This document is Standard Form 30 (Amendment of Solicitation/Modification of Contract) dated July 24, 2026, issued by the USGS OAG Reston Acquisition Branch for solicitation 140G0126Q0222. The amendment extends the deadline for receipt of offers and includes Questions and Answers clarifications regarding a monitoring well abandonment project in Easton, Maryland.
The contract involves monitoring well abandonment services with specific technical requirements for casing configuration and grouting procedures. Key clarifications provided address: the 2-inch PVC casing begins at 61 feet below ground surface with a reducing connection and extends to 361 feet; contractors must break through a bridge near 60 feet and grout by tremie from 371 to 205 feet, followed by overdrilling from 205 to 60 feet; investigation-derived waste may be temporarily staged at the site; standard Maryland waste disposal standards apply without requirement for pre-disposal sampling; contractors may select any properly licensed disposal company; and overdrilling to 60 feet is required to remove casing and hydraulically conductive material for a complete seal above the clay confining unit, with traditional sealing requested for the remaining 6-inch PVC casing from 60 feet to land surface. The technical specifications and sealing methods are defined by regulatory objective. Inquiries should be directed to Susan Ruggles at sruggles@usgs.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140G0126Q0222.pdf | ||
| Attachment_3_-_Site_Location.pdf | ||
| Attachment_2_-_WD_2015-4275_Rev_32.pdf | ||
| Attachment_1_-_PWS_and_Photos.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Daniel Galvin
See continuation page
USGS OAG RESTON ACQUISITION BRANCH
205 NATIONAL CENTER
12201 SUNRISE VALLEY DRIVE
RESTON VA 20192
GRB
140G0126Q0222
07/24/2026
07/24/2026
1 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140G0126Q0222/0001
MONITORING WELL ABANDONMENT, EASTON MD
140G0126Q0222 Amendment 1: Questions & Answers
Question 1. Does the 2-inch PVC casing begin at approximately 61 feet below ground surface through a 6-inch-to-2-inch reducer, or does the
2-inch casing extend to the surface?
Answer 1. 2-inch PVC begins at 61' below ground surface with a reducing connection.
Q2. Please confirm the total depth and configuration of the 2-inch PVC casing.
A2. 2-in PVC extends from 61-feet to 361-feet below ground surface.
Q3. At the bridge near 60 feet below ground surface, should the contractor clear or drill through the bridge to place the tremie pipe and grout from 371 feet to 205 feet, followed by overdrilling from 205 feet to 60 feet? Or should the contractor drill to 371 feet and grout the entire borehole?
A3. Break through the bridge and grout by tremie from 371 to 205-feet, followed by overdrilling from 205 up to 60-feet with tremie from 205 to surface.
Q4. May drums containing investigation-derived waste be temporarily staged at the well site until disposal?
A4. Yes.
Q5. Is sampling or laboratory testing of the waste required before disposal?
A5. Standard waste disposal standards for
Maryland applies, this was an observation well for a drinking aquifer.
Q6. Is there a specific waste hauler the contractor must use, or may the contractor select a properly licensed disposal company?
A6. No, the contractor may select a properly licensed disposal company
Q7. What is the technical basis for requiring overdrilling to 60 feet specifically, rather than sealing directly against the existing
2-inch casing over that interval?
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140G0126Q0222/0001
A7. The technical basis for overdrilling the well below 60' is to remove the casing and any hydraulicly conductive material entirely from
60' down to 205' for a complete seal above the clay confining unit. The remaining casing from
60' to land surface is 6" PVC and traditional sealing is requested for this interval.
Q8. Was this depth determined by MDE, the
Talbot County Health Department, or USGS, and is there flexibility to propose an alternative sealing method that achieves the same regulatory objective?
A8. The depth was defined by regulatory objective as detailed above.
For questions, contact Susan Ruggles, sruggles@usgs.gov
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |