B08_-_140L0623Q0033_Wellfield_CP_Q_A_0001.docx

DOCX document 15 KB Posted

Attached to
BLM Wellfield Cathodic Inspection
Solicitation number
140L0623Q0033
Issued by

About this file

This document contains questions and answers regarding Solicitation 140L0623Q0033 from the Bureau of Land Management for wellfield cathodic inspection services. The solicitation has a small business set aside and covers inspection of approximately 25 test stations, 2 critical bonds, 5 rectifiers, 2 rheostat junction boxes, 5 anode beds, and 5 planned watchdog communication systems. The BLM will provide locations of these items and other inspection points including 20.7 miles of pipeline, 19 well cellars, and 45 drip stations in a kmz file. Inspection will include bimonthly readings and annual readings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLM Solicitation 140L0623Q0033 Wellfield CP Q&A

Q1) The Statement of Work states that the BLM is in the process of installing Watchdog monitoring communication systems. Does the BLM anticipate having these installed by the beginning of the period of performance? Also, do you know if these will have interruption capabilities?

A1) The RMUs are on back order with ETA of mid-December. Yes, they will have interruptions capabilities.

Q2) Does the government know the number of existing test stations and critical bonds?

A2) There is approximately 25 test stations and 2 critical bonds.

Q3) I see that this solicitation has a small business set aside. We are currently working on our final steps for our 8A. Our company currently has the Woman Owned Small Business (WOSB) certification. Would this certification meet the requirement for the small business set aside?

Answer: Yes, the small business set-aside covers all small business concerns.

Q4) To properly quote the pricing for bimonthly readings and annual readings we would need clarification on the items listed below:

a. Total number of Rectifiers and rheostat junction boxes.

a) 5 rectifiers and 2 rheostat junction boxes.

b. Total number of test points and critical bond locations.

a) There are approximately 25 test stations and 2 critical bonds.

c. Total number of anode beds.

a) 5

d. Total number of watchdog communications systems.

a) The BLM will be installing 5.

e. Total number of any additional items which would need to be surveyed.

a) 20.7 miles of pipeline, 19 well cellars, 45 drip stations.

f. In which form will BLM provide locations for all the items listed above, so that the inspector may find each item.

a) The BLM can provide a kmz with the rectifier and anode bed locations.