This document is Amendment 0001 to solicitation 140FGA26R0012, issued by the Fish and Wildlife Service (FWS), General Services Administration (GSA), and Fish and Wildlife Service, General Appropriations Organization Act (GAOA) on March 19, 2026. The amendment incorporates a questions and answers section clarifying project requirements for three units (Units 48, 49, and 50) of a construction or renovation project.

Key clarifications include: concrete replacement is required at window wells on the east side of structures and for Unit 49; no existing footing drains are present; the Government is responsible for mold mitigation on the west basement wall and removal of items (carpeting, firewood) from project areas; only one 12½'x15' window per unit requires replacement (specifically the window sharing wood piles); three external emergency egress doors are required upstairs with stairs matching the entrance vernacular and no concrete ramps needed; staging area location is negotiable with the station; dirt removal is not required immediately after daily cleanup; and the Government is responsible for removing firewood from basement structures. The Period of Performance is May 1, 2026 to September 30, 2026. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
Sol_140FGA26R0012_Amd_0002.pdf PDF
A04_SOW_Leadville_Windows_and_Doors.pdf PDF
B03_WD_CO20260001.pdf PDF
A04_Price_Schedule_Leadville_Windows_Doors.pdf PDF
Sol_140FGA26R0012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Ryan Boisvert

See continuation page

FWS GAOA

FWS, GAOA

5275 Leesburg Pike Falls Church VA 22041

FGA

140FGA26R0012

03/19/2026

03/19/2026

1 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140FGA26R0012/0001

The purpose of this amendment, 0001, is to incorporate the following questions and answers:

Unit 48

Q1) Existing Concrete at window wells on east side of structure. Will we need to replace concrete?

A1) Yes, replacement is required.

Q2) Is there any existing footing drains? Where do we tie the window well drains?

A2) No existing foot drains.

Unit 49

Q3) Concrete replacement as well?

A3) Yes, replacement is required.

Q4) There is Mold on west basement wall who is responsible for the mitigation of it?

A4) The Government. The contractor is not responsible for the mold.

Q5) Carpeting in room on east side firewood in back southwest room are we removing and replacing? Who moves items in these areas?

A5) The Government. The contractor is not responsible for the removal of items.

Unit 50

Q6) Are all 12¿x15¿ windows above washer dryer hookups getting replaced?

A6) Only one window per unit needs to be replaced. The window to be replaced is the window that shares the wood piles.

Q7) Solicitation states 1 each 3 total external emergency egress door. In basements? Or bedrooms up stairs?

A7) Upstairs.

Q8) Do we pour concrete ramps to these doors?

A8) No ramps are needed for this project. The stairs shall match the vernacular of the entrance stairs.

Q9) Is there a Staging area?

A9) There is no specific staging area. The

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140FGA26R0012/0001

staging area can be negotiated with the station to reduce impacts to the station and public.

The staging area will be located adjacent to the project.

Q10) Does the dirt have to be removed immediately upon cleanup after each day?

A10) No.

Q11) Who removes the firewood stacked in the basement of these structures?

A11) The Government. The contractor is not responsible for removing the firewood.

All other terms and conditions remain the same.

Period of Performance: 05/01/2026 to

09/30/2026

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .