This document contains clarifications and additional details regarding a federal solicitation to replace a geothermal pump at the Tewaukon National Wildlife Refuge. The solicitation seeks a contractor to provide and install a new geothermal pump, dispose of any materials removed, and make any necessary electrical or piping changes depending on the selected pump. Clarifications include additional photos of the work area, information that piping changes will depend on the chosen pump and contractors can schedule site visits, confirmation that the existing piping material is PVC Schedule 40, and noting that electrical work scope will also depend on the selected pump. The opportunity is issued by the U.S. Fish and Wildlife Service for the Department of the Interior.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC124Q0010_Amd_0003.pdf | ||
| Work_Area_Photo_2_0002.JPG | JPG image | |
| Work_Area_Photo_3_0002.JPG | JPG image | |
| Work_Area_Photo_8_0002.JPG | JPG image | |
| Sol_140FC124Q0010_Amd_0002.pdf | ||
| Work_Area_Photo_1_0002.JPG | JPG image | |
| Work_Area_Photo_5_0002.JPG | JPG image | |
| Work_Area_Photo_7_0002.JPG | JPG image | |
| Work_Area_Photo_4_0002.JPG | JPG image | |
| Work_Area_Photo_6_0002.JPG | JPG image | |
| Clarifications_AMD_0001_0001.pdf | ||
| Sol_140FC124Q0010_Amd_0001.pdf | ||
| B08_-_Bid_Schedule.pdf | ||
| Sol_140FC124Q0010.pdf | ||
| B03_-_DOL_Wage_Requirement_(1-24-24).pdf | ||
| B08_-_Statement_of_Work_24-007_RO.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarifica ons Amendment 0002
Clarifica ons in Blue
1) Can you provide more pictures of the outside of the building and the inside of the building, showing more views?
a) The project is to replace the geothermal pump and does not impact any other parts of the building. 8 images/photos have been attached to provide additional detail of the work area.
i) Attachments: Work Area Photo (1-8)
2) Can more information be provided about upsizing the pipes for the larger unit. How much piping, what sizes, materials, are their any drawings showing this so we can do a proper takeoff?
a) The pipping change may depend on the pump installed by the contractor. Contractors can schedule a site visit to understand the nature and conditions of the work
3) What is the existing material type of the existing pipe?
a) PVC Schedule 40
4) What is the electrical scope for this project?
a) The electrical changes to the distribution system may be needed depending on the pump installed by the contractor.