Attachment 3 - Questions and Answers_0001.pdf

PDF 59 KB Posted

Attached to
Jupiter Lighthouse Office Flooring
Solicitation number
140L0621Q0042
Issued by

View the file

Other files

File Type Posted
Sol_140L0621Q0042_Amd_0002.pdf PDF
Sol_140L0621Q0042_Amd_0001.pdf PDF
Sol_140L0621Q0042.pdf PDF
Attachment 2 - Wage Determination.pdf PDF
Attachment 1 - Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L0621Q0042 Page 1 of 1 Attachment 3

Jupiter Lighthouse Office Flooring

Contractor Q&A

4/21/2021

1. Is the removal and reinstallation of millwork (baseboard) a requirement, if so Is the contractor to utilize existing baseboard or fabricate/paint and install new base board?

Answer: No baseboards removal is not a requirement. Care should be taken in the removal of the tile so not to damage baseboards.

2. Is the contractor required to install any floor transitions were the new terrazzo will meet any elevated floor surfaces?

Answer: Yes, transition (thresholds) are required between the restored terrazzo flooring and existing carpet and tile in the offices and bathroom.

3. Is the contractor required to move any furniture or is this the purchasers responsibility?

Answer: No, furniture will be moved by Office staff.

4. What type of terrazzo is required?

Answer: The existing terrazzo floor is to be restored after the tile, which has been placed on top of it, is removed. Work may require minor terrazzo repair, and will require polishing and sealing.