About this file

This is a Questions and Answers document (Addendum 1) from a site visit conducted on January 13, 2025, for an automatic gate installation project at Alligator River National Wildlife Refuge in Manns Harbor, NC. The document addresses technical questions about gate specifications and clarifies several requirements from the Statement of Work (SOW).

Key clarifications include: consideration of virtual vs. in-ground exit loops; potential reuse of the north gate post while replacing the damaged south post; possible modification to allow either aluminum or galvanized gate material options for the 30-foot gate; confirmation that safety sensors should be included if needed to meet gate closure requirements; no battery backup required but manual override necessary; optional pricing for remote/garage door openers; electrical trenching and wiring to be handled under separate contract; and addition of two 4-inch bollards with yellow covers to protect the gate operator. The U.S. Fish & Wildlife Service indicates several potential SOW modifications will be discussed with the Contracting Officer based on contractor feedback from the site visit.

View the file

Other files for this federal contract opportunity

Other files attached to NC ALLIGATOR RIVER NWR AUTOMATIC GATE, newest first.
File Type Posted
Sol_140FS325Q0021_Amd_0003.pdf PDF
ADDENDUM_1_Changes_to_SOW_Automatic_Gate_1_14_25_0003.pdf PDF
A02_ADDENDUM_1_QUOTE_SCHEDULE_1_14_2025_0003.pdf PDF
SOW_Automatic_Gate_rev_1_01_08_2025_AMENDED_2_0002.docx DOCX document
Sol_140FS325Q0021_Amd_0002.pdf PDF
SOW_Automatic_Gate_rev_1_01_06_2025_AMENDED_0001.pdf PDF
Sol_140FS325Q0021_Amd_0001.pdf PDF
Sol_140FS325Q0021.pdf PDF
Attachment_3-_Past_Performance_Data_Document.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF THE INTERIOR

U.S. FISH & WILDLIFE SERVICE

140FS325Q0021 – ADDENDUM 1

Alligator River NWR – Automatic Gate 13518 Milltail Road, Manns Harbor, NC 27953

SITE VISIT QUESTIONS AND RESPONSES – JANUARY 13, 2025

1. Does it have to be an in-ground exit loop, or can it be virtual? Contractor explained that a virtual loop uses a sensor that shoots a beam across the driveway to sense approaching traffic. Virtual loop would prevent wear and tear from heavy traffic on the in-ground loop. A little more expensive but with labor to dig up the gravel, a virtual loop would be the same or cheaper.

Response: We will consider it. I’ll talk to the CO about a contract modification or option to bid either way depending on what we decide.

2. SOW calls for schedule 40 gate posts. I think the current gate post [north post] is sufficient to use as a latching post and I would not replace it. It would save money.

Response: If you don’t think the gate posts need to be replaced, you can put that in your bid.

The post on the opposite side [south post] has been hit and we’ve got stakes pounded by it to shore it up. That post would need to be stabilized or replaced. I will discuss impacts to the SOW with the CO.

3. Does it have to be an aluminum gate? Galvanized gate would be cheaper and less expensive to repair should it get hit. Weight should not be an issue for 30-ft. I have put in my longer gates that are galvanized.

Response: During Market Research gave us some idea on costs that suggested that the lighter weight aluminum gate would be better for this width. I’ll discuss it with the CO but may do a modification to allow the option to bid with either a galvanized or aluminum gate.

4. Do you want a safety sensor on the roadside of the gate to be sure that the gate does not close on a vehicle?

Response: SOW states that the gate operator should sense if area is clear to close the gate. If you think that is needed to meet that requirement, then include it in the quote.

5. Is a battery back-up needed?

Response: No. We can get in or out through other gates. Gate should have a manual override.

DISCUSSION POINTS/ CLARIFICATIONS

1. Pointed out the bid option regarding a price per opener for remote/garage door openers for the gate. Service has not decided if we want these or not so please supply a price so we can decide.

2. Clarification: The trenching and wiring from the gate operator to the electric panel will be handled by the Service through a separate contract. If any other additional work must be done to make the gate operational, this must be spelled out in the bid.

3. SOW discusses bollards to protect the keypads but omitted discussion of any bollards to protect the gate operator. Given that employees park near where the gate operator will be, a modification will be done to the SOW to add the installation of two, 4-in bollards with yellow bollard covers to protect the gate operator.