B08_-_Signs_Specifications.pdf

PDF 149 KB Posted

Attached to
Outdoor Signs - USFWS DIV OF POLICY & PRGMS - VA
Solicitation number
140FS326Q0041
Issued by

About this file

This document is a specifications sheet for a federal contract opportunity titled "Grant Acknowledgement Signage" issued by the U.S. Fish and Wildlife Service (USFWS) – Office of Conservation Investment.

The project requires three types of outdoor signage, all 11" X 17" medium gauge plastic (.050) with white backgrounds and two 3/16" diameter mounting holes centered top and bottom, 1" inset. The Wildlife Management Area Signage requires green PMS #555 C printing on one side with 1/2" radius corner rounds. The Boating & Fishing Access Signage requires Reflex Blue printing on one side with 1" radius corner rounds. The Target Range Signage requires Deep Green (#17320b) printing on one side with 1/2" radius corner rounds. All signage must be designed for long-term outdoor installation, water and rot resistant, UV-protected, and corrosion-resistant. Delivery must be FOB Destination to USFWS – Office of Conservation Investment, 300 Westgate Center Drive, Hadley, MA 01035-9589, with all quoted prices including installation. The contractor bears full responsibility for packing, marking, delivery in good condition, and any loss or damage prior to receipt. Contractors must contact the Technical Point of Contact, Elena Campbell (USFWS-OCI), no later than three days prior to delivery to arrange delivery time. The contractor is responsible for all unloading, with no government assistance or equipment provided.

View the file

Other files

File Type Posted
Example_of_Sign_Quality.jpg JPG image
General_Signs_Combined.pdf PDF
Sol_140FS326Q0041.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Project: Grant Acknowledgement Signage

PR Number:

Item:

1. Product Features:

Name of Item: Wildlife Management Area Signage Salient Characteristics: These characteristics are consistent with existing signage.

Material: MEDIUM GAUGE PLASTIC Size: 11" X 17" Gauge: .050 Background Color: WHITE Print Color(s): GREEN PMS #555 C / ONE SIDE Mounting Holes: 2 EACH, 3/16" DIAMETER, CENTER TOP & BOTTOM, 1" IN Round Corners: 1/2" RADIUS

Capabilities: Designed for long-term outdoor installation, will not absorb water or rot, printed to withstand sun exposure, and will not rust or corrode (like metal)

Name of Item: Boating & Fishing Access Signage Salient Characteristics: These characteristics are consistent with existing signage.

Material: MEDIUM GAUGE PLASTIC Size: 11" X 17" Gauge: .050 Background Color: WHITE Print Color(s): REFLEX BLUE / ONE SIDE Mounting Holes: 2 EACH, 3/16" DIAMETER, CENTER TOP & BOTTOM, 1" IN Round Corners: 1" RADIUS

Name of Item: Target Range Signage Salient Characteristics: These characteristics are consistent with existing signage.

Material: MEDIUM GAUGE PLASTIC Size: 11" X 17" Gauge: .050 Background Color: WHITE Print Color(s): Deep Green (#17320b) / One Side Mounting Holes: 2 EACH, 3/16" DIAMETER, CENTER TOP & BOTTOM, 1" IN Round Corners: 1/2" RADIUS

2. Delivery:

Prices quoted must be FOB Destination

“F.o.b. destination” means --Free of expense to the Government delivered, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested.

If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee.

Contractor responsibilities. The contractor shall -- (1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

3. Delivery Location:

Product shall be delivered to the following location:

USFWS – Office of Conservation Investment 300 Westgate Center Drive

Hadley, MA 01035-9589

4. Installation:

Prices quoted must include installation. All labor and parts associated with and required for installation are the sole responsibility of the contractor. No assistance or equipment will be provided by the government. Installation shall be completed according to industry standards.

5. Technical Point of Contact (POC):

Elena Campbell (USFWS-OCI)

6. Delivery Instructions:

No later than three days prior to delivery, please contact the Point of Contact listed above, to arrange a specific time for delivery. Unloading the product is the sole responsibility of the delivery carrier. No labor or equipment will be provided by the government to unload the supplies.

7.0 Customer Specific Delivery requirements

Not Applicable

8.0 Installation:

Not Applicable