Attachment_A_Instructions_to_Vendors_and_SOW_Updated_0001.pdf

PDF 1 MB Posted

Attached to
The USGS Reston Radiochemistry Laboratory Decommis Federal contract opportunity
Solicitation number
140G0123Q0208
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This is a request for quotation for decommissioning and surveying services at the US Geological Survey Reston Radiochemistry Laboratory in Reston, Virginia. The selected contractor will be required to develop a final status survey plan within 10 business days of award and complete decommissioning and MARSSIM surveys within 15 days thereafter. The contractor must have applicable NRC or Agreement State licenses and employ certified personnel. Pricing will be evaluated using the best value tradeoff method based on technical approach, past performance, and time and materials pricing through a 90-day period of performance. Quotes are due by 2:00PM EST on August 8, 2023. The opportunity is designated as full and open competition.

View the file

Other files for this federal contract opportunity

Other files attached to The USGS Reston Radiochemistry Laboratory Decommis, newest first.
File Type Posted
1B307_-_Inventory_of_samples_standards_and_wastes_5-31-2023_0001.xlsx XLSX spreadsheet
List_of_Matrices_and_Additional_Information_0001.pdf PDF
Questions_and_Answers_Radiochem_Lab_Decommissioning_0001.pdf PDF
Sol_140G0123Q0208_Amd_0001.pdf PDF
Samples_Cabinet_0001.pdf PDF
Standards_Cabinet_0001.pdf PDF
Radon_Generators_0001.pdf PDF
Attachment_B_-_Site_Visit_Security_Document.docx DOCX document
Attachment_A_Instructions_to_Vendors_and_SOW.pdf PDF
Sol_140G0123Q0208.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

Document No.

140G0123Q0208

Document Title Reston Radiochemistry Laboratory

Decommissioning

INSTRUCTION TO VENDORS

A discounted Open Market Time & Materials (T&M) priced quotation and technical quotation package shall be submitted by 2:00 PM EST, Tuesday, August 8, 2023. This will be Full and Open

Competition. The Quotations shall be submitted to the Contracting Officer at ndemby@usgs.gov. Faxed or mailed quotations will not be accepted. Vendors shall supply the USGS with a thorough quotation package demonstrating how they meet all requirements within the Statement of Work (SO). Quotation packages shall be thorough enough to allow the USGS to perform a proper evaluation.

The following additional information must be supplied along with your quotation. Failure to submit this information may deem your quotation non-responsive and your quotation may not be considered.

1) Vendor must submit a quotation which will be reviewed by the Contracting Officer and the

USGS Technical Evaluation Committee (TEC). The quotation must reflect all the technical specifications as attached in the Request For Quote (RFQ).

2) Breakdown of the total time-and-materials pricing for the Period of Performance

Period Pricing Period of Performance (POP): Date of Award through 90 days

*Please make sure to include Labor Categories, Hourly Rates, and Miscellaneous

Expenses* (If Applicable)

3) Business Size Classification.

4) UEI Number.

5) Federal Tax ID Number.

Site Visit Details:

Date: 07/26/2023

Time: 10:00 AM Eastern Time

Location: U.S. Geological Survey

12201 Sunrise Valley Drive

Reston, VA 20192

All entering MUST be US Citizens and have a valid Government-issued identification to enter the building. Please arrive at the Visitor’s Lobby at the prescribed time only.

Vendors must provide the attached completed security document (located in Attachment

B) and a business license copy prior to the site visit.

All vendors interested in attending the site visit shall send a confirmation email to:

Nicole Demby: ndemby@usgs.gov

Site Visit confirmation email shall include:

mailto:ndemby@usgs.gov

140G0123Q0208

Document Title

-Company Name

-Number and Names of Attendees

-Attachment 1: Completed Security Document

-Attachment 2: Copy of Business License

*Prime contractor is responsible for ensuring all subcontractors are present during the site visit*.

The award resulting from this RFQ will be based on the Best Value quotation utilizing Trade-Off procedures. The evaluation criteria for this RFQ in order of importance are as follows:

Technical Approach (Pass/Fail): Experience of Offeror performing work similar to that presented in the

Performance Based Work Statement. The offeror must demonstrate it possesses the necessary organizational experience, and technical skills, quality assurance measures, applicable to the services to be performed by the prospective contractor.

Past Performance (Pass/Fail): Past Performance (FAR 42.1501 General): The Offeror shall submit references from three (3) customers that have contracted for similar services as those described in the

Performance Based Work Statement within the last three years. Offerors shall provide a point of contact name, phone number, email address and company address for those references. Statements by references may be used in the evaluation of the Offeror’s technical quote under any and all applicable evaluation criteria. Any information obtained by the Government from references outside the Offeror’s quote may be used in a similar manner. All past performance information will be used for both the responsibility determination and the best value decision.

Price: Pricing will be determined fair and reasonable based on the requirements set forth within the

Performance Work Statement (PWS).

All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.

*Remember the USGS is requiring a Time & Materials quotation.

All questions shall be submitted via email to ndemby@usgs.gov no later than 12:00 PM EST, Monday, July 31, 2023. Late questions will not be accepted.

(End Instructions to Vendors)

PERFORMANCE-BASED WORK STATEMENT

I. GENERAL INFORMATION

A. Services, non-personal, to provide all equipment, labor, travel, and materials (unless otherwise provided herein) necessary for a service agreement for on-site surveying and decommissioning of the Reston Radiochemistry Laboratory (1B307, 1B307A, 1B307B, 1B307C) and Inorganic

Geochemistry Laboratory (1B309), John Wesley Powell Federal Building, Water Mission Area, mailto:ndemby@usgs.gov

140G0123Q0208

Document Title

Project Laboratories Branch, Reston, VA 20192 (Figure 1). The contractor shall perform all activities in accordance with all Federal, state, and local laws, statutes, regulations, and codes.

B. The Reston Radiochemistry Laboratory and Inorganic Geochemistry Laboratory processed and analyzed various radiological isotopes in the John Wesley Powell Federal

Building (JWPFB). The USGS is required to clean all areas where radiological materials were used or stored before returning the laboratories back to general use. These laboratories are being remodeled and repurposed for other than radiological uses and shall be surveyed in accordance with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) decommissioning surveys. MARSSIM was developed to ensure surveys are conducted with the proper rigor, quality assurance, and statistical analysis to make proper decisions.

The working hypothesis of MARSSIM is that all impacted areas being evaluated for release have a reasonable potential for radioactive contamination above the derived concentration guideline levels (DCGL). This initial assumption means that all areas are initially considered Class 1 areas unless some basis for reclassification as non-impacted, Class 3, or

Class 2 is provided.

• Class 1 areas are areas that have, or had prior to remediation, a potential for radioactive contamination (based on site operating history) or known contamination (based on previous radiological surveys).

• Class 2 areas are areas that have, or had prior to remediation, a potential for radioactive contamination or known contamination, but are not expected to exceed the DCGLw.

• Class 3 areas are any impacted areas that are not expected to contain any residual radioactivity or are expected to contain levels of residual radioactivity at a small fraction of the DCGLw, based on site operating history and previous radiological surveys.

Per the USGS Radioisotope license 05-01399-08, Attachment 10.6b REV 2, the following

Guidelines for Deactivating a Radioisotope Utilization Permit shall be followed.

For areas to be released to unrestricted use, contaminated facilities and equipment must be disposed of as radioactive waste, transferred to another authorized storage/use location, or decontaminated to unrestricted release levels in accordance with the guidance in

Consolidated Decommissioning Guidance: Decommissioning Process for Materials

Licensees (NUREG-1757, Volume 1, Revision 2) Appendix B Screening Values. If necessary, site-specific screening values will be developed in accordance with NRC guidance and approved by the NRC prior to release.

The Reston Radiochemistry Laboratory (1B307, 1B307A, 1B307B, 1B307C) and

Inorganic.

Geochemistry Laboratory (1B309) are known to have contained or used radiological materials and shall be surveyed as the appropriate survey units based on historical records

(See Figure 5). The rationale for selecting the survey units shall be developed using the

Data Quality Objectives Process and be fully documented (MARSSIM Section 4.6).

Known Radiological Contaminants of Concern include:

140G0123Q0208

Document Title

Ra-226 Radium

Ra-228 Radium

Ra-223 Radium

Ra-224 Radium

Rn-219 Radon

Rn-220 Radon

Rn-222 Radon

Th-229 Thorium

Th-230 Thorium

Th-232 Thorium

U-232 Uranium

U-236 Uranium

U-238 Uranium

U-nat Uranium

Po-209 Polonium

Thorium nitrate Thorium

Uranium acetate Uranium

These materials comprise all of the known radioactive materials used in the labs. The isotopes used possessed low to moderate activity levels. Radioactive material use in each room was location specific, but the entire room(s) shall be surveyed.

Locations associated with radiation use:

In relation to Water Mission Area research activities at the JWPFB, there are five (5) locations where radioisotopes were either used, analyzed, or stored. Such use was restricted to the Reston Radiochemistry Laboratory (1B307, 1B307A, 1B307B and 1B307C) and the

Inorganic Geochemistry Laboratory (1B309) where weighing of isotope-bearing materials occurred. Based on historical knowledge, only minor sample handling spills of low-level radioactive materials occurred in these rooms. All such spills were immediately cleaned up.

All test swipes for these laboratories since 2007 have been below the MDA. A detailed laboratory usage survey has been included (see Appendix 1) which fully describes the research activities in these rooms.

Room 1B307: Radiochemistry Laboratory/Sample Preparation Room

This room (496 sq. ft.) was the primary sample preparation and wet chemistry portion of the laboratory. It also served as a general sample and radioactive materials storage area.

Room 1B307A: Radiochemistry Laboratory/Instrument Room

This room (145 sq. ft.) housed three gamma-ray spectrometers with low-level lead brick shielding, an alpha spectrometer, and spare electronics.

Room 1B307B: Radiochemistry Laboratory/Auxiliary Prep and Analysis Room

140G0123Q0208

Document Title

This small room (80 sq. ft.) has been used for miscellaneous purposes including sample storage, sample dewatering, ashing experiments, and RaDeCC analyses.

1B307C: Radiochemistry Laboratory/Tool and Storage Room

This room (33 sq. ft.) connects 1B307 with 1B307A and 1B307B. Sample storage occurred here.

1B309: Inorganic Geochemistry Laboratory

This room (532 sq. ft.) has been used for various laboratory operations since 1995. From

2011 - 2020, the Reston Radiochemistry Laboratory weighed mill tailing and NIST SRM

4350B (River Sediment Environmental Radioactivity Standard) samples in 1B309. These weighing activities occurred at the balance closest to the door connecting 1B307 and

1B309.

Hallways

All hallways adjacent to the radiological rooms are identified and are part of the survey.

C. Definitions/Applicable Documents (define terms that have a different meaning to different people, esp. technical ones; list publications, directives, commercial standards affecting the work). If definitions are not required for successful performance, skip C and replace with D.

D. Scope: Services to provide all equipment, labor, travel, and materials (unless otherwise provided herein) necessary for on-site surveying and decommissioning of the Reston Radiochemistry

Laboratory (1B307, 1B307A, 1B307B, 1B307C) and Inorganic Geochemistry Laboratory

(1B309).

II. WORK REQUIREMENTS

A. Technical Requirements:

The Contractor is solely responsible for site investigation and verification of actual site conditions. This statement of work outlines the required Contractor qualifications, work to be performed (including applicable standards and acceptance criteria), period of performance and required deliverables.

The Contractor shall possess a current Nuclear Regulatory Commission (NRC) license or have a State License Agreement and the NRC Form 241.

Task 1. The contractor shall provide a Final Status Survey Plan, aka Decommissioning Plan, which meets or exceeds MARSSIM protocols and standards within 10 business days after award for approval.

Task 2. The contractor shall decommission the laboratories by following the approved Final Status

Survey Plan to completion in accordance with MARSSIM protocols and standards within 15 days (three business weeks) after the USGS approves the Final Status Survey Plan.

1. Test the surfaces in the laboratories for radiological contamination in accordance with

MARSSIM protocols.

140G0123Q0208

Document Title

2. Conduct radiological decommissioning in accordance with MARSSIM protocols and based on the survey results, after the order to proceed.

a. Items or equipment surveyed with no detectable radiation above background or minimum detectable activity shall be released from radiological controls to be disposed of by the contractor as non-radioactive waste or free-released material.

b. Items surveyed with detectable contamination levels above background or minimum detectable activity shall be documented and reported to the USGS COR identifying the activity, location, and isotope if known. These items will be disposed of by the contractor in accordance with all Federal, state, and local laws, statutes, regulations, and codes.

c. Large items (e.g., instrumentation) will be surveyed in the following manner. A floor area of sufficient length and width to contain the item shall be surveyed first. Then the item shall be moved to the surveyed area. The vacant area where the item was previously positioned shall be surveyed. The item then shall be moved back to its original position and the floor area where the item was moved to shall be surveyed again. This procedure shall apply to all large items or equipment residing in the room.

d. Areas surveyed with detectable contamination levels above the release criteria, as noted in 10 Code of Federal Regulations (CFR) 20.1402 Radiological Criteria for Unrestricted Use, shall be documented, and reported to the USGS COR identifying the activity, location, and isotope if known.

e. Samples taken for removable contamination shall be counted on a liquid scintillation counter (LSC). There is no Government-furnished equipment associated with this contract. The contractor may use portable tritium counters for samples and then shall use an offsite LSC on a confirmatory basis. 100% of the samples shall be counted.

f. If items or areas are reported above Minimum Detectable Activity or Derived

Concentration Guideline Levels respectively, the contractor shall notify the USGS COR.

g. Radioactive low-level waste generated during the period of performance shall be packaged, labeled, manifested, and shipped by the contractor to the nearest licensed low-level waste disposal facility located in a Nuclear Regulatory Commission Agreement

State. Copies of manifests and export letter(s) shall be provided to the USGS COR.

h. The lowest cost shall be a consideration when selecting the nearest licensed disposal facility.

i. The contractor shall complete the MARSSIM surveys within 15 days (three business weeks) after the USGS Radiation Safety Committee-approved Final Status Survey Plan or

Decommissioning Plan has been received by the contractor.

j. Removable contamination samples shall be counted on a liquid scintillation counter only.

Use of a dual scalier detector such as a Ludlum 3030 or 2929 or equivalent are not allowed.

140G0123Q0208

Document Title

k. Other areas that are “non-radiological” are available for collection of background data.

Possible areas include nearby offices, a conference room, and other “non-radiological” labs.

Access to these areas can be gained by contacting the Reston Project Laboratories Branch

Supervisory Scientist.

l. The suspended ceilings have been in place since lab operations began and the ceilings have not been removed. From a review of operations and history of use in the rooms, it is reasonably expected that ceiling tiles are free of contamination. There is no requirement for the contractor to survey the ceiling tiles. If the contractor recommends that additional surveys of the ceiling be conducted, the USGS Radiation Safety Committee will take that into account for future work.

m. All walls shall be surveyed to a height of 10 feet.

Task 3. Miscellaneous Items.

1. Historical Site Assessment: Records are available for review and the USGS Physical Science

Technician who performed all laboratory procedures during the operational life of the laboratory is available for interviews during the period of performance. Justification can be provided for class survey unit designations. A historical usage survey for the laboratory has been provided (see

Appendix 1).

2. Interior and hallway floor drains and sinks shall be assessed as to the need to be surveyed. With the exception of a minor low-level, radioactive, sample-water discharge approved by Fairfax County

(October 2012), no radioactive material has been deposited down the drains.

3. Ventilation systems, except fume hoods, should not be required to be surveyed.

4. Contractor equipment can be stored in the building as the building will be secured after hours.

Only a select group of individuals have access to the buildings after-hours.

5. The Contractor shall dispose of any radioactive or contaminated survey media and personal protective equipment used or generated during the survey. The contractor shall provide disposal under their own disposal permits. The USGS does not maintain active LLRW disposal site use permits.

6. A radiation technician may collect the surveys provided a certified health physicist oversees the

MARSSIM survey. This allows the contractor to use lower-tiered personnel for those routine tasks that do not require a certified health physicist. However, the radiological technician or radiation safety professionals such as National Registry of Radiation Protection Technologists (NRRPT) personnel must be overseen. A certified health physicist does not need to be on site but must oversee the final survey and ensure proper procedures and sampling are conducted.

7. There is no substitution for either a radiation technician, a radiation safety professional, or the certified health physicist.

8. Hours for work conducted at this location will be 7:30 to 5:00, Monday-Friday.

140G0123Q0208

Document Title

Federal Regulations and Statutes:

The contractor shall perform all activities in accordance with all Federal, state, and local laws, statutes, regulations, and codes.

Federal Statutes

Nuclear Waste Policy Act of 1982

Low-Level Radioactive Waste Policy Amendments Act of 1985

Administrative Procedure Act of 1946 (5 USC §551-559)

Public Health Service Act, as amended (42 USC 201 et seq.)

Clean Air Act of 1970, as amended (42 U. S. C. 7401 et seq.)

Clean Water Act of 1977, as amended (Public Law 95-217, 33 U. S. C. 1251 et seq.)

Federal Facilities Compliance Act of 1992 (Public Law 102-386)

Transportation Safety Act of 1974

Federal Regulations

40 CFR 1-end, Protection of the Environment

10 CFR Part 71 – Packaging and Transportation of Radioactive Material

10 CFR 20.1402 - Radiological Criteria for Unrestricted Use.

NUREG-1575, Multi-Agency Radiation Survey and Site Investigation Manual

NUREG-1757, Volume 1, Rev. 2 – Decommissioning Process for Materials Licensees

NUREG-1727, Volume 2 – Characterization, Survey, and Determination of Radiological Criteria

Contractor Qualifications:

The Contractor personnel performing this work shall have a thorough understanding of the current legal, regulatory, and technical issues surrounding this work effort. The Contractor shall be familiar with the development of work plans for radiological surveys and decommissioning, performance of the work including all requirements of MARSSIM, and reporting the results. The Contractor shall employ a certified health physicist and shall use appropriate personnel i.e., radiation technicians, who have experience in cleaning of radiological areas, development of Final Status Survey Plan or

Decommissioning Plans, and authoring and signing clearance reports. A certified health physicist shall review all survey results before signing the Final Status Survey (Decommissioning Report).

The Contractor shall furnish all labor, equipment, materials, tools, supplies, transportation, management, and services (including supervision, plans, means and methods, permits, and documentation) necessary to safely and compliantly conduct surveys, remove radiological waste for disposal, and develop closure reports.

The Contractor shall possess all decommissioning licenses as required by the Nuclear Regulatory

Commission and/or all licenses as required by the respective Agreement State.

The descriptions and sequence of work is for illustrative purposes only and is not intended to give direction on how to perform or sequence the work except where specifically noted. Multiple activities may be accomplished simultaneously at the direction of the Contractor with approval from USGS. The activities shall be performed in a way that minimizes a release of potential contaminants and mitigates any disruption to present tenants.

140G0123Q0208

Document Title

Quality Assurance Surveillance Plan:

The contractor is responsible for quality control. The contractor shall provide personnel and oversight to ensure the work performance meets or exceeds the described performance standards.

The Government is responsible for quality assurance. The USGS Radiation Safety Officer will inspect the Final Status Survey Plan or Decommissioning Plan, the Decommissioning Report, survey test results, and other records and reports to assure that the standards are met or exceeded.

In the event of substandard performance, the USGS COR will notify the contractor. The contractor shall complete or redo the substandard work within 2 working days at no additional cost to the Government.

B. Deliverables.

The contractor shall provide a Final Survey Status in accordance with MARSSIM protocols within 10 business days after the laboratories have been decommissioned.

Final Status Survey Plan or Decommissioning Plan

1. The contractor shall provide the USGS COR with a Final Status Survey Plan within 10 business days after date-of-award. The Final Status Survey Plan or Decommissioning

Plan shall include experience and training of individuals working on the decommissioning surveys.

2. The USGS COR will submit the Final Status Survey Plan to the USGS Radiation Safety

Committee within one (1) day for approval.

3. The USGS Radiation Safety Committee will review and approve or disapprove the Final

Status Survey Plan within five (5) business days after receipt.

4. The USGS COR will notify the contractor when the USGS Radiation Safety Committee has approved or disapproved the Final Status Survey Plan. If the Plan requires modification, the contractor shall provide a revised Plan within two (2) working days.

This process will continue until the plan is approved.

5. The Final Status Survey Plan for the Final Status Survey should be developed using guidance from the U.S. Nuclear Regulatory Commission’s (NRC’s) NUREG 1575

MARSSIM (NRC 2000). The plan should be consistent with NRC’s NUREG-1757, Volume 1; Rev 2 Decommissioning Process for Materials Licensees (NRC, 2006a) and

Volume 2, Characterization, Survey, and Determination of Radiological Criteria (NRC, 2006b).

Final Status Survey

1. The contractor shall complete a draft Final Status Survey in accordance with the guidelines outlined in MARSSIM and provide the draft to the USGS COR within 10 business days after completing the surveys.

2. The USGS COR shall submit the draft Final Status Survey to the USGS Radiation Safety

Committee for review.

140G0123Q0208

Document Title

3. The USGS Radiation Safety Committee shall review the draft Final Status Survey and provide final approval or review comments within 10 business days after receipt.

4. The USGS COR shall notify the contractor when the USGS Radiation Safety Committee has accepted the draft Final Status Survey or if their review comments require a revised draft report. If the Survey requires modification, the contractor shall provide a revised

Survey within two (2) business days. This process will continue until the survey is approved and a final Report is issued.

5. Acceptance of the Final Status Survey is not contingent on acceptance by the Nuclear

Regulatory Commission.

6. The Final Status Survey should be developed using guidance from the United States

Nuclear Regulatory Commission’s (NRC’s) Regulation (NUREG) 1575, Multi-Agency

Radiation Survey and Site Investigation Manual (MARSSIM) (NRC 2000).

Closure Report:

The Contractor shall develop a draft Final Status Survey Plan or Decommissioning Plan and Final Status

Survey (Decommissioning Report) in accordance with the guidelines in the MARSSIM manual.

Signatures of the Contractor, primary subcontractors, and licensed/certified professionals shall be on the report. The Plan and Survey/Report shall provide a general description of activities of sufficient detail to demonstrate that the work met the work plan requirements. Actual survey results, survey class information, scan area, swipe locations, deviations from the Plan, MARSSIM statistics, calculations, or data and other documentation shall be included as an appendix. The Survey/Report shall include recommendations for remediation below the release criteria if necessary.

All reports shall be generated in the most current version of Microsoft Word©. Tables within the reports shall be generated in the most current version of Microsoft© Excel.

The deliverables and due dates are identified in the Scope of Work. The Contractor shall deliver one (1) electronic copy to:

TBD

NOTE: The signature page with original signatures shall be the only hard copy delivered.

III. SUPPORTING INFORMATION

A. Place of Performance: John Wesley Powell Federal Building, Water Mission Area, Project

Laboratories Branch, Reston, VA 20192

B. Period of Performance: The period of performance shall commence upon issuance and acceptance of the contract and terminate 90 days thereafter. Exceptions are allowed for receipt of

Radiological Waste Manifests, Certificates of Destruction, and other confirmatory documents as determined by federal regulation.

C. Attachments:

Figure 1 shows the JWPFB with generalized location of the rooms to be decommissioned.

140G0123Q0208

Document Title

Figure 2 shows the JWPFB 1st Floor plan with location of the Reston Radiochemistry Laboratory

(rooms 1B307, 1B307A, 1B307B and 1B307C) and adjacent laboratory (1B309).

Figure 3 shows a close-up floor plan of the Reston Radiochemistry Laboratory (1B307, 1B307A, 1B307B, 1B307C) and adjacent laboratory (1B309).

Figures 4 through 8 show photographs of rooms 1B307, 1B307A, 1B307B, 1B307C and 1B309.

Appendix 1 is a historical usage survey for the Reston Radiochemistry Laboratory.

Figures 1 through 8

John Wesley Powell Federal Building

Figure 1. JWPFB with generalized location of the rooms to be decommissioned.

140G0123Q0208

Document Title

Figure 2. JWPFB 1st Floor plan with location of the Reston Radiochemistry Laboratory (rooms

1B307, 1B307A, 1B307B and 1B307C) and adjacent laboratory (1B309).

140G0123Q0208

Document Title

Figure 3. Close-up floor plan of Reston Radiochemistry Laboratory (1B307, 1B307A, 1B307B, 1B307C) and adjacent laboratory (1B309). The locations of each room’s radiological workstations and the activities that occurred are provided in Appendix 1.

140G0123Q0208

Document Title

Figure 4. Room 1B307

140G0123Q0208

Document Title

Figure 5. Room 1B307A

Figure 6. Room 1B307B

140G0123Q0208

Document Title

Figure 7. Room 1B307C Figure 8. Room 1B309

140G0123Q0208

Document Title

Appendix 1:

Historical Use Survey

140G0123Q0208

Document Title

Map Explanation

1. Radiation Utilization Permit and radioactive materials storage.

2. Manganese Oxide fiber preparation.

3. 1B307 balance for weighing (Ohaus 4000E).

140G0123Q0208

Document Title

4. 1B309 balance for precision weighing (Mettler AB204).

5. All sample storage occurred in cabinets and on counters.

6. Fume Hoods (most procedures occurred in all fume hoods)

a. In February 2011, two lengths of ducting were replaced from fume hoods in the main section of the lab to the wall edge shared with 1B309. Swipes taken on the ducts were below the MDA.

7. Radon emanation boards (1995 to ~2000). Some sample and standard spills into boards. All cleaned out prior to running next sample or standard.

8. Radon emanation pump (under counter).

9. All counters have been used for handling sample spikes and 228Ra and 226Ra transfer throughout 1B307A

(main laboratory).

10. RaDeCC 223Ra and 224Ra analysis of MnO fibers and sediments. Low level Mn fiber standards stored on shelf above laptop computer.

11. RaDECC sample dewatering into a trash can with fume hood air.

12. DET01/DET01F HPGE gamma-ray spectrometer with low-level lead shielding.

13. DET02 BEGE gamma-ray spectrometer with low-level lead brick shielding.

14. DET03 BEGE gamma-ray spectrometer with low-level lead brick shielding. Prior to 2010, a wooden cabinet was located where DET03 is now located.

15. Sample storage.

16. Sample storage, barium-radium co-precipitates, and sealed sample-tin radioactive standards.

17. Radon generator storage (liquids) is mostly in above counter cabinets in the center of the 1B307A.

18. Pylon radon generator storage under fume hood.

19. Location of broken LDPE bottle and 22Na spill found 2016? Dates on the bottles indicated that this had been made in 1989. Calculations showed that over 10 half-lives had occurred since bottle contents were made and therefore very little or no radioactive materials should be present.

20. Muffle furnace – Several attempts were made for ashing MnO fibers and sediment filters.

21. Fume hood used for Ostwald coefficient, radon solubility studies.

22. Location of oven used for Ostwald coefficient, radon solubility studies.

23. Manganese-oxide filter leaching with hydroxylamine hydrochloride prior to barium-radium co-precipitation.

140G0123Q0208

Document Title

24. Drawer with dedicated pipets that were used to measure radioisotopes.

25. Centrifuge.

26. Transferring barium-radium co-precipitates to vials for well detector counting occurred on counters throughout the laboratory.

27. Higher activity rock samples were stored in this fume hood for a long time.

28. Alpha Spectroscopy.

Sample Preparation Processes

1. Radon and radium concentrations in water, soils, sediments, rocks, and natural gas by emanation using radon boards, for concentration of sample to 95 ml in Lucas cells and Pylon field units with Lucas cells.

2. Radium co-precipitation with the addition of 3-6 ml of barium nitrate and precipitation with 17% sulfuric acid.

3. Radium field concentration (and sometimes laboratory concentration) with manganese oxide fibers. The fibers can be run on RaDeCC. The fibers can be prepared for barium-radium co-precipitation by leaching with hydroxylamine hydrochloride.

4. Alpha spectroscopy preparation for U, and Th isotopes analysis.

a. Includes evaporation of samples to dryness of samples and re-acidified samples, adding of FeCl solution and precipitation with NaOH, centrifuging samples re-dissolving of samples with 8N HCl and evaporating dry, re-dissolving sample with 8N HCl and separating sample and iron with isopropyl ether, evaporation, re-dissolving sample with 8N HCl and adding to 8N HCl Biorad ion-exchange column, elution with 0.1N HCl, evaporation, re-dissolve sample with 7N HNO3 and add to a 7N Biorad ion-exchange column, elute with 0.1 HCl, evaporate dry, electroplate sample.

5. U and UAR preparation.

a. Measuring 10 ml of samples for U concentration (to CUL for analysis).

b. Calculation volume of sample for evaporation and ion exchange. (The U concentration in the solution to be aspirated into the ICP/MS should be about 30μg/L.)

c. Ion-exchange columns and elution into 30 ml bottles (to CUL) for ICP-MS analysis.

6. Fusion of samples.

7. Acid digestion of fused samples.

8. Burning off of filter paper in crucible.

9. Diluting acids.

10. Acid digestion with 8N HCl and/or 7N HNO3 and sometimes a few drops of concentrated HF.

140G0123Q0208

Document Title

11. Ion exchange. Note: Used Biorad ion exchange resin is stored in the laboratory awaiting disposal.

12. Wet chemistry.

13. Radon solubility (ostwald coefficient) studies.

14. Weighing of samples and standard reference materials.

15. Ra-224 production or purification (1B307B fume hood).

Radionuclides Used in Lab

Ra-226

Ra-228

Ra-223

Ra-224

Rn-219

Rn-220

Rn-222

Th-229

Th-230

Th-232

U-232

U-236

U-238

U-nat

RaDeCC standards (Th232?, 227Ac?)

Radioisotopes On-Hand/Not Used (Inventory Only)

Po-209 (still in original ampoule)

Chemical Radioisotopes

Thorium nitrate (in secular equilibrium)

Uranium acetate

Known Radioactive Materials Disposal

May 2010 – 500g of BaCl was sent to Denver for disposal. A barium-radium sulfate co-precipitate blank had an activity of 60 dpm.

October 2010 – At the request of Ed Busenburg, an HNU ECD sent to NRD, LLC for disposal.

July/August 2011 – Just prior to Tom Kraemer’s retirement, barium radium sulfate co-precipitates and uranium and thorium electroplated on planchets were taken to hot rock shed.

October 2012 – Fairfax County approved of a minor low-level, radioactive, sample-water discharge (discharged

10/9/2012). See Wood and Kraemer (2004) for a description of the water sample discharged.

140G0123Q0208

Document Title

Circa 2012-2014 – Several items were taken by RSO, Inc. to the hot rock shed during their Radiation Safety Support

Contract.

Circa August 2015 – Ba-133? that was found during May 2015 in 1B407 was taken to the hot rock shed for disposal.

Summer/Fall 2019 – Some produced waters, barium radium sulfate co-precipitates, as well as uranium and thorium electroplated onto planchets were taken to the hot rock shed.

Notes

Flooring throughout 1B307, 1B307A, 1B307B and 1B307C was replaced in April 2018. During this time, items were stored in the hallway, 1B309, 1B303, and 1B209.

Two lengths of fume hood ducts were replaced from laboratory fume hoods in the main section of the laboratory to the edge of the lab at the wall to 1B309 in February 2011. Swipes taken on the ducts were below the MDA.

1B309

This neighboring room (532 sq. ft.) was used for laboratory operations from 1995 – 2011 by two now-retired employees.

According to the research collaborator (no radioactive materials were used in the laboratory during this time. From 2011 -

2020, the Reston Radiochemistry Laboratory weighed mill tailing and NIST SRM 4350B (River Sediment Environmental

Radioactivity Standard) samples in 1B309. These weighing operations occurred at the balance closest to the door connecting 1B307 and 1B309 (i.e., on the bench adjoining the wall shared by 1B309 and 1B219).

References

Thomas F. Kraemer, Michael W. Doughten, and Thomas D. Bullen, 2002, Use of ICP/MS with ultrasonic nebulizer for routine determination of uranium activity ratios in natural water, Environmental Science and Technology, 36 (22): 4899-

4904.

Thomas F. Kraemer, 2005, Radium isotopes in Cayuga Lake, New York: Indicators of inflow and mixing processes, Limnology and Oceanography, 50 (1): 158-168.

Warren W. Wood, Thomas F. Kraemer, and Allen Shapiro, 2004, Radon (222Rn) in Ground Water of Fractured Rocks: A

Diffusion/Ion Exchange Model, Ground Water, 42 (4): 552-567.

(Performance Work Statement)

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or

Equipment (November 2021)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications

Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212- 3, Offeror Representations and Certifications-Commercial Products or Commercial Services.

The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3

140G0123Q0208

Document Title represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision—

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub.

L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019

(Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a

Federal contract. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management

(SAM) ( https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".

(d) Representation. The Offeror represents that—

(1) It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.

The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that—

It □ does, □ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures.

https://www.acquisition.gov/far/52.204-26#FAR_52_204_26 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.sam.gov/

140G0123Q0208

Document Title

(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment—

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded

"does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment—

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(End of provision)

140G0123Q0208

Document Title

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (November 2021)

(a) Definitions. As used in this clause—

Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).

Covered foreign country means The People’s Republic of China.

Covered telecommunications equipment or services means–

(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation

(or any subsidiary or affiliate of such entities);

(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital

Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the

Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Critical technology means–

(1) Defense articles or defense services included on the United States Munitions List set forth in the

International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal

Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export

Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal

Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title

9 of such Code, or part 73 of title 42 of such Code; or

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control

Reform Act of 2018 (50 U.S.C. 4817).

Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.

Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity

140G0123Q0208

Document Title that excludes the need to include an internal or third-party audit.

Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.

Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub.

L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019

(Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.

(c) Exceptions. This clause does not prohibit contractors from providing—

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(d) Reporting requirement.

(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the

Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The Contractor shall report the following information pursuant to…