This document is an Amendment 3 - Questions and Answers for the Agassiz NWR Rodahl Trail 140FC224Q0032 contract opportunity. The key details are:
The contractor is not required to seed or blanket the in-slopes when finished topsoiling. The slope should be approximately 3:1 and only needs to be repaired where stumps will be removed and in any other degraded areas. The contractor does not need to remove or pile up the existing stumps and trees that have been laid along the toe of the back slope across the ditch.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC224Q0032_Amd_0003.pdf | ||
| Sol_140FC224Q0032_Amd_0002.pdf | ||
| Sol_140FC224Q0032_Amd_0001.pdf | ||
| Amendment_1__0001.pdf | ||
| Sol_140FC224Q0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Agassiz NWR Rodahl Trail 140FC224Q0032
June 17, 2024
Amendment 3 – Questions and Answers
1. Will contractor need to seed and blanket the in-slopes when they are finished topsoiling?
What seed mix would be specified? A: No reseeding or blankets required.
2. The contractor observed that the slope on both sides of the road needed to be shaped, is this what the government is requesting?
Would the road shape in question be a 3/1 or 4/1 grade on the in-slope? A: Slope should be approximately 3:1. Slope just needs to be repaired where stumps and will be removed and any other degraded areas.
3. While reviewing the project, contractor found only one large tree on the in-slope but lots of stumps and trees that have already been removed laying on the toe of the back slope across the ditch. Do these stumps and trees need to be removed and piled up on the north side of the road location designated by the Agassiz NWR Project Manager? A: Trees along the other sides of ditches do not need to be moved