This is a Request for Quotation (RFQ) for hazardous materials building assessment services at the San Joaquin River National Wildlife Refuge in Vernalis, California. The U.S. Fish and Wildlife Service seeks qualified small business contractors to perform inspection and sampling of structures for asbestos-containing material (ACM), lead-based paint (LBP), and other hazardous materials prior to building renovations or demolition. The solicitation includes a firm-fixed-price base bid task for the Green House Residence (1,918 square feet, built 1973) and an option task for the Old Barn (13,855 square feet, scheduled for demolition). The anticipated period of performance is 45 days after notice to proceed. Quotes are due by 13:00 Eastern Time on February 6, 2026, and must be submitted via email to Tanner_Frank@fws.gov. Award will be made on a best-value basis considering price and three evaluation factors: technical approach, project schedule, and relevant experience with comparable projects completed within the past five years. This is a total small business set-aside (NAICS code 541620, PSC F107). Offerors must be registered in SAM.gov, include completed FAR provision 52.212-3 certifications, and provide company letterhead quotations with unit and total pricing. Key contractual requirements include compliance with EPA, OSHA, California Department of Industrial Relations, and California EPA regulations; use of Cal/OSHA-certified asbestos inspectors and California-licensed lead assessors; accredited laboratories (NVLAP for asbestos, NLLAP or XRF for lead); and delivery of bookmarked PDF reports (maximum 10 MB) to the Contracting Officer, Project Leader, and Regional Environmental Compliance Coordinator. The contractor assumes liability for proper disposal of all suspect materials and sampling debris. Payment will be processed through the Invoice Processing Platform (IPP) system, and contractor performance will be evaluated through the Contractor Performance Assessment Reporting System (CPARS). The RFQ incorporates FAR commercial item procedures (Parts 12 and 13) and includes mandatory federal clauses addressing labor standards, small business utilization, equal opportunity, payment terms, and supply chain security requirements.

View the file

Other files

File Type Posted
B08_-_SOL_Amendment_1_Attachments_0001.pdf PDF
Sol_140FS126Q0020_Amd_0001.pdf PDF
Sol_140FS126Q0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140FS126Q0020

See Schedule See Schedule

FWS SAT 1

FWS, SAT Team 1 5275 Leesburg Pike Falls Church VA 22041

02/06/2026 1300 ED

0044026121

Tanner Frank 0000000000

FS1 100.00

Joshua Stuart

541620

$19

01/22/2026

0011280645

DELIVER TO:

FWS SAN JOAQUIN RIV NWR

2714 Dairy Rd

Vernalis CA 95385 US

This is a combined synopsis/solicitation for commercial items prepared in accordance with

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

the format in Federal

Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice.

This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued.

The United States Fish and Wildlife Service

(Service) requests contract support services for inspection of structures prior to building renovations to provide sufficient sampling, testing and an assessment for Asbestos

Containing Material (ACM), Lead Based Paint

(LBP), and hazardous material at the San

Joaquin River NWR. The anticipated Period of Performance is 45 Days after Notice to Proceed. Addition details can be found in the

Statement of Work.

This Request for Quotation (RFQ) is a TOTAL

SMALL BUSINESS SET ASIDE and is conducted under the procedures of FAR Parts 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition

Circular 2026-04. The NAICS code is 541620, and

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

a PSC of F107.

Instructions

All responsible small business sources may submit a quote, which shall be considered by the agency. Award will be made as a firm-fixed-price contract. The basis of award is Best Value, where consideration of price and the additional evaluation factors, described in

Attachment 2, will result in the selection of the quote most beneficial to the government. Award will be made to a responsible source pursuant to FAR subpart 9.1.

Options will be evaluated in accordance with FAR provision

52.212-2 ¿ Evaluation -- Commercial Items

Please submit your quotation (showing unit and total price) on company letterhead or the enclosed SF-1449 form with SAM.gov UEI code. and point of contact phone number and e-mail address. Refer to FAR provision 52.212-1

Instructions to Offerors ¿ Commercial Items for additional submission guidance and include a copy of FAR provision 52.212-3 Offeror Representations and

Certifications -- Commercial Items with applicable sections completed.

NOTICE TO PROSPECTIVE CONTRACTORS: If

Sub-contractors will perform on this project, the Prime contractor must provide subcontractor information, i.e., company name, supervisor name and contact information and valid email address and telephone number upon request. Failure to do so could result in quote being considered nonresponsive and ineligible for award.

Quotes Due: 13:00 Eastern Time on 02/06/2026

E-Mail Quote Submission: Tanner_Frank@fws.gov

Site Visit Date(s): Anytime during the solicitation period.

Site Visit Point of Contact: Caroline Kreiser

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

email: CAROLINE_KREISER@FWS.GOV Call:

719-588-5336

Site visit appointments will need to be coordinated with the USFWS Facility point of contact identified above

In order to have a quote considered for award, respondent must be registered at the System for

Award

Management (SAM) website (https://www.sam.gov)

Delivery: 09/29/2025

00010 Green House HazMat

00020 Barn Hazmat

(Option Line Item)

Anticipated Exercise Date 10

United States Department of the Interior

FISH AND WILDLIFE SERVICE

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice.

This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued.

The United States Fish and Wildlife Service (Service) requests contract support services for inspection of structures prior to building renovations to provide sufficient sampling, testing and an assessment for Asbestos Containing Material (ACM), Lead Based Paint (LBP), and hazardous material at the San Joaquin River NWR. The anticipated Period of Performance is 45 Days after Notice to Proceed. Addition details can be found in the Statement of Work.

This Request for Quotation (RFQ) is a TOTAL SMALL BUSINESS SET ASIDE and is conducted under the procedures of FAR Parts 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition Circular 2026-04. The NAICS code is 541620, and a PSC of F107.

Instructions

All responsible small business sources may submit a quote, which shall be considered by the agency. Award will be made as a firm-fixed-price contract. The basis of award is Best Value, where consideration of price and the additional evaluation factors, described in Attachment 2, will result in the selection of the quote most beneficial to the government. Award will be made to a responsible source pursuant to FAR subpart 9.1. Options will be evaluated in accordance with FAR provision 52.212-2 – Evaluation -- Commercial Items

Please submit your quotation (showing unit and total price) on company letterhead or the enclosed SF-1449 form with SAM.gov UEI code. and point of contact phone number and e-mail address. Refer to FAR provision 52.212-1 Instructions to Offerors – Commercial Items for additional submission guidance and include a copy of FAR provision 52.212-3 Offeror Representations and Certifications -- Commercial Items with applicable sections completed.

NOTICE TO PROSPECTIVE CONTRACTORS: If Sub-contractors will perform on this project, the Prime contractor must provide subcontractor information, i.e., company name, supervisor name and contact information and valid email address and telephone number upon request. Failure to do so could result in quote being considered non-responsive and ineligible for award.

Quotes Due: 13:00 Eastern Time on 02/06/2026 E-Mail Quote Submission: Tanner_Frank@fws.gov Site Visit Date(s): Anytime during the solicitation period.

Site Visit Point of Contact: Caroline Kreiser email: CAROLINE_KREISER@FWS.GOV Call: 719-588-5336 Site visit appointments will need to be coordinated with the USFWS Facility point of contact identified above

In order to have a quote considered for award, respondent must be registered at the System for Award Management (SAM) website (https://www.sam.gov) mailto:Tanner_Frank@fws.gov mailto:CAROLINE_KREISER@FWS.GOV

Attachment 2: Additional Evaluation Factors

Factor 1: Technical Approach

The technical approach shall contain sufficient detail to determine whether the offeror provides a sound, compliant approach that meets the requirements of the Statement of

Work and demonstrates a thorough knowledge and understanding of those requirements. The offeror shall demonstrate the ability to provide well-formatted, edited, succinct, and cohesive deliverables. The submission shall clearly identify all risks, assumptions, exclusions, and dependencies inherent in the proposal.

Factor 2: Project Schedule

The offeror shall provide information on the team’s project scheduling capabilities. The proposal shall describe how the team will implement and manage the project schedule.

The offeror shall discuss internal procedures for handling delays in order to minimize schedule creep. The proposal shall also identify how labor and other resource constraints will be managed to reduce costs and provide an achievable and flexible schedule.

Factor 3: Relevant Experience

The offeror shall provide a description of similar projects completed within the past five years. This may include work performed for the U.S. Fish and Wildlife Service, NOAA, or other federal agencies. Descriptions should demonstrate the offeror’s ability to successfully complete projects of comparable scope and complexity.

San Joaquin River NWR Page 1 of 7 Hazardous Material Testing

United States Department of the Interior

U.S. FISH AND WILDLIFE SERVICE

STATEMENT OF WORK

ASBESTOS, LEAD BASED PAINT, AND

HAZARDOUS MATERIALS BUILDING ASSESSMENT SURVEYS

San Joaquin River NWR

1. SCOPE OF WORK

The U.S. Fish & Wildlife Service (USFWS) is requesting a Request For Quote (RFQ) to perform all work necessary for the inspection of structures prior to building renovations and/or demolition to determine the presence of asbestos, lead, and other hazardous materials.

This Scope of Work is requested to provide sufficient sampling, testing and an assessment for Asbestos Containing Material (ACM), Lead Based Paint (LBP), and hazardous material prior to the demolition of building(s) and/or to perform repairs or maintenance to building(s) that are occupied.

Note: Buildings listed as scheduled for demolition shall include destructive testing to determine presents of asbestos.

Note: Buildings are not scheduled for demolition shall test all materials that are accessible.

Material that is not accessible shall be tested prior to demolition/maintenance or shall be assumed to be asbestos contaminated material.

The survey shall be performed in applicable safe working conditions as defined by State of California, Occupational Safety and Health Administration (OSHA) and the United States Environmental Protection Agency (EPA).

The RFQ(s) are being solicited from qualified firms to perform site inspections of each building listed below. The site inspection will entail inspecting both the interior and exterior of each building for asbestos, lead, and other hazardous materials as noted, and supplying San Joaquin River NWR staff with a written report indicating the presence of asbestos, lead, and hazardous materials. The report will identify the type of material, condition, location, and accurate square and/or linear footage. Cost estimates for removing any confirmed asbestos containing materials, lead impacted areas, and hazardous material shall be provided for each type.

San Joaquin River NWR Page 2 of 7

1.1 TASK 1 Base Bid – Green House Residence:

Green House Residence on Dairy Road - perform a hazardous material building survey for the Green House to check for asbestos and lead prior to demolition.

1.2 TASK 2 Option – Old Barn:

Old Barn Buildings - perform a hazardous material building survey on the barn buildings to check for asbestos and lead prior to demolition.

1.3 DELIVERABLES:

A bookmarked PDF (maximum file size 10 MB) shall be submitted electronically to the COR, the Project Leader and the Regional Environmental Compliance Coordinator (RECC).

2. REGULATORY COMPLIANCE

2.1 The building surveys shall be performed in accordance with the following Regulatory

Agencies and others as applicable:

• Environmental Protection Agency (EPA)

• Occupational Safety and Health Agency (OSHA)

• State of California

• California Department of Industrial Relations

• California Environmental Protection Agency

2.2 The building surveys shall be performed in accordance with:

a) Asbestos

• National Emission Standards for Hazardous Air Pollutants (NESHAP) - 40 CFR Part

61, Subpart M – National Emission Standard for Asbestos

• Toxic Substances Control Act (TSCA) - 40 CFR Subpart D, Section 763 – Asbestos

• 29 Code of Federal Regulations (CFR) 1910.1001: General Industry Occupational

Safety and Health Standards

• 29 CFR 1926.1101: Safety and Health Regulations for Construction

• California Department of Industrial Relations Title 8 Subchapter 4, Article 4, Paragraph 1529

• California Department of Industrial Relations Title 8 Subchapter 7, Article 110, Paragraph 5208

b) Lead

• TSCA - 40 CFR Subpart D, Section 745 – Lead-Based Paint Hazard

• 29 CFR 1910.1025: General Industry Occupational Safety and Health Standards

• 29 CFR 1926.62: Safety and Health Regulations for Construction

• California Code of Regulations, Title 17, Division 1, Chapter 8

2.3 Before a firm will be awarded a contract, the firm must have supplied to the U.S. Fish and Wildlife Serviced the firm's resume with business references and the following information particularly relative to the activity being undertaken in this project:

• Name and address of submitter (Contractor), plus name and telephone number of

San Joaquin River NWR Page 3 of 7 the individual to contact for further information.

• Persons conducting inspections for asbestos must be registered with Cal/OSHA and certified per Cal/OSHA Chapter 3.2, subchapter 2, article 2.6 paragraph 341.15.

• Persons conducting the inspection for lead must be licensed as a Lead Assessor or Inspector per Title 17, Division 1, Chapter 8 of the California Code of Regulations.

• Name of lab being used to analyze asbestos samples and the National Voluntary Laboratory Accreditation Program (NVLAP) Asbestos Fiber Analysis Program Certification Number.

• Name of lab being used to analyze lead samples and National Lead Laboratory Accreditation Program (NVPAP) Certification Number.

• If an XRF Lead Analyzer is used to analyze lead paint samples,

• the company will provide XRF Machine Serial Number and documentation of calibration of unit.

• the company will registration of XRF Machine with State of Michigan Registration.

• All proposal shall include a Sample Report (Asbestos, Lead) with Individual Identification Number for Sample, Location of Sample, Description of Sampled Material, Sample Result, Estimated Square Footage or Linear Footage with Descriptions (i.e. 6 Inch Pipe Insulation, 6 Foot Pipe Insulation) of Material.

• Any other information which will demonstrate abilities to perform there required services should also be included.

• Proof of Insurance.

3. PERIOD & PLACE OF PERFORMANCE

A. Period of Performance: The Contractor shall have (45) days to complete the survey and submit reports.

B. Place of Performance: 2714 Dairy Road, Vernalis, CA 95385

1. Green House (RPI 10000950) is 1,918 square feet building built in 1973. The building will be either renovated or demolished (tbd). Samples shall be taken in discrete location in coordination with station staff as needed.

2. Old Barn (10000954) is 13,855 square feet unconditioned outbuilding. The building is scheduled for demolition. Bat guano may be present. Samples shall be taken in locations as coordinated with station staff.

San Joaquin River NWR Page 4 of 7

4. GUIDELINES

The inspector's contact will be Jack Sparks (Refuge Manager) or Chris Harper (Project Leader), both stationed at the San Luis NWR.

The inspector shall take sufficient samples of all suspected ACM building materials and commercial products, components with lead (e.g. Lead Pipe) and/or lead-based paint (LBP) in accordance with guidance provided in this document or stricter state regulations and have them analyzed by an (insert accreditation for Lead and Asbestos) state certified laboratory.

Suspect asbestos and lead based paint samples shall be collected following professional protocols with appropriate sampling tools and leak-tight containers.

Each suspect sample shall be individually numbered, recorded on a sample log, description of material, quantified, and submitted under chain-of-custody to a laboratory certified under the Environmental Laboratory Accreditation Program.

Any sampling debris (i.e. protective clothing, contaminated wipes, respiratory cartridges, etc.)

will be the responsibility of the contractor. As such the contractor assumes all liability for the correct disposal of suspect ACM, ACBM waste, and lead waste.

A) ASBESTOS

The building assessment surveys will identify friable and non-friable asbestos-containing-materials (ACM) and asbestos containing commercial products. The survey shall consist of the identification, measuring, quantifying, testing and estimating the cost of removal of Regulated Asbestos-Containing Material ( RACM), Category I and Category II non-friable asbestos containing building materials, and commercial products that contain asbestos material. This survey shall be performed by a California State Certified Asbestos Building Inspector.

1) INSPECTION PROCEDURE

I. Proper bulk sampling methods for suspect ACM will be followed. Proper bulk sampling methods are defined as wetting with amended water, encapsulation after sample collection, and clean-up of debris associated with sample collection.

II. Obtain randomly distributed samples from each homogeneous area as listed in Table I. A material may be assumed to be ACM without sampling or based on the analytical results of fewer samples.

III. Locate and quantify all homogeneous areas of surfacing materials, thermal system insulation, miscellaneous materials, and asbestos commercial products in areas to be demolished or renovated. Note any possible asbestos debris that is present due to deterioration or damage in the above areas. Unless assumed to be ACM, all types of floor tiles in all layers must be inspected and sampled. Whenever necessary, destructive sampling must be done to access ducts and/or pipes in walls or chases and in areas above suspended ceilings to determine if ACM is present for buildings scheduled for demotion. In buildings that are not scheduled for demolition, the report shall identify areas where destructive testing was not conducted.

San Joaquin River NWR Page 5 of 7

IV. Analysis of suspect ACM bulk samples through Polarized Light Microscopy (PLM) shall be performed by persons or laboratories with proficiency demonstrated by current successful participation in a nationally recognized testing program such as the National Voluntary Laboratory Accreditation Program (NVLAP) or the National Institute for Standards and Technology (NIST) or the Round Robin for bulk samples administered by the American Industrial Hygiene Association (AIHA) or an equivalent nationally recognized round robin testing program.

V. The laboratory should delineate sample layers (i.e. VAT and mastic; drywall, mud, and tape; cloth wrap and mag; etc.).

VI. Tabulate results by property address. Show the location and square or linear footage of each homogeneous area. Quantify all assumed materials such as floor tile and resilient roofing and siding as ACM (note multiple layers). If ducts and pipes inside walls could not be visually inspected, they must be assumed ACM. The inspector's name, address, phone number, certification number and date of inspection must appear on each report.

VII. Provide an estimate for remediation of asbestos containing material.

2) ACM sample material shall be analyzed and retained by the laboratory for 30 days in case the Service requests follow on point count analysis.

TABLE I - Minimum Sampling Requirements for Asbestos Containing Materials The materials listed in this table are provided as common examples and are not a complete list of building components or equipment that require testing. Quantities of samples to be obtained per homogeneous area are:

NOTE: Discretion shall be exercised when defining homogeneous areas, giving consideration to all factors which could reduce the number of samples required.

Material Type Number of Samples Size of Homogenous Area

Surfacing materials

3 <= 1,000 square feet

5 > 1,000 square feet and <=5,000 square feet

7 > 5,000 square feet

Thermal System Insulation

3 each homogeneous area

1 Each homogenous area of patch less than 6 linear or 6 square feet

3 Each homogeneous group valves, fittings, elbow tees, hangers

0*

Inspector has determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACBM. * Note on inspection the location of material.

Miscellaneous Material*

- Each layer of floor tile,

- Resilient sheet goods, 3 The minimum of three samples

Additional sample may be obtained at the discretion of the inspector based on the square footage of the homogenous area:

San Joaquin River NWR Page 6 of 7

- Paper backing of sheet flooring,

- Mastic,

- Resilient roofing,

- Siding materials,

- Each homogeneous areas of ceiling tiles,

- Slate flooring and roofing.

- Slate or transite siding,

- Drywall/drywall joint compound systems,

- Etc.

3 <= 1,000 sf

5 > 1,000 sf and <=5,000 sf

7 > 5,000 sf

Other – Asbestos Containing Products:

- Asbestos Gloves

- Fireproof Safes

- Asbestos Gasket

- Etc.

1* Material that are labeled asbestos containing do not need to be sampled but shall be inventoried.

Note: When debris is identified that corresponds with identifiable suspect ACM or ACBM, utilize the correct Homogeneous Area Numbers corresponding with the suspect material.

ASBESTOS, LEAD AND (if applicable) SOIL SAMPLING BUILDING INSPECTION REPORT

A) Following laboratory identification of the suspect samples:

1) The report findings shall adhere to professional standards and contain at a minimum:

a. Company name, building inspector name(s), report preparer name (if different from inspector), company mailing address, and company telephone number.

b. Station Name, Name of Building (if any), and street address, city, state, zip code for structure(s) inspected.

c. Date of inspection, and date of report preparation (if different).

d. Printed name and signature of each individual involved in the inspection.

e. Asbestos Building Inspector License number and expiration date for each individual

f. Lead Inspector or Lead Assessor License number and expiration dated for each individual

g. Provide a separate, detailed discussion for each building inspected, if multiple buildings are included in the same report.

h. For each building, identify and provide a detailed description of all exterior and interior building materials. Indicate how samples, locations and/or materials are labeled/identified in the building to assist with abatement. Document sample locations and areas that were not accessible during the inspection.

i. Provide an estimated square or linear footage for asbestos or lead of suspect building material. This may be calculated by room size or actual measurement.

j. Clearly state the number of samples collected for each type of suspect material based on the estimated or actual square or linear footage.

k. Discuss the type, amount (square or linear footage) and condition of all suspected material testing positive or assumed positive for asbestos, lead exceeding regulatory

San Joaquin River NWR Page 7 of 7 standard, and hazardous materials.

l. Include a written recommendation for disposition of all identified asbestos-containing materials (ACM) or presumed asbestos-containing materials (PACM), Lead Paint, and Hazardous Material and a cost estimate for each activity.

m. Include photographs, building drawings or sketches.

n. A map of the building indicating sample location and locations of other hazardous waste identified in the report.

o. Provide a copy of all sample collection data, chain of custody form(s), and lab analysis reports.

p. Copy of the inspector’s certification card for lead and asbestos.

2) LEAD: The building assessment surveys will identify components with lead (e.g. lead piping) and lead-based paints on concrete, masonry, wood, drywall, and metal surfaces found at specific buildings located at Little Pend Oreille NWR. This assessment is to include the interior and exterior of all structures specified for the survey to be performed. This survey shall be performed by a California State Lead Inspector or Risk Assessor.

I. INSPECTION PROCEDURE

a. Locate and quantify all homogeneous areas of lead-based paint and components with lead (e.g. lead pipe) in areas to be demolished or renovated. Note the condition of the lead-based paint. Note any possible lead-based paint debris that is present due to deterioration or damage in the above areas.

b. All layers of paint to include the substrate shall be analyzed

c. Bulk samples shall be of sufficient material to provide Total Threshold Limit

Concentrations (TTLC)

d. Analysis of samples shall be performed by persons or laboratories:

II. Accredited by National Lead Laboratory Accreditation Program (NLLAP), or III. An XRF Lead Analyzer that

a. Registered for use in the State of California\

b. Part of a National Leal Laboratory Accreditation Program (NLLAP)

c. Annually calibrated (Certification on Site)

d. Daily calibration checks

e. Check against standard every 20th sample.

IV. Tabulate results by property address. Show the location and square or linear footage of each homogeneous area. The inspector's name, address, phone number, certification number and date of inspection must appear on each report.

V. Provide an estimate for remediation of lead-based paint containing material.

B) The report findings shall also contain recommendations for any actions needing to be completed prior to demolition and an estimate cost. A draft electronic report shall be provided to the Service for a ten working day review/comment period prior to issuing the final report.

ATTACHMENTS:

Aerial Image Building Photos

July 17, 2025

San Joaquin River National Wildlife Refuge Complex Asbestos, Lead and Hazardous Material Building Assessments

PRICE SCHEDULE

San Joaquin River National Wildlife Refuge Hazardous Materials Building Assessments

Each Task item shall include all cost for materials, labor, expenses, fees, overhead and profit associated with each item in accordance with the solicitation documents.

BASE BID TASKS

Item # Description Unit Unit

Cost Total Cost

1 Green House HM Building Assessment LS

TOTAL COST OF BASE BID ITEMS:

2 OPTION A: Old Barn HM Assessment LS

TOTAL COST OF OPTION ITEMS:

TOTAL PROJECT COST (BASE BID ITEMS PLUS ALL OPTIONS): $_____________________

Company Name

DUNS #

Quote Prepared By

Title

Signature

Address

Date

Phone Number

Email

NOTES:

Incomplete Price Schedules will not be considered.

HM = Hazardous Materials

Clauses

52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2023)

---Addendum to 52.212-4---

DIAR 1452.237-70 INFORMATION COLLECTION - DEPARTMENT OF THE INTERIOR (JUL

1996)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar

(End of clause)

DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (FEB 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

PDF Vendor-created invoice

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC

2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-28 Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts (Dec 2023)

52.204-29 Federal Acquisition Supply Chain Security Act Orders—Representation and Disclosures (Dec 2023)

52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition (Dec 2023)

52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND

CONSTRUCTION CONTRACTS (AUG 2018)

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (Jan 2025) (DEVIATION FEB 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108- 78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).

_X_ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub.

L. 115–390, title II).

_X_ (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).

_X_ (ii) Alternate I (Dec 2023) of 52.204-30.

_X_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) ( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (17) [Reserved]

_X_ (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).

__ (21) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

_X_ (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

_X_ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

_X_ (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (Jan 2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).

_X_ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

_X_ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

_X_ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.

13126).

__ (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (Jul 2014) of 52.222-35.

_X_ (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (Jul 2014) of 52.222-36.

__ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_X_ (39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

_X_ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (46) 52.223-23, Sustainable Products and Services (May 2024) (DEVIATION FEB 2025) ( 7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47) (i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

_X_ (48) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (Oct 2022) of 52.225-1.

__ (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C.

3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (Jan 2025) of 52.225-3.

__ (iv) Alternate III (Feb 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

_X_ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) ( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

_X_ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

_X_ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31 U.S.C. 3332).

__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).

__ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L.

118-31, 41 U.S.C. 3901 note prec.).

__ (64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

__ (65) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).

__ (ii) Alternate I (Apr 2003) of 52.247-64.

__ (iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

_X_ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).

_X_ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_X_ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

_X_ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

_X_ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792).

__ (10) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent Human Trafficking (Jan 2025) ( 49 U.S.C. 40118(g)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .