a soil pit, a crew size of two is adequate and recommended. While not required, it is recommended to utilize a three-person crew for newly established plots that require a soil pit.
Collectively, the individuals in the crew who participate in collecting monitoring data will need to have the following qualifications:
• Field Botanist or Rangeland Management Specialist
• Field Soil Scientist
5.3 Terrestrial AIM Core Methods Training
Data collectors and crew managers responsible for Terrestrial AIM data collection must have successfully completed a BLM led Terrestrial AIM Core methods training during the year in which data will be collected. Contractor staff shall complete online training materials before attending field methods training. In rare circumstances, staff responsible for data collection will be hired after all of the trainings have been concluded. All data collectors must be trained before collecting and submitting data. The contractor must communicate all staff changes throughout the field season with the State Monitoring Lead so that contingent training options can be identified. Information about these trainings is available at https://www.blm.gov/aim/training.
https://www.blm.gov/aim/training
6. GOVERNMENT FURNISHED INFORMATION AND PROPERTY
6.1 ESRI Access
The BLM will provide the contractor with access to ESRI feature services of the sample points that have been reviewed against office rejection criteria, as well as the associated coordinate locations. If feature services are not available or accessible, the BLM may elect to provide this information in GIS format or CSV spreadsheet. Any other information including GIS data needed to complete the data collection will be considered upon request. The Government will not supply any other equipment, or property for completion of this contract.
7. CONTRACTOR FURNISHED PROPERTY
The contractor shall provide all personnel, resources, tools, equipment and incidentals necessary to complete the services required in this contract SOW.
8. PAYMENTS AND DELIVERABLES
The following (Table 5) includes the required deliverables to be completed before the Government will accept services to allow for payments prior to the end of the period of performance:
8.1 Table 5. Payment and Deliverable Schedule.
Item Date Deliverable(s) Payment Price Proposal Tasks
1 April 30, 2026 March/April training + 10% early season points sampled, initial quality control conducted, and data delivered
15% of total award 1, 2, 3, 4
2 June 30, 2026 Late April Training, +25% more points sampled, initial quality control conducted, and data delivered
20% of total award 1, 2, 3, 4
3 July 30, 2026 25% more points sampled, initial quality control conducted, and data delivered
20% of total award 1, 2, 3, 4
4 August 30, 2026 25% more points sampled, initial quality control conducted, and data delivered
20% of total award 1, 2, 3, 4
5 September 30, 2026 15% points sampled, initial quality control conducted, data delivered
15% of total award 1, 2, 3, 4
6 October 30, 2026 Final quality control checks and data edits by contractor completed
5% of total award 1, 3, 4
7 November 30, 2026 BLM recommended data edits completed
5% of total award 1, 3, 4
9. TRAVEL
In accordance with P.L. 99-234, "Federal Civilian Employee and contractor Travel Expense Act of 1985", travel-related expenditures for contractor's personnel are restricted to the limits established for federal employees. This includes mileage for company-owned vehicles. The contractor is responsible for travel coordination and expenses for its personnel as required to support the tasks at the performance locations stated in this PWS. Contractor travel shall comply with all effective Federal Travel Regulations (FTR), including those supplemented by the Department of the Interior (DOI) travel regulations. No Federal travel authorizations are to be issued. The price for travel authorized by Federal and DOI travel regulations shall not include overhead, G&A, nor profit.
10. QUALITY
The Government will measure Quality based on the following Table 6 – Performance Requirement Summary (PRS):
10.1 Table 6 – Performance Requirement Summary (PRS)
PERFORMANCE
OBJECTIVE PERFORMANCE STANDARD
Acceptable Quality Level
(AQL)
METHOD OF
REVIEW
Overall
Timeliness – All contract documentation and contract requirements submitted within required milestone timeframe(s).
Accuracy – all documents conform to formatting requirements, agency directives, department directives and the Federal Acquisition Regulations.
Professional – All Documents are well organized, grammatically correct and demonstrate sound professional evaluation and analysis.
95% BLM COR review
Task 1 Coordination
The contractor shall meet with each Field Office lead on at least one occasion before beginning data collection. The BLM is notified of expected sampling schedules prior to each field hitch by email. The contractor shall hire crew members and ensure the crew members attend training. The contractor shall allow BLM employees or stakeholders, such as permittees or members of the public to attend and observe monitoring efforts to ensure data is being collected in compliance with the methodologies described in the Monitoring Manual for Grassland, Shrubland, and Savanna Ecosystems and the latest data management protocol available.
99% BLM COR review
Task 2 Data Collection
The data will be collected using the required methodologies and will be 100% complete, including water quality and macroinvertebrate samples.
100% BLM COR review
Task 3 Quality Control and
Data Tracking
Quality of data submitted to the BLM demonstrates that QA/QC has occurred. Quality of analyses and reports submitted to the BLM demonstrates that careful work and review has occurred. Reports and analyses are complete and on time. The BLM will be allowed 15 days to ensure data quality prior to acceptance.
100% BLM COR review
Task 4 Provide Data to the
BLM
BLM receives the data in Survey 123 and web maps as described in Tasks 2 and 3. Data is received by September 30. Final quality control is conducted and completed by October 31. BLM recommended data edits are completed or justification provided for why data edits are not appropriate is completed by November 30.
100% BLM COR review
| 1. INTRODUCTION |
| 2. BACKROUND |
| 2.1 Period of Performance |
| 2.2 Regulatory Guidance |
| 2.3 Project Timeline and Deadlines |
| 2.4 Location Conditions |
| 3. SCOPE / TASKS |
| 3.1 TASK 1 - COORDINATION |
| 3.1.1 Post Award Kick Off Meeting |
| 3.1.2 Pre-Collection Meetings |
| 3.1.3 Hitch Plans |
| 3.2 TASK 2 – DATA COLLECTION |
| 3.2.1 Timeframe |
| 3.2.2 Data Methods |
| 3.2.3 Core Methods |
| 3.2.4 Supplemental Methods |
| 3.2.5 Plot Monumentation |
| 3.2.6 Monitoring Methods Questions |
| 3.2.7 Plant Species Identification Guidelines |
| 3.2.8 Electronic Capture Devices |
| 3.2.9 Rejected Points |
| 3.2.10 Private Land Access |
| 3.3 TASK 3 – QUALITY ASSURANCE, QUALITY CONTROL AND DATA TRACKING |
| 3.3.1 Calibration |
| 3.4 TASK 4 – CONTRACTOR SUBMITTED DATA |
| 3.4.1 Survey Synchronization |
| 4. CONTRACTOR FURNISHED EQUIPMENT |
| 4.1 Gear and Electronic Devices |
| 4.2 Field Vehicles |
| 4.2.1 Four Wheel Drive |
| 4.2.2 Utility/All-Terrain Vehicle |
| 5. PERSONNEL & QUALIFICATIONS |
| 5.1 Key Personnel: Project/Crew Manager |
| 5.1.1 Project/Crew Manager Qualifications |
| 5.1.2 Replacement Approval |
| 5.1.3 Personnel Availability |
| 5.2 Field crew |
| 5.3 Terrestrial AIM Core Methods Training |
| 6. GOVERNMENT FURNISHED INFORMATION AND PROPERTY |
| 6.1 ESRI Access |
| 7. CONTRACTOR FURNISHED PROPERTY |
| 8. PAYMENTS AND DELIVERABLES |
| 9. TRAVEL |
| 10. QUALITY |
File details come from the government source that posted it. Updated .