Q_A_0001.docx

DOCX document 15 KB Posted

Attached to
WATER WELL DRILLING - PA Federal contract opportunity
Solicitation number
140FC224R0005
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document contains questions and answers regarding a federal solicitation for water well drilling services in Pennsylvania. The solicitation seeks a contractor to drill up to 300 linear feet to achieve a required output of 40 gallons per minute. Clarification was provided that steel casing can be used in place of PVC, perforated pipe is acceptable for well screens, and the well is simply a water well rather than an artesian well. A 12-24 hour pump test with full water quality testing is requested to meet standards. Drilling outflow into a catch basin is permitted.

View the file

Other files for this federal contract opportunity

Other files attached to WATER WELL DRILLING - PA, newest first.
File Type Posted
Sol_140FC224R0005_Amd_0001.pdf PDF
B08_Quote_Schedule.pdf PDF
B08_SOW.pdf PDF
Sol_140FC224R0005.pdf PDF
B08_Past_Performance_Survey.doc DOC document
B08_Wages.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

In consideration of the subject matter, we kindly request your esteemed consideration for the possibility of providing some additional information to facilitate our ability to meticulously formulate a comprehensive and tailored proposal that aligns perfectly with the distinct requirements. After conducting the site visit, we would like to request a clarification regarding the following :

· Regarding the requirement of PVC casing, we very rarely ever use PVC casing due to the fact you can’t push on PVC casing, if we need to push on casing due to any borehole collapsing , we typically use steel casing, does well have to be PVC casing?

Answer: steel casing may be used.

· Regarding the wire wrapped screen, it wouldn’t adapt well with PVC casing.

Answer: Perforated pipe may be used for the well screen.

· Specs ask for an artesian well which we wouldn’t have known control over that happening.

Answer: It is just a water well.

· Due to the water quality standards asked for, do you want the same 12 or 24 hour pump test with full lab testing like done for a non-transient community well or is the 2 hour pump test ok for standards asked for with a ecoli ,coliform, nitrate , nitrite, turbidity , iron , ph. , hardness test sufficient for the water quality standards asked for?

Answer: 12 or 24 hour pump test is requested.

· Is outflow from drilling ok going into channeled area that is leading to catch basin?

Answer: Yes.

· Test well is listed lump sum is there a maximum depth footage you are willing to drill to try to achieve the 40 GPM in the event we don’t hit 40 GPM?

Answer: Drill up to 300 linear feet.

File details come from the government source that posted it. Updated .