Question_and_answers_for_140FC225Q0049_0002.docx
DOCX document 15 KB Posted
- Attached to
- BOAT DOCK REPLACEMENT Federal contract opportunity
- Solicitation number
- 140FC225Q0049
About this file
This document is a Questions and Answers file for Solicitation 140FC225Q0049, a Boat Dock Replacement project for the Upper Mississippi National Wildlife Refuge. The Q&A addresses two specific technical details about the dock installation: contractors are permitted to use 3 1/2 inch pipe with an auger point for securing the dock to the water bottom, and the ramp will not include floatation at this time. The solicitation is issued by the Department of the Interior Fish and Wildlife Service, indicating this is a federal infrastructure improvement project for a national wildlife refuge boat dock facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC225Q0049_Amd_0002.pdf | ||
| Sol_140FC225Q0049_Amd_0001.pdf | ||
| A04_Amended_SOW_Long_Lake_Dock_Replacement_0001.pdf | ||
| A04_SOW_Long_Lake_Dock_Replacement.pdf | ||
| B03_WD.pdf | ||
| A06_Specs.pdf | ||
| Sol_140FC225Q0049.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and answers for 140FC225Q0049, Upper Mississippi NWR Boat Dock
In response to the question about using 3 1/2 inch pipe with auger point instead of 4 inch pipe?
1. Contractors can use 3 ½ inch pipe that augers in for securing the dock to the water bottom.
Question about floatation on the ramp:
1. Ramp will not have floatation at this time.