This is a Statement of Work for a construction project at the Okefenokee National Wildlife Refuge in Folkston, Georgia, issued by the U.S. Fish & Wildlife Service dated August 26, 2026.

The contractor shall install twelve electrical outlets in the ceiling of Exhibit 101 and Hall 106 of the Visitor Center. All outlets must be installed on a dedicated circuit to allow independent control of exhibit lighting separate from main lighting, utilizing rigid metal conduit (RMC) consistent with existing electrical installation. The exhibit track lighting powered by these outlets will draw approximately 9 amps total. All materials, products, components, and fasteners must be manufactured in the USA with documentation, and the Buy American Act will be strictly enforced. The contractor is responsible for providing all labor, materials, supplies, supervision, and equipment; removing all resulting trash and debris; and coordinating work activities with the refuge and Prime Contractor on an active multi-trade construction site. Submittals must include product specifications, materials, fasteners, finishes, warranties, and Buy American Act compliance documentation, all subject to Government approval. The performance period begins 10 calendar days after issuance of the Notice to Proceed and extends for 90 calendar days. Onsite utilities and facilities will not be provided to contractors or subcontractors. Technical and site questions should be directed to Michael Lusk, Refuge Manager, at (912) 206-6304, while contractual questions should be directed to the Contract Specialist.

View the file

Other files

File Type Posted
Past_Performance_Survey.docx DOCX document
B08_-_Wiring_Scematics.pdf PDF
B03_-_Service_Contract_Act_WD_2015-4517.pdf PDF
Sol_140FF027Q0028.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Okefenokee NWR Construct VC 1 of 2 August 26, 2026

STATEMENT OF WORK

Construct Visitor Center

Okefenokee National Wildlife Refuge – Folkston, GA

1. General

a. The Contractor shall supply all material, labor, supplies, supervision, and equipment to accomplish the following Statement of Work.

b. Provide and install the ceiling electrical outlets listed herein on the Okefenokee National Wildlife Refuge Visitor Center in Folkston, GA.

c. All materials, products and components used to complete this project shall be made in the USA with documentation. The Buy American act will be strictly enforced.

d. Contractor shall remove all resulting trash and debris from work performed.

e. Contractor will be required to work within and around an active construction site with multiple trades.

Coordination with refuge and Prime Contractor will be required.

2. Construction Program

a. Add (12) electrical outlets in Exhibit 101 and Hall 106 ceilings according to the attached dimensioned ceiling plan layout.

b. Install the (12) electrical outlets on their own circuit, so refuge can turn Exhibit lighting off separately from main Exhibit lighting.

c. The (12) electrical outlets will need to be installed in RMC, similar to current electrical installation.

d. The Exhibit track lighting utilizing these (12) outlets will use approx. 9 amps total.

3. Submittals

a. All submittals shall be based on Statement of Work and are subject to Government approval.

b. Submittals to include product, material, fasteners, finishes, warranties, Buy American Act and any item COR deems required for project completion.

PERIOD OF PERFORMANCE

Period of performance beginning 10 calendar days from the Notice to Proceed: 90 Calendar days.

* Onsite utilities and facilities will not be available under this contract to contractors and subcontractors.

Okefenokee NWR Construct VC 2 of 2 August 26, 2026

PROJECT CONTACTS

3.1. Questions regarding the Site shall be directed to:

U.S. Fish & Wildlife Service Okefenokee National Wildlife Refuge Folkston, Georgia Contact: Michael Lusk – Refuge Manager Telephone: (912) 206-6304

3.2. Questions regarding the scope of work and technical matters shall be directed to:

U.S. Fish & Wildlife Service Okefenokee National Wildlife Refuge Folkston, Georgia Contact: Michael Lusk – Refuge Manager Telephone: (912) 206-6304

3.3 Questions regarding contractual items shall be directed to:

U. S. Fish & Wildlife Service Contact: Contract Specialist

Telephone:

END OF STATEMENT OF WORK