B08_ATCH_1_SOW_0001.pdf

PDF 83 KB Posted

Attached to
SOS Tube IAW SOW, Workmanship, & Drawings
Solicitation number
140G0125Q0173
Issued by

About this file

This Statement of Work (SOW) details requirements for fabricating Standard Orifice Static Tubes for the U.S. Geological Survey (USGS). The units must be manufactured in strict accordance with USGS drawing numbers 0375001-0375012 and specification HIFW-01. Packaging specifications mandate that each tube be individually boxed in a cardboard container with appropriate packing material to prevent shipping damage, and each box must have Government-supplied bar code labels affixed to the outside end, which will be provided after contract award.

View the file

Other files

File Type Posted
B08_ATCH_2_WORKMANSHIP_0001.pdf PDF
B08_ATCH_3_DRAWINGS_0001.pdf PDF
Sol_140G0125Q0173_Amd_0001.pdf PDF
Sol_140G0125Q0173.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement Of Work – Standard Orifice Static Tube

Requirements

Units shall be fabricated in accordance with USGS drawing number 0375001-0375012 and specification HIF-

W-01.

Packaging/Marking

Each unit shall be individually boxed in a cardboard box with proper packing material to ensure no damage occurs during shipment. The vendor shall affix the Government supplied bar code labels to the outside end of each box. Government bar code labels will be supplied following contract award.

File details come from the government source that posted it. Updated .