B08_-_ATT_3_-_MAP_SMR_Rd_122_C_D_E_F_Road_Base_Project_0002.pdf

PDF 18 MB Posted

Attached to
FL-ST. MARKS NWR-ROAD MATERIAL Federal contract opportunity
Solicitation number
140F0S25Q0031
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This image is a Google Earth map depicting two road base projects for SMR Rd 122 C,D,E,F. The project is divided into two phases: Phase one (in red) covers Rd 122 C/D Road Base Project scheduled to begin on 9/1/25, and Phase two (in cyan) covers Rd 122 E/F Road Base Project scheduled to start on 10/6/2025. The map shows the geographic layout of these road projects in a rural or forested area, with project sections marked in different colors, intersecting with US Highway 98, and spanning approximately 2 miles according to the scale provided. The map includes a legend identifying the different road segments and is dated 2025.

View the file

Other files for this federal contract opportunity

Other files attached to FL-ST. MARKS NWR-ROAD MATERIAL, newest first.
File Type Posted
Sol_140F0S25Q0031_Amd_0003.pdf PDF
Sol_140F0S25Q0031_Amd_0002.pdf PDF
Sol_140F0S25Q0031_Amd_0001.pdf PDF
B08_-_Solic_140F0S25Q0031_-_0044024223_-_Road_Material_FL.pdf PDF
Sol_140F0S25Q0031.pdf PDF
B08_-_ATT_2_-_FDOT_Standard_Specs_for_Road_and_Bridge_-_1339_pgs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMR Rd 122 C,D,E,F Red is Rd 122 C/D Road Base Project Phase one 9/1/25

Cyan is Rd 122 E/F Road Base Project Phase two 10/6/2025

Legend

RD 122 C/D

SMR Rd 122 E/F

2 mi

N

N © 2025 Google

© 2025 Google

© 2025 Google

Image © 2025 Airbus

Image © 2025 Airbus

Image © 2025 Airbus

File details come from the government source that posted it. Updated .