- AMENDMENT 1 - VISITOR SERVICES BRANCH-SIGN PROJECT Federal contract opportunity
- Solicitation number
- 140F1B23Q0013
About this file
This amendment to a solicitation seeks quotes for the design, fabrication, and shipping of 308 entrance signs for National Visitor Services. Quotes are requested by the U.S. Fish and Wildlife Service Visitor Services Branch in Falls Church, Virginia and shall be submitted via email by June 19, 2023. The requirement is set aside for small businesses classified under NAICS code 339950 for sign manufacturing with a size standard of 500 employees. Questions may be asked through June 1st. Offerors must comply with instructions for electronic invoicing and be registered in the System for Award Management. The amendment provides responses to ten questions seeking clarification on issues including painting sign edges, modifications and stipulations for quoting, payment terms, artwork, sign post requirements, alternative materials, and whether installation is included.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_2_Wage_Grade_Determination.pdf | ||
| Atch_1_SOW.pdf | ||
| Atch_3_52_212-3_Offeror_Representations_and_Ce___cial_Products_and_Commercial_Services.pdf | ||
| Sol_140F1B23Q0013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F1B23Q0013 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F1B
Falls Church VA 22041 5275 Leesburg Pike FWS Construction & A/E - BIL/Disaster FWS Construction & A/E - BIL/Disast
F1B
Falls Church VA 22041 5275 Leesburg Pike FWS Construction & A/E - BIL/Disast FWS Infrastructure
05/19/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/19/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
LIST OF CHANGES:
Period of Performance: 09/01/2023 to 08/31/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tina Baker
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation 140F1B23Q0013 Amendment 0001 Questions (Q) and Answers (A):
Solicitation Closes: 6/19/2023
Q1: When printing the regular Brown and the new Blue plywood signs for the kick/start program we always paint the edges on all the signs and the backs of the single sided signs either blue or brown. Would that be the same for this quote?
A1: Yes, we would want the sides/backs painted.
Q2: We are going to bid this project with some modifications and stipulations as it would be impossible to forecast exact shipping costs, raw material costs and supply chain issues so far in advance. Would a formal quote with details attached be acceptable?
A2: This will be a firm fixed price contract. There will be no price escalations or requests for equitable adjustments after award. Contractor shall ensure their quote adequately covers shipping costs and raw material costs. There does not seem to be major supply chain issues at the current time. Should there be supply issues after award, that issue will be considered at that time. Per the statement of work in the solicitation, contractor shall ship all signs not later than 11 months after award and all signs must be received by the station not later than one year from date of award.
Q3: Would a partial payment be made to the awarded vendor once approved for production?
A3: No; payment will be made for work completed, after it is completed and inspected (no damages) and received by the government.
Q4: Once shipments begin to the sites would monthly invoicing be allowed?
A4: Monthly invoicing is allowed but only for work completed, inspected and received by the government.
Q5: As we produced all of the new Blue Entrance signs, we have on file all of the full color animal images. If there are new ones will the artwork be created and sent to us?
A5: We will provide all animal artwork.
Q6: Sign Post Frangibility. After reviewing the USF&WS sign handbook, request frangibility (breakaway) requirements for each of the signs needed. According to the handbook, signs 30 feet of a public access road using metal posts should have a breakaway design.
A6: This contract does not include posts.
Q7: Materials for Posts. Is aluminum an acceptable alternative to wood for all posts?
A7: This contract does not include posts, only the signs.
Q8: Overall height of posts. Shall we assume the length of signpost is the ground for the footer is 30”? Please advise if any signage is to be installed on a steep incline and thus require more post length than a level installation.
A8: This contract does not include posts.
Q9: HDO Plywood Sign Faces. For improved weather resistance and durability, will you consider alternatives such as aluminum composite material (ACM), PVC or acrylic? These alternative materials can hold paint longer when exposed to harsh environments and are much more resistant to moisture than the plywood.
A9: No; we are only looking for the sign materials specified in the scope of work.
Q10: I am reviewing the solicitation and documents, but I cannot determine if installation of the signs is included in the contract. Could you help clarify this question please?
A10: Installation is not included, nor a part of this contract. Per the Scope of Requirement in the Statement of Work, contractor is responsible to design, fabric and ship 308 entrance signs.