This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Fish and Wildlife Service (FWS) Over GSA Schedule contract vehicle. The amendment number is 0001, effective date August 12, 2026, and references solicitation number 140F0S26Q0046, dated August 5, 2026. The amendment is not extended. The contracting office is located at 5275 Leesburg Pike, Falls Church, VA 22041.
The purpose of this amendment is to provide Questions and Answers clarification for a survey contract with a performance period from October 1, 2026 to December 31, 2028. Key clarifications address: (1) site selection methodology mixing IMMP-identified sites with additional sites to capture habitat variety; (2) treatment of 2027 and 2028 as separate survey seasons with potentially different site locations; (3) authorization to purchase equipment such as stakes, flagging tape, and spray paint for marking sampling plots; (4) permission to place temporary plot delineation markers that must be removed at season end and cannot be placed within 30 feet of roadways or 60 feet of maintained levee roads; (5) inclusion of all federal travel costs (mileage, hotels, per diem) in site cost estimates; (6) requirement to budget for meander walk surveys with blooming plants under IMMP 1A; and (7) submission requirement via email to Joni_Dutcher@ios.doi.gov prior to close date. Key contacts include Contracting POC Joni Dutcher and Technical POC Kaylene Keller (916) 212-8038.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0S26Q0046.pdf | ||
| B08_Attachment_1_Subcontracting_Plan.pdf | ||
| B08_Attachment_2_QASP.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Joni Dutcher
See continuation page
FWS Over SAT G/S FWS, Over SAT G/S 5275 Leesburg Pike Falls Church VA 22041
F0S
140F0S26Q0046
08/12/2026
08/05/2026
1 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140F0S26Q0046/0001
The purpose of this amendment is to provide
Questions and Answers:
1. Is there an emphasis to complete IMMP priority sites that fall within the refuge boundaries? Looking at the IMMP Site Selection
Tool it looks like there¿s approximately a dozen medium or high rated points that fall within the refuge in Site 4790. Are these the refuge¿s first priority, with any additional
San Luis points being added to these already designated sites?
a. The IMMP random sites identified in the Site
Selection Tool will be considered for the surveys. We will most likely have a mix of the
IMMP identified sites along with additional sites to capture the variety of habitat available at the refuge. The final selection of sites will occur once the number of sites that can be surveyed under this contract is known.
2. I wanted to get clarity that a single site would not need 4 monthly 1A/3 visits in 2027 and again in 2028. So, there will likely be different sets of sites in 2027 and 2028.
a. For the purposes of estimating the number of sites that can be surveyed, we will be treating season 2027 and 2028 as separate. For example, if it is estimated that 50 sites can be done, 25 in 2027 and 25 in 2028. These might end up being 50 unique locations or some locations might show up in both 2027 and 2028. For estimates we are just looking for the total number of survey sites (ie 50).
3. Are we able to purchase equipment under this grant? For example: stakes, flagging tape, spray paint, etc. to demark sampling plots.
a. Yes equipment can be purchased and should be part of the cost calculations.
4. Can we set out temporary structures such as stakes or pin flags to delineate plots that can stay in place between visits? Having premarked boundaries/transects can speed up subsequent visits to plots.
a. Yes, markers can be left to delineate plots
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140F0S26Q0046/0001 but will need to be removed at the end of each season. They cannot be placed within 30-feet of a roadway or within 60 feet of a maintained levee road.
5. Are we able to incorporate costs for mileage, hotels, per diem under federal rates for our proposal?
a. All travel costs using federal rates should be included in the site cost estimate.
6. Under IMMP 1A is the recommended but optional meander activity. Should we budget for completing the meander activity as part of our time/cost estimates?
a. Yes include the meander walk survey with option A for just the blooming plants.
7. Finally, should the completed application packages be emailed to you for final submission? Or is there a submission portal that I¿ve missed?
a. Yes, all submissions shall be emailed to
Joni_Dutcher@ios.doi.gov prior to the close date and time.
Contracting POC: Joni Dutcher, email:
Joni_Dutcher@ios.doi.gov
Tech POC: Kaylene Keller, phone: (916) 212-8038
Alt POC: Kara Moore-O'leary, phone: (916)
533-1066
Period of Performance: 10/01/2026 to
12/31/2028
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .