B08_ATCH_1_SOW_0001.pdf
PDF 83 KB Posted
- Attached to
- SOS Tube IAW SOW, Workmanship, & Drawings
- Solicitation number
- 140G0125Q0173
About this file
This Statement of Work (SOW) details requirements for fabricating Standard Orifice Static Tubes for the U.S. Geological Survey (USGS). The units must be manufactured in strict accordance with USGS drawing numbers 0375001-0375012 and specification HIFW-01. Packaging specifications mandate that each tube be individually boxed in a cardboard container with appropriate packing material to prevent shipping damage, and each box must have Government-supplied bar code labels affixed to the outside end, which will be provided after contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_ATCH_2_WORKMANSHIP_0001.pdf | ||
| B08_ATCH_3_DRAWINGS_0001.pdf | ||
| Sol_140G0125Q0173_Amd_0001.pdf | ||
| Sol_140G0125Q0173.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement Of Work – Standard Orifice Static Tube
Requirements
Units shall be fabricated in accordance with USGS drawing number 0375001-0375012 and specification HIF-
W-01.
Packaging/Marking
Each unit shall be individually boxed in a cardboard box with proper packing material to ensure no damage occurs during shipment. The vendor shall affix the Government supplied bar code labels to the outside end of each box. Government bar code labels will be supplied following contract award.
File details come from the government source that posted it. Updated .