A14_24R0004_Drawings_DRAFT_2.pdf

PDF 17 MB Posted

Attached to
Wildcat Canyon Dam Reconstruction Federal contract opportunity
Solicitation number
140L0624R0004
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This file contains draft drawings related to the federal contract opportunity for the Wildcat Canyon Dam Reconstruction project. The solicitation was issued by the Bureau of Land Management National Office as a pre-solicitation notice for opportunity number 140L0624R0004. The project involves reconstructing Wildcat Canyon Dam and the solicitation will include requirements for engineering and construction services. Response and award dates were not provided in the file or related opportunity description.

View the file

Other files for this federal contract opportunity

Other files attached to Wildcat Canyon Dam Reconstruction, newest first.
File Type Posted
A14_Sources_Sought_140L0624R0004_3.pdf PDF
A14_Sources_Sought_140L0624R0004_2.pdf PDF
A14_24R0004_Project_Specs_DRAFT_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IN 2019, THE BLM COMPLETED A WATERSHED ASSESSMENT AND RESTORATION PLAN FOR THE LABARGE WATERSHED IN SUBLETTE AND LINCOLN COUNTIES IN SOUTHWEST WYOMING. THE STUDY AREA INCLUDED APPROXIMATELY 250 SQUARE MILES IN THE DRY BASIN DRAW, DRY PINEY CREEK AND BIRCH CREEK WATERSHEDS. THE SUBJECT WATERSHEDS ARE LOCATED WITHIN AN EXISTING 100-YEAR OLD OIL AND GAS FIELD WITH MORE THAN 1,800 ACTIVE WELLS OF VARYING AGE AND CONSTRUCTION. SURFACE DISTURBANCE FROM ROAD AND DRILLING PAD DEVELOPMENT HAS CONCENTRATED STORMWATER RUNOFF AND CAUSED ACCELERATED EROSION OF THE HIGHLY SENSITIVE

LANDSCAPE, RESULTING IN EXCESS FINE SEDIMENT DELIVERY TO THE UPPER GREEN RIVER.

THE LABARGE WATERSHED RESTORATION PLAN PRIORITIZED 19 SITES FOR RESTORATION INCLUDING SITE BLM-60 WILDCAT CANYON DAM. THE PURPOSE OF THIS PROJECT IS TO REMOVE AN EARTHEN IMPOUNDMENT AND RE-GRADE EXISTING INCISED CHANNELS TO RE-ESTABLISH A BROAD EPHEMERAL DRAW WITH NUMEROUS STABLE MICRO CHANNELS. THE PROJECT GOAL IS TO PREVENT FURTHER DEGRADATION AND EROSION WITHIN THE STUDY AREA WATERSHEDS AND RE-ESTABLISH, MAINTAIN AND/OR IMPROVE EPHEMERAL CHANNEL FUNCTIONS. THE FOLLOWING OBJECTIVES WERE DEVELOPED COLLABORATIVELY BY BLM AND THE PROJECT STAKEHOLDERS TO GUIDE RESTORATION ACTIONS:

· ADDRESS THE PROCESSES RESPONSIBLE FOR LANDSCAPE DEGRADATION;

· PROTECT RESOURCES WITHIN THE PROJECT WATERSHEDS INCLUDING INFRASTRUCTURE, ECONOMIC RESOURCES, PRIVATE LAND, WATER RESOURCES AND ECOLOGICAL

RESOURCES;

· MANAGE SEDIMENT DELIVERY TO THE UPPER GREEN RIVER; AND

· IDENTIFY OPPORTUNITIES FOR CONSERVATION AND STEWARDSHIP.

PROJECT DESCRIPTION

PROJECT SPONSOR

WILDCAT CANYON DAM REMOVAL

CONSTRUCTION DRAWINGS

PROJECT VICINITY MAP

DRAWING INDEX

1.0 COVER PAGE

2.0 EXISTING CONDITIONS

3.0 ACCESS AND STAGING

3.1 SURVEY CONTROL SHEET

4.0 SITE PLAN

4.1 GRADING PLAN AND PROFILE

5.0 CROSS SECTIONS

5.1 CROSS SECTIONS

5.2 CROSS SECTIONS

6.0 RECLAMATION PLAN

ENGINEERS SEAL

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

PINEDALE FIELD OFFICE

1625 WEST PINE STREET

PINEDALE, WY 82941

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

AD

DR

ES

S1

AD

DR

ES

S2

1.0

TH M

D

M D

RR

/M

D

1 10

RE

V1

RE

V1

DA

TE

RE

V2

RE

V2

DA

TE

RE

V3

RE

V3

DA

TE

RE

V4

RE

V4

DA

TE

RE

V5

RE

V5

DA

TE

1. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS IN THE FIELD PRIOR TO CONSTRUCTION. IF NECESSARY, ADJUSTMENTS TO THE DRAWINGS WILL BE MADE AS DIRECTED BY THE ENGINEER.

2. TOPOGRAPHY SHOWN ON THE DRAWINGS IS BASED ON PHOTOGRAMMETRY AND GROUND SURVEY DATA. GROUND SURVEY WORK WAS PERFORMED IN AUGUST 2020 BY JACKOLA ENGINEERING AND

ARCHITECTURE PC USING SURVEY GRADE GPS. PHOTOGRAMMETRY WAS PERFORMED BY RIVER DESIGN GROUP, INC. IN OCTOBER 2019 USING AN UNMANNED AIRCRAFT SYSTEM.

3. UTILITIES IDENTIFIED ON THE DRAWINGS ARE APPROXIMATE AND DO NOT REPRESENT ABSOLUTE HORIZONTAL AND VERTICAL LOCATIONS. THE CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITY

LOCATE SERVICE PRIOR TO CONSTRUCTION TO IDENTIFY UTILITY LOCATIONS.

4. THE OWNER WILL PROVIDE COPIES OF APPLICABLE PERMITS REQUIRED TO PERFORM THE WORK PRIOR TO THE START OF CONSTRUCTION.

5. THE CONTRACTOR SHALL COMPLY WITH ALL SAFETY REQUIREMENTS DESCRIBED IN THE CONTRACT DOCUMENTS.

6. THE CONTRACTOR SHALL PROTECT ALL LAND AREAS NOT LOCATED WITHIN THE PROJECT CONSTRUCTION, STAGING OR CONSTRUCTION LIMITS. EXERCISE CARE IN AREAS NOT MARKED TO AVOID DAMAGE TO

EXISTING VEGETATION.

7. THE ENGINEER WILL PROVIDE SURVEY CONTROL AND GRADING SURFACES FOR EQUIPMENT WITH GPS MACHINE CONTROL CAPABILITY. THE CONTRACTOR SHALL PROVIDE SURVEY STAKING AND LAYOUT FOR

CONSTRUCTION.

8. VERTICAL TOLERANCE FOR CONSTRUCTION COMPLIANCE WILL BE 0.3 FEET. HORIZONTAL TOLERANCE WILL BE 1.0 FEET.

9. THE CONTRACTOR SHALL CONFIRM QUANTITIES SHOWN ON THE DRAWINGS AND FOR OWNER-SUPPLIED MATERIALS.

10.EARTHWORK QUANTITIES REPORTED ON THE DRAWINGS ARE NEAT LINE QUANTITIES CALCULATED FROM THE DIFFERENCE BETWEEN THE FINISHED GROUND SURFACE AND EXISTING GROUND SURFACE.

11. THE VOLUME OF MATERIAL REQUIRED FOR FILL SURFACES MAY VARY DEPENDING ON COMPACTION AND MOISTURE CONTENT.

12.EARTHWORK QUANTITIES DO NOT INCLUDE SUBGRADE EXCAVATION QUANTITIES UNLESS NOTED OTHERWISE.

13. SLOPES DESIGNATED AS 2:1, 1.5:1, ETC., ARE THE RATIOS OF HORIZONTAL DISTANCE TO VERTICAL DISTANCE.

14.DIMENSIONS ARE GIVEN IN FEET AND TENTHS OF A FOOT.

15.EXCAVATION, TRENCHING, SHORING, AND SHIELDING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING THE WORK, THESE DRAWINGS ARE NOT INTENDED TO PROVIDE MEANS OR METHODS OF

CONSTRUCTION.

GENERAL NOTES

M

16954Pro fessionalEngineer

AT

HEW S D

M

AN

W Y O NI G

S

ELIT

CO

V

ER

P

A G

E W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

6/ 4/

PROJECT DESIGNER

RIVER DESIGN GROUP, INC.

236 WISCONSIN AVE

WHITEFISH, MT 59937

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00 9+83

0+00

1+00 2+00

3+00

4+00

5+00

6+00

6+62

EXISTING CONDITIONS

WILDCAT CANYON DAM IS LOCATED ON AN EPHEMERAL DRAW IN THE BIRD DRAW

WATERSHED. THE SITE CONSISTS OF AN EARTHEN STOCK POND IMPOUNDMENT THAT IS

BEING FLANKED BY AN ADVANCING KNICKPOINT. THE KNICKPOINT HEIGHT IS GREATER THAN

10 FEET HIGH AND IS MIGRATING INTO A WIDE DRAW CHARACTERIZED BY NUMEROUS

SMALL MICRO CHANNELS. CONTINUED ADVANCEMENT OF THE KNICKPOINT WILL RESULT IN

CONCENTRATED RUNOFF AND HIGH SEDIMENT DELIVERY TO DOWNSTREAM AREAS.

SEDIMENT DELIVERY WILL BE EXACERBATED BY EROSION OF THE MATERIAL STORED

UPSTREAM OF THE IMPOUNDMENT AND FROM THE MATERIAL IN THE IMPOUNDMENT.

IMAGERY: RDG HILLSHADE 2019

PLAN VIEW

0' 75' 150'

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

2.0

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

M D

TH

AD

DR

ES

S2

AD

DR

ES

S1

WILDCAT DAM

EXISTING CHANNEL

ALIGNMENT

EXISTING HEADCUT

EXISTING MICROCHANNELS

FLOW

EX

IS

TI

N

G C

O N

D

IT

IO

N

S W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

6/ 4/

EXISTING 18"

CULVERT

EXISTING HEADCUT.

EXISTING 18"

CULVERT

EXISTING 18"

CULVERT

EXISTING 36"

CULVERT

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

IMAGERY: DIGITALGLOBE 2020

PLAN VIEW

0' 600' 1200'

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

3.0

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

M D

TH

AD

DR

ES

S2

AD

DR

ES

S1

LEGEND

STAGING AREA

ACCESS ROAD

GRADING EXTENTS

TURN RIGHT (WEST) ONTO BENEFICIAL OIL ROAD FROM HWY 189.

TRAVEL 2.4 MILES ON BENEFICIAL OIL ROAD, THEN TURN RIGHT (TO THE

NORTH) ONTO AN UNMARKED BLM ROAD.

CONTINUE 0.9 MILES TO PROJECT SITE, LOCATED ON THE RIGHT SIDE (TO

THE EAST) OF THE ROAD.

DIRECTIONS TO PROJECT SITE

A

CC

ES

S

A N

D S

TA

G

IN

G

W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

6/ 4/

BENEFICIAL OIL ROAD

0' 600' 400'

IMAGERY: RDG HILLSHADE 2019

ACCESS AND STAGING DETAIL

PRESERVATION AREA

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

PT #1013

6869.202'

SET RDG

PT #1014

6916.218'

SET RDG

PT #1015

6983.300'

SET RDG

IMAGERY: DIGITALGLOBE 2020

PLAN VIEW

0' 200' 400'

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

3.1

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

M D

TH

AD

DR

ES

S2

AD

DR

ES

S1

THE PROJECT COORDINATES ARE BASED ON THE FOLLOWING:

HORIZONTAL PROJECTION: WYOMING (WEST) STATE PLANE

HORIZONTAL DATUM: NAD83 (12N)

UNITS: US SURVEY FEET

VERTICAL DATUM: NAVD88 (GEOID 12B)

PROJECT DATUM

POINT NUMBER

EASTING

1852205.1890'

1851666.3130'

1850314.2870'

NORTHING

15382259.4610'

15384710.6820'

15387110.2650'

POINT ELEVATION

6869.202'

6916.218'

6983.300'

RAW DESCRIPTION

5/8" REBAR WITH A 2" ALUMINUM CAP MARKED "RDG"

5/8" REBAR WITH A 2" ALUMINUM CAP MARKED "RDG"

5/8" REBAR WITH A 2" ALUMINUM CAP MARKED "RDG"

CONTROL POINT

WILDCAT DAM REMOVAL

GRADING EXTENTS

SU

RV

EY

C

O N

TR

O

L W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

6/ 4/

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00 15+16

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00 9+83

FLOW

IMAGERY: RDG HILLSHADE 2019

PLAN VIEW

0' 75' 150'

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

4.0

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

M D

TH

AD

DR

ES

S2

AD

DR

ES

S1

RESTORATION STRATEGIES AND ACTIONS

THE PURPOSE OF THIS PROJECT IS TO REMOVE AN EARTHEN IMPOUNDMENT AND

RE-GRADE EXISTING INCISED CHANNELS TO RE-ESTABLISH A BROAD DRAW WITH

NUMEROUS STABLE MICRO CHANNELS. REMOVAL OF THE IMPOUNDMENT AND

STORED SEDIMENT WILL REDUCE DOWNSTREAM SEDIMENT DELIVERY. RE-GRADING

THE DRAW AND INCISED CHANNELS WILL REDUCE PEAK FLOWS BY SPREADING OUT

FLOW OVER A GREATER AREA. THE ADVANCING KNICKPOINT WILL BE ELIMINATED

BY FILLING THE INCISED CHANNELS WITH EXCAVATED MATERIAL. SAGE BRUSH WILL

BE SALVAGED DURING EXCAVATION AND USED FOR FLOODPLAIN ROUGHNESS TO

TEMPORARILY STABILIZE RE-GRADED SURFACES.

ROUGHNESS TREATMENT

LEGEND

DESIGN GRADING

STAGING AREA

ACCESS ROAD

SI

TE

P

LA

N W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

6/ 4/

EXISTING 18"

CULVERT

EXISTING 18"

CULVERT

EXISTING 18"

CULVERT

EXISTING 36"

CULVERT

DESIGN ALIGNMENT

EXISTING KNICKPOINT

EXISTING CHANNEL

ALIGNMENT

WILDCAT DAM

PRESERVATION AREA

MATERIALS AND QUANTITIES 6/

4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00 15+16

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00 9+83

EL

EV

AT

IO

N

STATIONS ALONG ALIGNMENT

6844'

6848'

6852'

6856'

6860'

6864'

6868'

6872'

6+

7+

7+

8+

8+

9+

9+

+0

+5

+0

+5

+0

+5

+0

+5

+0

+5

+0

+1

FLOW

IMAGERY: RDG HILLSHADE 2019

PLAN VIEW

0' 75' 150'

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

4.1

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

M D

TH

6/ 4/

AD

DR

ES

S2

AD

DR

ES

S1

LEGEND

GRADING EXTENTS

CUT

FILL

BASE SURFACE: EXISTING GROUND - 2020 TOPO SURFACE COMPARED TO: FINISHED GRADE-RDG DESIGN

FINISHED GRADE

EXISTING GROUND

LEGEND

EARTHWORK QUANTITIES

STATION 6+50 TO 15+00 2,259 CY

FILL

64,465 CY

CUT

DESIGN PROFILE

G

RA

D

IN

G P

LA

N

A N

D P

RO

FI

LE

W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

EXISTING KNICKPOINT

DESIGN ALIGNMENT

EXISTING CHANNEL

ALIGNMENT

WILDCAT DAM

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

7+50

6868'

6870'

6872'

6868'

6870'

6872'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

8+00

6866'

6868'

6870'

6872'

6866'

6868'

6870'

6872'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

8+50

6864'

6866'

6868'

6870'

6864'

6866'

6868'

6870'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

9+00

6864'

6866'

6868'

6870'

6864'

6866'

6868'

6870'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

9+50

6862'

6864'

6866'

6868'

6870'

6872'

6862'

6864'

6866'

6868'

6870'

6872'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

10+00

6860'

6862'

6864'

6866'

6868'

6860'

6862'

6864'

6866'

6868'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

5.0

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

M D

TH

AD

DR

ES

S2

AD

DR

ES

S1

CR

O

SS

S

EC

TI

O N

S W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

LEGEND

CUTEXISTING GROUND ELEVATION

FINISHED GRADE FILL

6/ 4/

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

AT

IO

N

ALIGNMENT OFFSET STATIONING

10+50

6860'

6862'

6864'

6866'

6868'

6860'

6862'

6864'

6866'

6868'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

11+00

6858'

6860'

6862'

6864'

6866'

6868'

6858'

6860'

6862'

6864'

6866'

6868'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

11+50

6856'

6858'

6860'

6862'

6864'

6866'

6868'

6856'

6858'

6860'

6862'

6864'

6866'

6868'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

12+00

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6868'

6870'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6868'

6870'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

12+50

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6868'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6868'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

-2

-2

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

5.1

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

TH

AD

DR

ES

S2

AD

DR

ES

S1

CR

O

SS

S

EC

TI

O N

S W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

LEGEND

CUTEXISTING GROUND ELEVATION

FINISHED GRADE FILL

M D

6/ 4/

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

AT

IO

N

ALIGNMENT OFFSET STATIONING

13+00

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

13+50

6844'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6868'

6844'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6868'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

14+00

6840'

6842'

6844'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

6840'

6842'

6844'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6862'

6864'

6866'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

-2

-2

-2

-2

-2

EL

EV

AT

IO

N

ALIGNMENT OFFSET STATIONING

14+50

6844'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

6844'

6846'

6848'

6850'

6852'

6854'

6856'

6858'

6860'

0' 10

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'0'-1 0'

-2 0'

-3 0'

-4 0'

-5 0'

-6 0'

-7 0'

-8 0'

-9 0'

-1

-1

-1

-1

-1

-1

-1

-1

-1

-1

-2

-2

-2

-2

-2

-2

-2

-2

AP

PR

O

VE

D B

Y:

AU

TO

CA

D

N

AM

E:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

5.2

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

TH

AD

DR

ES

S2

AD

DR

ES

S1

CR

O

SS

S

EC

TI

O N

S W

IL

DC

AT

D

AM

R

EM

O

VA

L

RI

VE

R

DE

SI

GN

G

RO

U P, IN

C.

LEGEND

CUTEXISTING GROUND ELEVATION

FINISHED GRADE FILL

M D

6/ 4/

6/ 4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

MARK

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

2+00 3+00

4+00 5+00

6+00 7+00

8+00 9+00

10+00 11+00

12+00 13+00

14+00 15+00 15+16

PLAN VIEW

0' 150' 300'

ROUGHNESS TREATMENT

AND SEEDING

LEGEND

DESIGN ALIGNMENT

WILDCAT DAM

SEEDING

ROUGHNESS ELEMENTS* 3-5 436/ACREYES 10 FT 50%

ITEM LENGTH (FT) LIMBS SPACING BURIAL RATE

ROUGHNESS PLACEMENT CRITERIA

CONSTRUCT ROUGHNESS TREATMENTS AFTER GRADING IS COMPLETE.

GRADE FURROWS AND RIDGES (1 FT DEEP AND TALL, RESPECTIVELY) INTO THE FINISHED GROUND SURFACE.

PARTIALLY BURY ROUGHNESS ELEMENTS INTO FURROWS AND RIDGES AT SPACING OF 10 FEET WITH 50% BURIAL.

ROUGHNESS CONSTRUCTION NOTES

SAGE BRUSH PLACEMENT

FURROW

RIDGE

TYPICAL CROSS SECTION

ROUGHNESS TREATMENT DETAIL

NATIVE MATERIAL

1 FT

PLAN VIEW

ROUGHNESS TREATMENT DETAIL

RIDGE

FURROW 2

*ROUGHNESS ELEMENTS SHALL CONSIST OF SALVAGED OR IMPORTED SAGE

BRUSH, WHICH MAY BE SUBSTITUTED WITH SALVAGED BOULDERS (0.5 FT OR

GREATER IN DIAMETER).

AP

PR

O

VE

D B

Y:

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

CH

EC

KE

D

B Y:

D

ES

IG

N

O

FF

IC

E:

D

AT

E:

D

AT

E:

D

AT

E:

D

AT

E:

FURROW 2 RIDGE 2

CONTOURS = 0.5'

RIDGE 2 FURROW 2

SAGE BRUSH

SAGE BRUSH

3 BOULDER

3 BOULDER

1 FT

BOULDER PLACEMENT

RIDGE2

RE

CL

A M

A

TI

O N

P

LA

N

RI

VE

R

DE

SI

GN

G

RO

U

P, IN

C.

10 FT

10 FT

DESIGN SURFACE

THE GOAL OF THE RECLAMATION PLAN IS TO CREATE A SELF-SUSTAINING AND DIVERSE NATIVE PLANT COMMUNITY. THIS PLANT COMMUNITY WILL HAVE DENSITY AND COVER SUFFICIENT TO CONTROL EROSION, LIMIT NON-NATIVE PLANT INVASION, AND RE-ESTABLISH WILDLIFE HABITAT AND FORAGE PRODUCTION. THE FOLLOWING SUITE OF TREATMENTS WILL PROMOTE THE SHORT- AND LONG-TERM STABILITY OF THE PROJECT AREA. THE ROUGHNESS TREATMENTS PROVIDE IMMEDIATE EROSION PROTECTION FROM SURFACE WATER FLOW, WHILE THE REVEGETATION PROMOTES LONG-TERM GEOMORPHIC STABILITY AND ECOLOGICAL RECOVERY.

RECLAMATION DESCRIPTION

· SEED MIX MUST BE SUBMITTED FOR REVIEW AND APPROVED BY THE ENGINEER.

· BROADCAST SEEDING SHOULD BE USED TO DISTRIBUTE SEEDS EVENLY THROUGHOUT THE SITE.

· IMPLEMENT SEEDING AFTER ROUGHNESS TREATMENT CONSTRUCTION.

SEEDING NOTES

RE

V5

DA

TE

RE

V5

RE

V4

DA

TE

RE

V4

RE

V3

DA

TE

RE

V3

RE

V2

DA

TE

RE

V2

RE

V1

DA

TE

RE

V1

RR

/M

D

M D

M D

TH

6.0

AD

DR

ES

S2

AD

DR

ES

S1

8'4'0'

3'1.5'0'

6/ 4/

W

IL

DC

AT

D

AM

R

EM

O

VA

L 6/

4/

6/ 4/

6/ 4/

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

SHEET

1.0 Cover Page
Sheets and Views
11x17
2.0 Existing Conditions
Sheets and Views
11x17
3.0 Access and Staging
Sheets and Views
11x17
3.1 Survey Control
Sheets and Views
11x17
4.0 Site Plan
Sheets and Views
11x17
4.1 Grading Plan and Profile
Sheets and Views
11x17
5.0 Cross Sections
Sheets and Views
11x17
5.1 Cross Sections
Sheets and Views
11x17
5.2 Cross Sections
Sheets and Views
11x17
6.0 Reclamation Plan
Sheets and Views
11x17

File details come from the government source that posted it. Updated .