B09_Attachment_9_Amendment_1_Questions_and_Answers_0001.docx
DOCX document 18 KB Posted
- Attached to
- CERC Asphalt Parking Lot Federal contract opportunity
- Solicitation number
- 140G0122Q0020
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Amendment_2_Revised_Schedule_of_Items_140G0122Q0020_0002.pdf | ||
| B09_Attachment_10_Amendment_2_Questions_and_Answers_0002.docx | DOCX document | |
| B08_Attachment_1_SOW_CERC_Parking_Lot_Renovations_Rev_1_0002.docx | DOCX document | |
| Sol_140G0122Q0020_Amd_0002.pdf | ||
| Sol_140G0122Q0020_Amd_0001.pdf | ||
| B08_Attachment_4__WD_MO20210036_dtd_5_Nov_2021.pdf | ||
| B08_Attachment_6_Form_DI-137_Release_of_Claims.pdf | ||
| B08_Attachment_8_Statement_and_Acknowledgement_of_Subcontractor_SF1413-13e.pdf | ||
| B08_Attachment_2_Aerial_Photo_No_1.jpg | JPG image | |
| B08_Attachment_1_SOW_CERC_Parking_Lot_Renovations.docx | DOCX document | |
| B08_Attachment_5_Payment_Bond_SF25A-16d.pdf | ||
| B08_Attachment_3_Aerial_Photo_No_2.jpg | JPG image | |
| B08_Attachment_7_Payroll_WH-347.pdf | ||
| Sol_140G0122Q0020.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140G0122Q0020 Amendment 1 Q&A
1. Does the project require prevailing wage?
Reference Section H for applicable Wage Determination
2. Does project only consist of joint milling With 1.5 inch overlay?
No, the whole parking area gets milled or grinded.
Reference SOW ll. Required tasks standards, and deliverables B ii. The contractor shall mill the parking areas designated which consists of approximately 5,000 square yards (4180 meter²) asphalt covered area. The contractor shall mill or grind approximately 1.5” (5.04 cm) from the parking lot surface. Where they exist, adjacent existing asphalt curbs and gutters are constructed of concrete. The contractor shall ensure the curb/gutter reveal is protected from damage. Milled areas are level, smooth, and clean. 300 Square Yards of failed areas shall be completely removed and new base rock installed and compacted to a depth of not less than 6” (15.2 cm)
3. Is there a documented page with exact quantities for bidding? ( Length of milling, Asphalt tonnage, etc….. )
Section B-1 Schedule of Items is delineated by Task 1, 2 and 3 with a unit of measure as Lump Sum. Each Task is described in the SOW. Reference Attachment 1 SOW II.a.i. i. The Contractor shall perform field verifications of measurements, dimensions, and quantities of all items. The Contractor shall be responsible for field-verifying all dimensions prior to construction and installation of any component of this requirement. Also, reference Section L-9 for the Site Visit date, time and location.