140G0323Q0122-01_QandA_document_0001.docx

DOCX document 14 KB Posted

Attached to
RIO GRANDE SEDIMENT SAMPLING & GAGE MAINTENANCE Federal contract opportunity
Solicitation number
140G0323Q0122
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

Other files for this federal contract opportunity

Other files attached to RIO GRANDE SEDIMENT SAMPLING & GAGE MAINTENANCE, newest first.
File Type Posted
USGS_Solicitation_No__140G0323Q0122_0001.pdf PDF
Sol_140G0323Q0122_Amd_0001.pdf PDF
140G0323Q0122_Clauses.pdf PDF
Sol_140G0323Q0122.pdf PDF
140G0323Q0122_Task_Order_1_SOW.pdf PDF
140G0323Q0122_SOW.pdf PDF
FAR_52_204-24_and_26.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. In order to quote Project Element 2: Topographic Surveys of the Channel and Floodplain, I need to know if this is a continuation of the surveying done in the past, namely - does this require surveying the 68 previously established cross sections in the Castolon, Solis, and Gravel Pit to Hot Springs Canyon reaches.

If additional creek mouth surveys, etc are required then I need specific locations and geographic extents of these surveys in order to generate a proper quote.

The surveys would be the 68 previously established cross sections in the Castolon, Solis, and Gravel Pit to Hot Springs reaches.

2. Please clarify if the following price structure is appropriate, and expected, for each Project Element:

Project Element 1 - Sediment Sampling and Sediment Gage Maintenance:

Up to 24 trips: 12 trips to the Castolon/Terlingua Creek sites, and 12 trips to the Rio Grande Village and Tornillo Creek sites, for a total of 24 trips.

Firm, Fixed Price per trip = $_______ or Not To Exceed value for full scope of work, i.e:

Year 1 NTE: $ Year 2 NTE: $_______, etc.

A firm, fixed price per trip is preferred. Then, as additional task orders are created, the total amount of money for the contractor can be easily adjusted based on the firm/fixed prices.

Project Element 2 - Topographic Surveys of the Channel and Floodplain:

Firm, Fixed Price per survey =$______ or Not To Exceed value for full scope of work, i.e:

Year 1 NTE: $ Year 2 NTE: $_______, etc.

A firm, fixed price per trip is preferred. Then, as additional task orders are created, the total amount of money for the contractor can be easily adjusted based on the firm/fixed prices.