Sol_140F0922Q0093_Amd_0004.pdf
PDF 1 MB Posted
- Attached to
- GENERATOR REPLACEMENT FWS SPEC AGENT LACOMBE LA Federal contract opportunity
- Solicitation number
- 140F0922Q0093
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0922Q0093_Amd_0003.pdf | ||
| Sol_140F0922Q0093_Amd_0002.pdf | ||
| Sol_140F0922Q0093_Amd_0001.pdf | ||
| Sol_140F0922Q0093.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0922Q0093 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
FGS
Falls Church VA 22041 5275 Leesburg Pike FWS Goods & Services
08/16/20220004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/01/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION 140F0922Q0093 AMENDMENT 0004: THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE
ANSWERS TO Q&A. GENERATOR REPLACEMENT LA-FWS SPEC AGNT-LACOMBE LA OLE
This is an Urgent need. The current generator is in need of repair and would be more effective to order a new one before hurricane season starts.
PPR: 1027230
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Todd Annes
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 7
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0922Q0093/0004
Contracting Point of Contact, Lee Ann Riley can be reached at lee_riley@fws.gov
All questions should be submitted via email only.
RFQ Response: Email Subject Line: 140F0922Q0093, Quotation. Due Date: Monday, August 22, 2022, at
3:00PM EST
Questions/Clarification: Email Subject Line:
140F0922Q0093, Question/Clarification. Due Date:
COB, August 8, 2022
Period of Performance: 08/31/2022 to 10/31/2022
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
STATEMENT OF WORK (SOW)
GENERATOR REPLACEMENT – LA LACOMBE, LA OLE
RFQ Number: RFQ 140F0922Q0093 – AMENDMENT 0004 Date: August 16, 2022 Contracting Contact: Lee Ann Riley, Contract Specialist – lee_riley@fws.gov
Q & A – RESPONSES
1. Does the foundation for the existing generator have a sufficient footprint and design to accommodate the new generator?
We have a footprint which was poured for the existing generator, Generac Model 22/27kW, 2.4L.
2. What is the kW/kVA rating of the existing generator?
27KW, which is what we listed on the PRR. It is an air-cooled natural gas generator.
3. Is the existing generator natural gas or diesel? If diesel, is there an existing diesel storage tank and piping that must be demolished?
Natural gas
4. Is the contractor to remove and dispose of the existing generator and transfer switch or will the FWS take possession of the units?
Yes.
5. What is the distance to the nearest natural gas supply piping with sufficient capacity to supply the new generator?
Five feet or less.
6. Will new natural gas piping need to be routed underground?
No.
7. Is the generator rating Level 1 (Emergency Standby) or Level 2 (Legally Required Standby)?
It is a stationary emergency generator.
Does FWS expect long run times requiring the generator to have a prime or continuous rating?
We want the generator to run continuously until electrical power is restored.
8. Is the contractor to sole source Generac brand generator per the solicitation or are equal substitutions acceptable?
Equal substitutions are acceptable.
9. Can pictures be provided of the existing generator set and existing transfer switch locations?
mailto:lee_riley@fws.gov
Transfer switch
10.
11.
12. Are contractors to assume all existing conductors, grounding, panels, etc are properly sized, rated, and in good working condition so as to be reused?
13. Does the FWS need manufacturer provided onsite training after the unit is installed?
14. Does the FWS need any manufacture’s extended warranty or maintenance agreements quoted?
No, to the extended warranty. Yes, for a quote for a maintenance agreement.
STATEMENT OF WORK (SOW)