A04_SOW_Creston_Septic_Line_0001.pdf
PDF 208 KB Posted
- Attached to
- Creston National Fish Hatchery Replace Septic Line Federal contract opportunity
- Solicitation number
- 140FGA26R0014
About this file
This is a Statement of Work for the replacement of a septic line at Creston National Fish Hatchery in Kalispell, Montana. The contractor shall replace the existing septic line running from the Hatchery Building to the Sewage Lift Station (approximately 160 feet), which was constructed in 1968 and currently freezes due to shallow burial depth of one foot or less. The contractor must excavate a trench 4 feet deep and 160 feet long, remove the existing line, and install a new system consisting of a 4-inch Schedule 80 PVC protective sleeve with a 1.5-inch Schedule 80 PVC insert, buried 3 feet below grade. The new piping must be watertight, pressure tested, and installed with a minimum of one cleanout between the road and lift station, capped with a threaded adaptor and plug minimum 12 inches above grade. The contractor shall provide all piping, materials, components, and equipment necessary for connection to both the Hatchery Building septic line and the sewage lift station, and shall install orange safety fencing (minimum 4 feet high with 12-inch standoff) around the open trench. The work must comply with all local, state, and federal laws and regulations.
The period of performance runs from July 1, 2026 through August 31, 2026, with normal duty hours Monday through Friday, 7:00 a.m. to 3:30 p.m. The contractor must be appropriately licensed, accredited, and certified within Montana for septic lines and related systems. The Creston NFH will provide restrooms, electricity, and water to the contractor. Quality control and assurance shall be conducted by designated hatchery personnel, with the hatchery manager serving as the approving authority. Prior to backfilling, the contractor shall verify with the designated U.S. Fish and Wildlife Service representative that the system is fully operational and pressure tested with no leaks. The contractor shall provide all documentation related to piping, materials, components, and drawings. Technical coordinators for the project are Travis Slivka (Project Leader, Creston National Fish Hatchery Complex) and Kristopher Johnson (Facility Management Coordinator and Asset Management Coordinator, U.S. Fish and Wildlife Service, Fish and Aquatic Conservation).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FGA26R0014_Amd_0001.pdf | ||
| A04_SOW_Creston_Replace_Septic_Line.pdf | ||
| Sol_140FGA26R0014.pdf | ||
| B08_Wage_Determination_MT20260032.pdf | ||
| A04_Price_Schedule_Creston_Septic_Line.pdf | ||
| B08_Notice_to_Offerors_Creston_Septic_Line.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Replace Septic line from Hatchery Building to Sewage Lift Station Creston, MT
1. General:
1.1 Creston National Fish Hatchery (NFH), 780 Creston Hatchery Road, Kalispell, MT 59901-
8239. Construction, Replace Septic line from Hatchery Building to Sewage Lift Station.
1.2 Replace Septic line from Hatchery Building to Lift Station - Asset# 10024682 Septic
Tanks and drain fields constructed in 1968 of metal. Due to the proximity to ground water, the sewage line from the Hatchery Building to the sewage lift station buried one foot or less which causes it to freeze. It does have heat tape inside to prevent freezing, but this uses energy and only lasts a few years before it needs to be replaced.
1.3 Contractor Qualifications: The contractor shall be appropriately licensed, accredited, and certified within the state of Montana for the septic lines and related systems.
1.4 The contractor shall follow all associated regulations and laws including: Federal, State, and County.
2. Place of Performance and Period of Performance
2.1 Work shall be performed at Creston National Fish Hatchery (NFH), 780 Creston Hatchery
Road, Kalispell, MT 59901-8239.
2.2 Period of performance July 1, 2026 to August 31, 2026.
2.3 Normal duty hours Monday thru Friday 7:00 a.m. - 3:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 The contractor shall replace the current septic line from the Hatchery Building to the Sewage
Lift Station.
3.2 The contractor shall remove the current septic line, as necessary.
3.3 The contractor shall excavate a trench that is 4 feet in depth and approximately 160 feet in length, distance from the hatchery building to the sewage lift station.
3.4 The contractor shall provide and install a new 4 inch schedule 80 PVC protective sleeve and
1.5 inch schedule 80 PVC insert. The protective sleeve and insert assembly shall be water tight.
The new pipe shall be installed 3 feet below grade from the Hatchery Building to the Sewage lift station approximately 160 feet distance. The pipe shall be installed according to local, state, and federal laws and regulations that apply and pressure tested.
3.4.1 The contractor shall install a minimum of one pipe cleanouts between the road and sewage lift station, and be capped with a threaded cleanout adaptor with plug a minimum of 12 inches above grade. This shall minimize the distance between cleanouts without having any cleanouts on the road.
3.5 Open trench safety. While the trench is open, the contractor shall install orange fencing around the trench to designate the trench as a hazard.
3.5.1 The fence shall be a minimum of 4 feet in height and shall have a minimum standoff of 12 inches on both sides of the trench.
3.6 The contractor shall provide all piping and components necessary to connect the 4 inch
HPDE septic line to the Hatchery Building septic line, and connect the 4 inch HDPE septic line to the sewage lift station.
3.7 Once the system is installed and verified to be operational by the designated U.S. Fish and
Wildlife Service representative, the contractor shall backfill the trench, temping the fill every 24 inch lift.
3.8 The final product shall be completed in accordance with all local, state, and federal laws and regulations pertaining to this project.
4. Deliverables and/or Delivery Schedule:
4.1 The contractor shall provide all piping, material, components, and equipment required to complete this project.
4.2 Contractor shall provide all documentation related to: piping, materials, components, and drawings.
5. Data Management Plan (DMP) N/A
6. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
6.1 Creston NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.
6.2 Identify any limitations. N/A
7. Quality Control/Quality Assurance:
7.1 Quality control and quality assurance shall be conducted throughout the course of project completion by designated hatchery personnel. The hatchery manager will be the approving authority for all completed actions.
7.2 Once the system is completely installed, the contractor shall verify with the designated Fish and Wildlife Service representative, prior to backfilling the excavated trench, that the system is fully operational, according to local, state, and federal laws and regulations.
7.2.1 The system shall be pressure tested priority backfill of trench and ensure that there are no leaks in the system.
8.2.2 The trench shall be backfilled only when the U.S. Fish and Wildlife Service designated representative notifies the contractor that they are satisfied with the system operation.
9. Technical Coordinators:
Travis Slivka
Project Leader
Creston National Fish Hatchery Complex
780 Creston Hatchery Rd
Kalispell, MT 59901
Office: 406-758-6884 travis_slivka@fws.gov
Kristopher “Kris” Johnson
Facility Management Coordinator (FMC)
Asset Management Coordinator (AMC)
U.S. Fish and Wildlife Service
Fish and Aquatic Conservation (FAC)
1380 South 2350 West
Vernal, UT 84078
Cell: 435-299-5150
Office: 435-789-0351 ext. 16 kristopher_b_johnson@fws.gov mailto:travis_slivka@fws.gov mailto:kristopher_b_johnson@fws.gov
File details come from the government source that posted it. Updated .