140FC226Q0035_Question_and_Answers_0001.docx

DOCX document 15 KB Posted

Attached to
RI-NINIGRET NWR-REHAB MULTIPURPOSE BLDG
Solicitation number
140FC226Q0035
Issued by

About this file

This is a Questions and Answers document for solicitation 140FC226Q0035, issued by the Department of the Interior Fish and Wildlife Service for the rehabilitation of a multipurpose building at Rhode Island's Ninigret National Wildlife Refuge.

The document addresses two clarifications regarding construction specifications: (1) regarding cement work, contractors may add dye or color to match existing cement, with the requirement that remaining (existing) cement remain in place; and (2) regarding building front flashing where siding meets lower roof areas, no flashing replacement is required as the flashing is located at metal roof areas that are outside the scope of this contract. This Q&A document does not address pricing, response dates, award dates, or other contractual terms.

View the file

Other files

File Type Posted
Sol_140FC226Q0035_Amd_0001.pdf PDF
B03_Wage_Determination.pdf PDF
A04_SOW.docx DOCX document
Sol_140FC226Q0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140FC226Q0035 Question and Answers

1. For the cement - should there be dye/color added to match remaining cement?

Answer: For the cement, a dye could be added to match the remaining cement. The remaining (existing) cement shall be left in place.

2. On the front of the building, where the siding meets the lower roof areas, should that flashing be replaced and if so should it be green?

Answer: On the front of the building, where the siding meets the lower roof areas, the flashing does not require replacement. The flashing is at the metal roof areas, where the metal roofing is not a part of this contract.