B08_Attach_4_Pricing_Worksheet_0002.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Meadowood Thrush Loop Trail Culvert Replacement Federal contract opportunity
Solicitation number
140L0123Q0029
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document contains a pricing worksheet for the Meadowood Thrush Loop Trail Culvert Replacement federal contract opportunity. The worksheet includes line items for mobilization, tree trimming and removal, erosion protection, demolition, installation, earthwork, rip rap, demobilization, and other costs. It lists the related solicitation as number 140L0123Q0029 from the Department of the Interior Bureau of Land Management National Office for culvert replacement work along the Meadowood Thrush Loop Trail. Cost and duration estimates are required for each work item in the pricing worksheet to be submitted in response to the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Meadowood Thrush Loop Trail Culvert Replacement, newest first.
File Type Posted
B08_Attach_3_WD_VA20220116_0002.pdf PDF
B08_Attach_2_Plans_0002.pdf PDF
B08_Attach_1__SOW_0002.pdf PDF
Sol_140L0123Q0029_Amd_0002.pdf PDF
B09_1442_Continuation_Documents-Revised_18July2023_0001.pdf PDF
Sol_140L0123Q0029_Amd_0001.pdf PDF
B09_Attach_5_Site_Visit_Sign-in_Sheet_0001.pdf PDF
Sol_140L0123Q0029.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Woodthrush Culvert Replacement

WorkCostDuration (Days)
MobilizationLumpsum
Tree Trim and RemovalLumpsum
Erosion ProtectionLumpsum
DemolitionLumpsum
InstallationLumpsum
EarthworkLumpsum
Rip RapLumpsum
DemobilizationLumpsum
OtherLumpsum
Total

File details come from the government source that posted it. Updated .