This document is a set of Questions and Answers (Q&A) related to Amendment 002 for Solicitation 140G0124Q0183 for the removal and replacement of a walk-in cooler at the USGS Eastern Ecological Science Center (EESC) Fish Health Lab (FHL).
The key details are:
- The solicitation requires only the floor to be stainless steel, while the walls and ceiling can have a stucco embossed finish.
- No additional electrical outlets are required as the USGS will remove and reconnect the existing outlets.
- The usable height above the unit is approximately 45 inches from the bottom of the concrete trusses.
- This is a 100% Small Business set-aside solicitation with a NAICS code of 238210 and a size standard of $19 million. Quotes are due by 6/24/2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140G0124Q0183_Amd_0002.pdf | ||
| B09_Attachment_3_Q___A_Amd_001_0001.docx | DOCX document | |
| Sol_140G0124Q0183_Amd_0001.pdf | ||
| B08_Attachment_2_WD_WV20240037.pdf | ||
| Sol_140G0124Q0183.pdf | ||
| B08_Attachment_1_Existing_Site_Conditions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140G0124Q0183 Amendment 002 Q&A
1. I was out at the site visit last week, I had asked if they wanted a stainless-steel finish on the inside and was told yes. Reading over the SOW is shows they just want the floor to be stainless steel while the walls and ceiling are stucco embossed. Could I get confirmation on if they full internal needed to be stainless steel or is it just the floor.
a. Just the floor.
2. Do they want 3 prong outlets inside and out of the box like the ones that are currently there?
a. No plugs required. USGS will remove existing plugs outside of the box and reconnect.
3. Additionally, if I could get the usable height above the unit, the distance from the top of the ceiling to the bottom of the rafters would be perfect. I want to make sure the cooling units have enough room to be installed and ventilate properly.
a. The measurement is about 45 inches to bottom of concrete trusses.
File details come from the government source that posted it. Updated .