This solicitation is seeking proposals to replace approximately 3,000 square feet of existing cement board siding with smart siding at the Arrowwood National Wildlife Refuge in Pingree, North Dakota. The work is project #24-025 for the US Fish and Wildlife Service. Proposals are due by March 8, 2024 at 5:00 pm EST and must be submitted via email to john_ferrall@fws.gov with the subject line "Proposal Submission-140FC124R0034." This is a 100% small business set-aside with a NAICS code of 236220 and size standard of $45 million. The award will be made using Lowest Price Technically Acceptable evaluation based on price and technical acceptability being equally weighted. The contractor must be registered in SAM prior to award. Questions are due by February 27, 2024 and must be submitted in writing to john_ferrall@fws.gov.

View the file

Other files

File Type Posted
Arrowwood_West_Front_0001.jpg JPG image
Diamond_Kote_CertainTeed_Weather_Boards_0001.pdf PDF
Arrowwood_North_Side_0001.jpg JPG image
Arrowwood_East_Back_0001.jpg JPG image
Arrowwood_South_Side_0001.jpg JPG image
Sol_140FC124R0034.pdf PDF
A04_Arrowwood_NWR_SOW_.pdf PDF
WD_ND20240030_Building_Stutsman_County_01-05-2024.pdf PDF
A06_Drawings_-_24-025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140FC124R0034

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

FC1

Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Tea FWS, Constr A/E 1

24-02503/01/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/16/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment (0001) is to address Request for Information (RFI) questions.

RFI 01: We request that this requirement be removed or not required until after award.

2. PART II, TECHNICAL/PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

1.(c) Provide a copy of the Construction Contractor License (with the exact name of your business name) that is registered with the State of North Dakota.

CS Reply: The solicitation requirement will not be changed per 52.236-7 Permits and

Responsibilities. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any

Federal, State, and municipal laws, codes, and regulations applicable to the performance of

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rey F. Aragon

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140FC124R0034/0001

the work.

RFI 02: Please confirm if permits will be required for this project, and would it be possible for photos of the building exterior be uploaded to the solicitation posting.

COR Reply: The COR has advised that to his knowledge no special permits should be required for this project (but FAR 52.236-7 is included in the solicitation if permits are necessary). Exterior photos attached.

RFI 03: The scope states approximately "3000" square feet (sf) and the building plans state approximately "4,000" square feet (sf). Photos would be helpful at providing an accurate proposal.

COR Reply: The SOW should be for 4,000 sf of siding replacement, or the whole building.

Exterior photos attached.

RFI 04: Is soffit & fascia part of the replacement?

COR Reply: No

RFI 05: The SOL states a performance bond requirement. What is the percentage required?

CS Reply: There is no Performance Bond required for this project. Only a Payment Bond (at 100%) is called out and required in/for the solicitation.

RFI 06: Are there any specifications for the type of Smart Siding desired? It looks like the manufacturer is LP Building Solutions, but they have several styles, textures, and thicknesses to choose from including lap siding, shakes, and panel & vertical siding. Pricing will vary depending on what product is chosen. Do you have some direction on this?

Facility/COR Reply: The siding will be lap siding

LP Smart siding. Diamond Kote is the product that the three contractors that completed on sites have mentioned and I concur with that product

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140FC124R0034/0001

choice.

RFI 07: I would assume the current cement fiber siding does not contain asbestos, correct?

Facility/COR Reply 2. Current cement siding is 11 years old and is not manufactured with asbestos.

RFI 08: If rotted or deteriorated framing or sheathing is discovered, will the contractor be able to request a change order for these repairs?

CS/Facility/COR Reply: Yes (CS), but rotted sheeting and framing is not anticipated

(Facility/COR).

RFI 09: The SOL & SOW states approximately 3,000 sf of siding to remove/replace and the plans show approx. 4,000 sf as shown on Plan Sheet A4.1.

Just double checking that the 4,000 SF is the more accurate quantity as shown on the drawings.

COR Reply: The SOW should be for 4,000 sf of siding replacement, or the whole building.

RFI 10: We would like to clarify what LP Smart

Siding is being utilized, will it be on-site painting, Expert Finish, or Diamond Kote? These finishes are progressively more expensive but also more durable. This will affect our pricing.

Facility/COR Reply: The siding will be lap siding

LP Smart siding. Diamond Kote is the product that the three contractors that completed on sites have mentioned and I concur with that product choice.

Reminder all trim on windows, doors and corners stays in place. This contract is only for removal and replacement of horizontal lap siding.

RFI 11: We have concerns regarding SIPs construction with building wrap and lap siding directly over the building wrap, especially with all the nail holes present post removal of existing siding. A well-sealed SIPs panel is important for longevity, as is air movement and water drainage behind siding for product longevity. Our recommendation is to remove all the building wrap and install a self-adhered WRB with drainage space, such as Benjamin Obdyke¿s

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140FC124R0034/0001

Hydrogap SA. However, this will add to the cost of the project. Should we add this as an optional line item to the base bid?

Facility Reply: I would recommend they put it as an option (in addition to the traditional wrap that is currently on the building).

RFI 12: SOW states to utilize smart siding, there are multiple products that vary in pricing.

Please confirm a standard LP Smart Side product is the desired material.

Facility/COR Reply: The siding will be lap siding

LP Smart siding. Diamond Kote is the product that the three contractors that completed on sites have mentioned and I concur with that product choice.

Proposal submittal due date remains as March 8, 2024, 5:00 pm EST.

END OF AMENDMENT 0001

Period of Performance: 04/01/2024 to 05/28/2024