BUREAU OF LAND MANAGEMENT
National Operations Center Building 50, Denver Federal Center
P.O. Box 2547 https://www.blm.gov
140L0622Q0043 Three Rivers ADA Trail Questions and Answers
Access for concrete trucks.
o There is a two track that can be cleaned to access the other side of the bridge. This is not very far up the trail so other work measures may be better planned.
o The delivery and time in truck should be considered in planning, along with unscheduled train delays. (The contractor and archeologist were delayed by the train for 30 minutes)
Trail closures o During construction work with the CO/COR to schedule trail closures to notify public.
Protect in place boulders around look out.
o Yes, there are artifacts on the rocks at the look out.
At the driveway culvert replacement maybe arch for shallower cover requirements.
Pit houses are protected in place.
Site road closure for culvert replacement?
o Need to schedule with CO/COR.
o Best day of week is Wednesday when site host is not working.
What is to be done with rock on edge of trail?
o Specifications pg. 5 requirements are to stockpile and restore rock edging along existing trails.