Sol_140FC324R0005_Amd_0002.pdf
PDF 95 KB Posted
- Attached to
- AK SELAWIK NWR STORAGE FACILITY Federal contract opportunity
- Solicitation number
- 140FC324R0005
About this file
This document is an amendment to Solicitation Number 140FC324R0005 for the AK Selawik NWR Storage Facility project. The amendment provides clarifications and answers to several questions regarding the project specifications, including:
- The specification for finishing a gym slab on grade is not applicable to this maintenance shop floor project.
- The pultruded grating specification is a basis of design, not a mandated manufacturer.
- There is no specified minimum number of years of experience required for the roof installers.
- The back side of access panels that would be visible when opened should be painted.
- Concrete hardstand is an acceptable alternative to the specified asphalt pavement.
- Structural engineering does not need to be provided by the general contractor's management team, but can be subcontracted.
- The contractor is responsible for completing the design, as the provided conceptual design is not fully developed.
- Door hardware specifications and details will be provided in Section 08 1113.
The solicitation is for a construction project with a magnitude of $1M to $5M, to be performed from June 2024 to December 2025 for the U.S. Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC324R0005_Amd_0001.pdf | ||
| Sol_140FC324R0005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140FC324R0005
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
FC3
Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS, Construction A/E Team 3
FC3
Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS Constr A/E 3
04/12/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/12/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Magnitude of Construction is $1M to $5M.
4. Specification Sections 03 3000 3.07; D speaks to finishing and references tolerances a gym slab on grade. Is this a typo? The reference pertains to the maintenance shop floor?
Answer: Part b does not apply to this project. The spec listed in part A (which is less of a tolerance is acceptable for a garage floor slab.
5. Specification Section 06 6100 3.01; A speaks to Pultruded grating manufacturer. Is
Fibergrate Composite Structures the basis of design or the mandated manufacturer?
Answer: This is the basis of design. The contractor will not be mandated to use a specific manufacturer only provide a product that meets or exceeds the basis of design in the specs.
6. Specification Section 07 4113 1.05; B speaks to the installers number of years
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Anthony Kuntz
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140FC324R0005/0002
documented experience. What are the number of years?
Answer: Installer number of years was not specified in the specs. As long as manufacturer¿s installation instructions are followed and all performance specifications are met for the roof, FWS will not require a specific number of years experience for the installers.
7. Specification Section 09 9000 3.01; B -6 speaks to surfaces to be finished. Please confirm that the back side of access panels are to be painted?
Answer: I believe this specification is regarding doors and covers which when opened would be visible. Please paint the back side of panels that would be visible when opened.
8. Specification Section 32 12 16, Drawing Sheets C2.0 & C3.0 Detail #2 Speak to Asphalt Cement
Pavement. Is a concrete hardstand an acceptable alternative to Asphalt?
Answer: Yes concrete hardstand is an acceptable alternative to asphalt as long as it will be designed to meet the same loads/forces.
9. Factor 2 Technical Capabilities and Ability to Deliver asking for the GC Management Team and identifying the Key Personnel. Is a Structural
Engineer required to be part of the GC team?
Answer: The facility will need to be properly designed. If a pre-engineered building is to be used the building manufacturer may provide the structural engineering and this is acceptable.
Structural Engineering will need to be completed by a structural engineer but does not necessarily need to be part of the General Contractor
Management team. This effort could be sub-contracted as well.
10. Drawing Sheet S2.2 speaks to W Beam / Steel Joist spacing to be determined. Will PND provide that information prior to the submission date?
Answer: PND was only contracted to provide conceptual level design. The contractor awarded this project is fully responsible for completing the design work.
11. The Design Development (at 35%) on the Selawik Maintenance Shop Technical Qualifications
& Ability to Deliver is clear in speaking to the
Contractor¿s Management Team identifying key personnel/positions for the FWS review.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140FC324R0005/0002
Is ECI the FWS Architect concerning the
Maintenance Facility?
Is PND the Structural Engineer concerning the
Maintenance Facility?
Answer: PND was contracted to complete a conceptual level design. PND hired ECI to assist with the effort. The conceptual level design has been completed and those firms are no longer under contract to assist with the design.
We do not see a Door Hardware Section or Schedule.
Will one be provided?
Answer: Contractor is required to follow specifications Section 08 1113 for Doors. FWS can approve alternatives if requested by the
Contractor. Door sizes and locations are shown in conceptual design.
All other terms and conditions remain unchanged.
Period of Performance: 06/21/2024 to 12/30/2025