RIO GRANDE SEDIMENT SAMPLING & GAGE MAINTENANCE
Solicitation number
140G0323Q0122
Issued by

View the file

Other files

File Type Posted
140G0323Q0122-01_QandA_document_0001.docx DOCX document
USGS_Solicitation_No__140G0323Q0122_0001.pdf PDF
Sol_140G0323Q0122_Amd_0001.pdf PDF
140G0323Q0122_SOW.pdf PDF
140G0323Q0122_Clauses.pdf PDF
FAR_52_204-24_and_26.pdf PDF
Sol_140G0323Q0122.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 140G0323Q0122, Task Order 1 SOW

Task Order 1 – Statement of Work

Project Element 1: Sediment Sampling and Sediment Gage Maintenance.

For Task Order 1, the scope of work for site maintenance would consist of 12 trips, which includes 6 trips to the Castolon/Terlingua Creek sites, and 6 trips to the Rio Grande Village and Tornillo Creek sites.

A minimum of 5 samples must be collected at each site in calendar year 2023.

Project Element 2: Topographic Surveys of the Channel and Floodplain.

This is not required for Task Order 1.

Deliverables:

In calendar year 2023, maintenance trips are required to two different sets of gages 6x per year = 12 trips.

The scope of work for calendar year 2023 will include the collection of 5 suspended sediment samples at two different gages per year = 10 sampling trips.

100 bottles associated with the 5 samples at each site (10 bottles/sample).

Period of Performance:

June 1, 2023 – December 31, 2023

Place of Performance:

Rio Grande Village, Terlingua Creek, Tornillo Creek, Castolon, Big Bend National Park.