This document outlines the requirements for a fuel reduction contract across multiple units located on federal lands. The contractor will be required to complete various fuel reduction tasks across nine treatment units totaling approximately 1,000 acres located in Burnet and Travis Counties, Texas. Tasks include cutting juniper and other brush and tree species, slashing cut trees, fence line clearing, slash pullback, understory thinning to establish shaded fuel breaks, machine and hand piling of slash, and chipping or grinding of accumulated slash. The contractor must abide by all applicable federal, state, and local regulations and laws, use proper safety and sanitation practices, protect environmental and natural resources, and report all accidents or incidents to the contracting officer's representative. The purpose of the contract is to reduce hazardous fuels and protect lands from wildfire under solicitation number 140F0S23Q0050 for the Balcones Fuel Reduction project, issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0S23Q0050_Amd_0001.pdf | ||
| Sol_140F0S23Q0050.pdf | ||
| B08_Attch_1_SCA_Rates.docx | DOCX document | |
| B08_Attch_2__Past_Performance_Questionnaire_(PPQ)_Template.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TREATMENT TASK WORKSHEET
Unit Name: Peaceful Springs House
Unit size: 59 Ownership: Refuge
Location: Burnet County
Contract Project Tasks to be completed:
A.1 Cutting Juniper
A.2 Cutting of Other Tree and Brush Species
A.3 Cutting of Shinneries
A.4 Slashing of Cut Trees
A.5 Fence Line Clearing
A.6 Slash Pullback
A.7 Understory Thinning - Shaded Fuel Break (SFB)
A.8 Understory Thinning
A.9 Machine-Piling of Slash
A.10 Hand-Piling of Slash
A.11 Chipping or Grinding of Accumulated Slash
Comments: Moderate juniper, unit is accessible and can be extremely rocky.
Unit Name: Peaceful Springs Plateau
Unit size: 172 Ownership: Refuge
Comments: Moderate juniper, unit is accessible and can be extremely rocky.
Unit Name: Mckeever East
Unit size: 171 Ownership: Refuge
Location: Travis County
Comments: Heavy juniper.
Unit Name: Travis Peak South
Unit size: 84 Ownership: Private
Comments: Scattered juniper
Unit Name: Travis Peak North
Unit size: 178 Ownership: Private
Comments: Moderate to heavy juniper
Unit Name: Rust Plateau
Unit size: 29 Ownership: Refuge
Comments: Heavy juniper
Unit Name: 3 Creeks Plateau
Unit size: 223 Ownership: Refuge
Comments: Moderate to scattered juniper
| Fuel Reduction Contract PWS (2023).pdf |
| PERFORMANCE WORK STATEMENT (PWS) |
| 2. DEFINITIONS AND ACRONYMS: |
| 2.1. DEFINITIONS: |
| 2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime. |
| 2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government. |
| 2.1.3. Technical Representative (TR). An employee of the U.S. Government appointed by the contracting officer to represent the government on site. Such appointment shall be in writing and shall state the scope of authority and limitations. This indivi... |
| 2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement. |
| 2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non- manufactured things such as meeting minutes or reports. |
| 2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation facto... |
| 2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property. |
| 2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards. |
| 2.1.9. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirement. |
| 2.1.10. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor. |
| 2.1.11. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract. |
| 2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise. |
| 2.2. ACRONYMS |
| 3. GOVERNMENT FURNISHED ITEMS AND SERVICES: |
| 4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: |
| 5. SPECIFIC TASK: |
| Some of the fuel reduction tasks vary between each treatment unit. The contractor will conduct an initial site visit with refuge staff ensure proper identification of each area to be treated, tasks to be performed, and access to the work area. |
| 5.1. Fuel Reduction Tasks |
| The following is a list of the contract project tasks that are to be completed by the contractor. PLEASE NOTE: for each treatment area, a Task Worksheet will be completed. Only the tasks identified on the Treatment Task Worksheet are to be performed ... |
| 5.1.1. CUTTING JUNIPER. The contractor shall completely cut juniper trees and saplings, as summarized: |
| 5.1.2. CUTTING of OTHER BRUSH and TREE SPECIES. The contractor shall completely other species of trees and/or brush, as summarized: |
| All saplings, small trees, and brush species less than four inches (<4.0 inches) in diameter. |
| All juniper trees less than 36 inches tall. |
| Maximum stump height shall not exceed 6.0 inches tall. |
| 5.1.3. CUTTING of SHINNERIES. The contractor shall completely cut woody vegetation within units designated as shinneries as summarized: |
| All woody species greater than (>) 36 inches tall. |
| Maximum stump height shall not exceed 6.0 inches tall. |
| 5.1.4. SLASHING of CUT TREES |
| All limbs remaining on cut juniper trees shall be slashed from the bole so that the remaining tree shall have no part greater than 36 inches from the ground. |
| 5.1.5. FENCE-LINE CLEARING: The contractor shall completely cut, slash, and remove all unwanted trees and brush along (and in) the fence-lines, as summarized: |
| All trees and brush shall be completely cut and severed along (and in) the fence-line. |
| All trees, branches, and brush must be removed from the fence-line. |
| All accumulated slash and brush shall be pulled back and removed from the fence-line a minimum of ten feet. |
| 5.1.6. SLASH PULLBACK. The contractor shall move and relocate accumulated slash away from designated No-Cut trees, fence-lines, roads and trails, buildings, etc. These areas will be designated by the government on the site map. Slash pullback can be ... |
| Slash will be pulled back a minimum of 10 feet from the designated unit perimeters, fence lines, utility lines, and buildings. |
| Slash will be pulled back a minimum of 5 feet from the designated roads and trails. |
| Slash will be pulled back a minimum of 10 feet from drip line of the designated trees. |
| Pulled slash will be scattered and not piled. This will require areas with heavy slash to be pulled a greater distance so that no piling occurs and all slash is exceeds the minimum pull back requirements. |
| Exception will require COR approval on case by case basis depending on the availability of open areas for the piled slash. |
| 5.1.7. UNDERSTORY THINNING – Shaded Fuel Break (SFB). The contractor shall follow and comply with the following criteria and requirements for establishing shaded fuel breaks (SFBs). They are as summarized: |
| 5.1.8. UNDER STORY THINNING. The contractor shall follow and comply with the following criteria and requirements for establishing shaded fuel breaks (SFBs). They are as summarized: |
| 5.1.9. MACHINE-PILING of SLASH. The contractor shall hand-pile or machine-pile the accumulated slash on the treatment units, as summarized: |
| Slash piles shall not exceed 15 feet in height. |
| Slash piles shall not be located within ten feet of the drip line of any standing trees. |
| Slash piles shall not be located within ten feet of any fence-line, road or trail. |
| Slash piles shall not be located within 30 feet of any buildings, fuel tanks, or utility lines. |
| Slash piles shall not contain soil, trash, or any other debris. |
| 5.1.10. HAND-PILING of SLASH. The contractor shall hand-pile the accumulated slash on the treatment units, as summarized: |
| Slash piles shall not exceed 4 feet in height. |
| Slash piles shall not exceed 6 feet across at the greatest part of the pile. |
| Slash piles mid-point shall not be directly under a tree canopy. |
| Slash piles shall not contain soil, trash, or any other debris. |
| Larger woody debris greater than 6” diameter can be excluded from slash piles and left on ground perpendicular to the slope. |
| 5.1.11. CHIPPING or GRINDING of ACCUMILATED SLASH. The contractor shall chip or grind all accumulated slash, as summarized: |
| All dead branches and accumulated slash shall be chipped or be ground up within the identified treatment unit areas. |
| All chippings shall be consolidated in piles. |
| All chips shall be less than 2 inches in length. |
| 5.2.1. Conflicts with Other Government Use. The contractor shall acknowledge that this project is on a National Wildlife Refuge and shall agree to move their personnel, equipment and their operations at their expense at the direction of the Governmen... |
| 5.2.2. Wildland Fires. The contractor shall familiarize all employees with the Refuge’s fire prevention regulations, as stated in the Refuge’s Step-Up Plan. Fire tools and fire extinguishers shall be present on-site and shall be readily available fo... |
| Any fire start should be reported to the Government immediately. If no immediate contact with the Government is made, then the fire should be reported to 911. All starts should be suppressed immediately. If the fire cannot be suppressed immediately,... |
| 5.2.3. No smoking is allowed in the work area, except near the designated smoke break area. Such an area shall be completely free of slash, trash and debris, be on exposed gravel, rocks or bare mineral soil and be away from all hazardous materials, in... |
| 5.2.4. Daily & Weekly Reports. On the days that the contractor works, a Contractor’s Daily Inspection Log will be completed by the contractor. The contractor shall provide the following information to the Contracting Officer’s Representative (COR): u... |
| 5.2.5. Licenses and Permits. The contractor is responsible for acquiring and maintaining all licenses and permits and other needed documents required to complete and execute the provisions, requirements and tasks under this contract, without any extra... |
| 5.2.6. Vehicles. Highway vehicles owned or leased by the contractors shall be kept in good operating condition and shall be properly insured, licensed and registered. ATV’s may be used. All vehicles and ATV’s must remain on designated roads and shall... |
| 5.2.7. Cut Materials. If the contractor desires to remove any cut juniper woody material (e.g. “cedar posts”) from the work area, then the contractor shall request permission from the COR in writing prior to removing any woody material from the Refug... |
| 5.2.8. Cutting/ Slashing on Excessively Steep Slopes and Terrain. Contractor crew personnel shall use common sense and use good judgment when working in steep terrain. For steeply-sloped areas within the designated cutting units, the following criter... |
| 5.2.9. Security of Materials. The contractor may leave their equipment and supplies at the work site. However, the contractor is hereby advised that the Government assumes no liability or responsibility for the stored equipment or supplies on Governm... |
| 5.2.10. Suspension of Work. The CO will have the full authority to suspend the work at anytime for such period as deemed necessary, due to fire conditions, unsuitable weather, or any other unfavorable conditions for the satisfactory execution of the ... |
| 5.3. Safety and Health Tasks. |
| 5.3.1. All accidents or incidents shall be reported immediately to the COR. The contractor shall be responsible for their own job/work hazard analysis. The contractor shall mitigate for all site and work hazards and take all necessary actions to prev... |
| 5.3.2. Work Safety. The contractor shall perform their work in a safe manner in full compliance with all Federal (including OSHA), State and local laws, policies, rules, regulations and requirements. |
| 5.3.3. Equipment Safety. All equipment shall be maintained in good operating condition. All safety precautions and requirements shall be implemented and complied with when using any tools or equipment according to manufacturer’s specifications. All ... |
| 5.3.4. Employee Safety. The contractor is responsible for having an approved safety plan and an emergency plan. The contractor is responsible for having safety briefings and safety training. Also, the contractor shall be liable and responsible for en... |
| 5.3.5. Human Sanitation. The contractor is responsible for providing their own mobile/portable sanitation or latrine facilities, including (but not limited to) honey buckets, sanican, portable wash stations, potable drinking water facilities etc. The... |
| 5.3.6. General Housekeeping. The contractor shall be responsible for the proper handling and proper transport and disposal of all waste products, including (but not limited to) general trash/waste, human waste, hazardous materials and hazardous waste.... |
| 5.4. Resource Protection Tasks. |
| 5.4.1. The contractor shall comply with all Federal, State and Local laws, policies, regulations and standards, regarding environmental pollution listed as mandatory. This includes, but is not limited to the following agencies: OSHA, DOT, TCEQ, DPS, e... |
| 5.4.2. Hazardous Materials. The contractor shall ensure that a current, up-to-date Material Safety Data Sheet (MSDS) is readily available for each product, as well as listing a product identification number. ALL hazardous materials shall be properly... |
| 5.4.3. Endangered Species. The natural resources within the project boundaries and those outside the limits of work under this contract shall be protected during the entire period of this contract. The contractor shall confine their activities to the ... |
| 5.4.4. Protection of Stream and Water Sources. The contractor is responsible to ensure that any potential environmental contamination is prevented and avoided. All contractor personnel shall use care and caution at all times, especially when working i... |
| 5.4.5. Protection of Standing Live Trees. The contractor shall leave all other remaining standing trees as is. This includes (but is not limited to): live oak, cherry, Spanish oak, etc. All single-stemmed or double-stemmed juniper trees greater tha... |
| 5.4.6. Soil Erosion and Site Damage. Soil erosion and/or site damage shall be minimized, including on all roads, trails and shallow soil zones. Additionally, the contractor shall restrict their vehicular traffic to the roads that are designated for ... |
| 5.4.7. Noxious Weeds. The contractor shall ensure that all equipment is cleaned off and free of ALL debris prior to operating on Government lands or private lands (as applicable) and prior to the commencement of work. The contractor shall remove all ... |
| 5.4.8. Oak Wilt. Oak wilt is a disease that kills and/or harms oak trees, including live oak and Spanish oak. The contractor is responsible for using extreme care and caution when working around any oak trees. The contractor shall have a readily avail... |
| 6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS) |
| 6.1. The Contractor must abide by all applicable Federal and State regulations and laws applicable to this project. |
| 7. Treatment Task Worksheets and Maps |
| BIL WUI.pdf |
| Treatment Task Worksheet.pdf |
| APPENDIX A |
| A.1 CUTTING JUNIPER. The contractor shall completely cut juniper trees and saplings, as summarized: |
| A.2 CUTTING of OTHER BRUSH and TREE SPECIES. The contractor shall completely other species of trees and/or brush, as summarized: |
| All saplings, small trees, and brush species less than four inches (<4.0 inches) in diameter. |
| All juniper trees less than 36 inches tall. |
| Maximum stump height shall not exceed 6.0 inches tall. |
| A.3 CUTTING of SHINNERIES. The contractor shall completely cut woody vegetation within units designated as shinneries as summarized: |
| All woody species greater than (>) 36 inches tall. |
| Maximum stump height shall not exceed 6.0 inches tall. |
| A.4 SLASHING of CUT TREES |
| All limbs remaining on cut juniper trees shall be slashed from the bole so that the remaining tree shall have no part greater than 36 inches from the ground. |
| A.5 FENCE-LINE CLEARING: The contractor shall completely cut, slash, and remove all unwanted trees and brush along (and in) the fence-lines, as summarized: |
| All trees and brush shall be completely cut and severed along (and in) the fence-line. |
| All trees, branches, and brush must be removed from the fence-line. |
| All accumulated slash and brush shall be pulled back and removed from the fence-line a minimum of ten feet. |
| A.6 SLASH PULLBACK. The contractor shall move and relocate accumulated slash away from designated No-Cut trees, fence-lines, roads and trails, buildings, etc. These areas will be designated by the government on the site map. Slash pullback can be don... |
| Slash will be pulled back a minimum of 10 feet from the designated unit perimeters, fence lines, utility lines, and buildings. |
| Slash will be pulled back a minimum of 5 feet from the designated roads and trails. |
| Slash will be pulled back a minimum of 10 feet from drip line of the designated trees. |
| Pulled slash will be scattered and not piled. This will require areas with heavy slash to be pulled a greater distance so that no piling occurs and all slash is exceeds the minimum pull back requirements. |
| Exception will require COR approval on case by case basis depending on the availability of open areas for the piled slash. |
| A.7 UNDERSTORY THINNING – Shaded Fuel Break (SFB). The contractor shall follow and comply with the following criteria and requirements for establishing shaded fuel breaks (SFBs). They are as summarized: |
| A.8 UNDER STORY THINNING. The contractor shall follow and comply with the following criteria and requirements for establishing shaded fuel breaks (SFBs). They are as summarized: |
| A.9 MACHINE-PILING of SLASH. The contractor shall hand-pile or machine-pile the accumulated slash on the treatment units, as summarized: |
| Slash piles shall not exceed 15 feet in height. |
| Slash piles shall not be located within ten feet of the drip line of any standing trees. |
| Slash piles shall not be located within ten feet of any fence-line, road or trail. |
| Slash piles shall not be located within 30 feet of any buildings, fuel tanks, or utility lines. |
| Slash piles shall not contain soil, trash, or any other debris. |
| A.10 HAND-PILING of SLASH. The contractor shall hand-pile the accumulated slash on the treatment units, as summarized: |
| Slash piles shall not exceed 4 feet in height. |
| Slash piles shall not exceed 6 feet across at the greatest part of the pile. |
| Slash piles mid-point shall not be directly under a tree canopy. |
| Slash piles shall not contain soil, trash, or any other debris. |
| Larger woody debris greater than 6” diameter can be excluded from slash piles and left on ground perpendicular to the slope. |
| A.11 CHIPPING or GRINDING of ACCUMILATED SLASH. The contractor shall chip or grind all accumulated slash, as summarized: |
| All dead branches and accumulated slash shall be chipped or be ground up within the identified treatment unit areas. |
| All chippings shall be consolidated in piles. |
| All chips shall be less than 2 inches in length. |
| A.12 TREATMENT TASK WORKSHEET |
| BIL WUI.pdf |
| 1431 Roadside 1.pdf |
| Rust Plateau.pdf |
| 3 Creeks Plateau.pdf |
| Travis Peak North.pdf |
| Travis Peak South.pdf |
| McKeever East.pdf |
| BIL WUI.pdf |
| Peaceful Sprs House.pdf |
| Peaceful Sprs Plateau.pdf |
| BIL WUI.pdf |
| Peaceful Sprs Plateau.pdf |
| Peaceful Sprs House.pdf |
| McKeever East.pdf |
| Travis Peak South.pdf |
| Travis Peak North.pdf |
| 1431 Roadside 1.pdf |
| Rust Plateau.pdf |
| 3 Creeks Plateau.pdf |
File details come from the government source that posted it. Updated .