140F0918R0012_Attachment_B_-_Drawings.pdf
PDF 2 MB Posted
- Attached to
- Water Treatment and Wastewater Treatment Project
- Solicitation number
- 140F0918R0012
About this file
140F0918R0012 Attachment B - Drawings
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
T
PHYSICAL
TRAINING
CARSON
LODGE
(H3)
MURIE
LODGE (H4)
DARLING
LODGE
(H2)
LEOPOLD
LODGE
(H1)
CENTRAL
PLANT
INSTRUCTIONAL
WEST
INSTRUCTIONAL
EAST
LABORATORY
ENTRY
AUDITORIUM
KREATE
DAYCARE
WEST
POND
OFFICE
WASTE
WATER
TREATMENT
WATER
TREATMENT
SUPPORT
SERVICES
GUARD
HOUSE
C
O
N
S
E
R
V
A
T
I O
N
W
A
Y
S
H
E
P
H
E
R
D
G
A
TO
SHEPHERDSTOWN
3.3 MILES
COMMONS
C
A
P
T
A
I
H
N
D
R
I X
R
O
O
S
E
V
E
L
B
A
I
R
I
V
E
R
V
I
E
W
F
A
M
S
H
E
P
H
E
G
A
R
I V
E
R
V
I
F
S
P
R
I N
G
W
O
Water Treatment Plant and Wastewater Treatment Plant Repairs - 2018
U.S. FISH AND WILDLIFE SERVICE
U.S. DEPARTMENT OF INTERIOR
Beardsley Architects + Engineers 64 South street Auburn, New York 13021 315.253.7301
Architect + Engineer
March 16, 2018 be ard sle y p ro jec t n um be r:
Construction Documents
National Conservation Training Center 698 Conservation Way Shepherdstown, West Virginia 25443
Fil en am e:
P:
\P ro jec ts\
4\
DR
AW
IN
GS
\1 -C
OV
ER
.d wg
3/
/2
8 7 :0
3 A M
AUBURN | MALONE | SYRACUSE
TITLE SHEET
TITLE
DWG NO
INDEX OF DRAWINGS
SITE MAP
NOTES, LEGEND AND ABBREVIATIONS
G-001
WASTEWATER TREATMENT IMPROVEMENT PLAN
G-004
WATER TREATMENT WALL REPAIR PLAN AND SECTIONS
C-101
G-002
WASTEWATER TREATMENT PLANT DETAILS
C-501
OVERALL SITE PLAN
C-102
G-003
WATER TREATMENT BUILDING PLAN
PROCESS FLOW DIAGRAM
G-005
SECONDARY WASTEWATER TREATMENT NO 1 PLAN AND SECTIONS
HYDRAULIC PROFILE
G-006
C-103
SECONDARY WASTEWATER TREATMENT NO 2 PLAN AND SECTIONS
PROJECT LOCATION
SCALE: NONE
W W
P
R
K
W T
P
W
O R
K
XX
XX
XX
X
X
X
X
X
X
X
X
C-104
WASTEWATER TREATMENT PLANT CONCRETE REPAIR PLANS
X
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CONTRACTOR ACCESS LOCATION
EL ELEVATION
EXISTINGEX
CI / CIP CAST IRON / PIPE
DIAMETERDIA
MH MANHOLE
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
TOP
T/
B/ BOTTOM
BALL VALVEBV
BFV BUTTERFLY VALVE
CV CHECK VALVE
FM FORCE MAIN
GALLONS PER DAYGPD
GALLONS PER MINUTEGPM
TYP TYPICAL
CLEANOUTC.O.
EACH FACEEF
EACH WAYEW
DUCTILE IRONDI
POST INDICATING VALVEPIV
STAINLESS STEELSS
PLATEPL
FOOTFT
ON CENTER
OC
ALUMINUMALUM
FOOTINGFTG
INVERTINV
MINIMUMMIN
MAXIMUMMAX
CONCRETECONC
CENTERLINEC
L
VITRIFIED CLAY PIPEVCP
CMP CORRUGATED METAL PIPE
CLF CHAIN LINK FENCE
MONUMENTMON
WASTEWATER TREATMENT PLANTWWTP
UV ULTRAVIOLET LIGHT
EQ EQUALIZATION
DOWNDN
EACHEA
PVC POLYVINYL CHLORIDE
OCCUPATIONAL SAFETY AND HEALTH ORGANIZATION
OSHA
SIMILARSIM
ABBREVIATIONS
USFWS UNITED STATES FISH AND WILDLIFE SERVICE
C/C CENTER TO CENTER
CHLORINECL
NUMBERNO
AVERAGEAVG
GALVANIZEDGALV
NATIONAL CONSERVATION TRAINING CENTERNCTC
ROOF DRAINRD
WATERW
ELECTRICE
TELEPHONE
T
SANITARYSA
STORMST
SANITARY FORCE MAINSAFM
ROOMRM
SQUARESQ
WATER SURFACEWS
HIGH WATER LINEHWL
OUTSIDE DIAMETER
OD
WATER TREATMENT PLANTWTP
EX FIRE HYDRANT
EX UTILITY POLE
EX UTILITY VALVE
EX UTILITY ELECTRIC METER
EX UTILITY SANITARY MANHOLE
EX UTILITY DRAINAGE MANHOLE
EX CHAIN LINK FENCE
EX ELECTRIC
X X
EX TELEPHONE
EX SANITARY SEWER
EX STORM WATER
LEGEND
E
T
SA
ST
EX WATER
W
EX ROOF DRAIN
RD
X
EX YARD HYDRANT
EX SANITARY FORCE MAINSAFM
CIVIL
NOTES, LEGEND
AND ABBREVIATIONS
FJS
SAL
JRH
G-001
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
REFERENCE NOTES
1. CONSTRUCTION DRAWINGS ARE BASED ON HISTORICAL AND RECORD DRAWINGS
PROVIDED BY THE USFWS.
2. THE LOCATION, NATURE AND ALIGNMENT OF UNDERGROUND UTILITIES ARE BASED ON
HISTORIC AND RECORD DRAWINGS, AND UTILITY EVIDENCE VISIBLE AT THE GROUND
SURFACE AND ARE CONSIDERED TO BE SCHEMATIC ONLY.
3. THE INFORMATION PRESENTED ON THE DRAWINGS DOES NOT CLAIM TO SHOW ALL
UNDERGROUND UTILITIES. OTHERS MAY EXIST IN THE WORK AREA. IDENTIFICATION OF
ALL UTILITIES IN THE WORK AREA SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
WASTEWATER DISPOSAL
1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FACT THAT ANY INFLUENT
WASTEWATER HAULED OFF SITE SHALL BE DONE SO BY A LICENSED HAULER TO
ANOTHER REGULATED WASTEWATER TREATMENT PLANT. BOTH THE HAULER AND
RECEIVING WASTEWATER TREATMENT PLANT SHALL BE LICENSED FOR INDUSTRIAL
WASTE. RESPONSIBILITY, INCLUDING BUT NOT LIMITED TO, ALL COST INCURRED FOR
HAULING AND DISPOSAL OF THE WASTEWATER, SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
2. ALL WASTE GENERATED BY THE FACILITY WILL BE REMOVED AND HAULED BY USFWS. ALL
WASTE GENERATED BY THE CONTRACTOR AS PART OF THE WORK SHALL BE REMOVED
AND DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE AND LOCAL REGULATIONS. COORDINATE CONSTRUCTION OPERATIONS
WITH WASTEWATER HAULING TO ENSURE SUFFICIENT STORAGE CAPACITY IS
MAINTAINED WITHIN THE EXISTING AEROBIC DIGESTER.
COORDINATION
1. DURING THE CONSTRUCTION PERIOD COORDINATE ACTIVITIES, INCLUDING USE OF THE
SITE, TO MINIMIZE INTERFERENCE WITH THE ONGOING USFWS OPERATIONS.
CONTRACTOR'S ACTIVITIES ARE SUBJECT TO PRIOR APPROVAL BY THE USFWS.
LAYOUT
1. THE USFWS WILL DETERMINE LOCATIONS OF CONTRACTOR STAGING AND LAYDOWN
AREAS. THE SITE HAS LIMITED SPACE FOR PARKING, MATERIAL AND EQUIPMENT.
2. RESTORE ANY AREAS DISTURBED BY STAGING, PARKING, OR OTHER CONSTRUCTION
ACTIVITIES TO THEIR ORIGINAL CONDITION.
EXISTING CONDITIONS
1. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS IN THE FIELD BEFORE COMMENCING
WORK. IMMEDIATELY NOTIFY THE USFWS OF ANY DISCREPANCIES.
2. CONTRACTOR IS ADVISED OF THE PRESENCE OF METHANE, PROPANE, AND OTHER
POTENTIALLY FLAMMABLE GASES AT THE SITE. THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE TO CHECK FOR CONCENTRATIONS OF FLAMMABLE VAPORS/GASES
BEFORE CONDUCTING ANY ACTIVITY (WELDING, CUTTING, TORCHING, ETC.) THAT COULD
CAUSE IGNITION OF THOSE GASES.
3. PROTECT FROM DAMAGE ALL EXISTING FEATURES NOT INDICATED OR REQUIRED TO BE
REMOVED FOR THE WORK.
4. REPAIR ITEMS THAT ARE TO REMAIN IF DAMAGED DURING THE PERFORMANCE OF THE
WORK. REPAIR OR REPLACE TO THEIR ORIGINAL CONDITION AS DETERMINED BY THE
USFWS, OR REPLACE WITH NEW IN-KIND.
EXISTING UTILITIES
1. THE LOCATION OF UTILITIES INDICATED ON THE DRAWINGS ARE APPROXIMATE ONLY.
CONTRACTOR SHALL PROVIDE THEIR OWN UTILITY LINE LOCATION DEVICE AND
ACCURATELY LOCATE SUBSURFACE UTILITIES BEFORE EXCAVATING.
2. PERFORM EXCAVATION IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE AND
FEDERAL REQUIREMENTS.
3. EXISTING WATER SUPPLY PIPING AND APPURTENANCES WHICH ARE CUT, TAPPED, OR
OTHERWISE DISTURBED DURING CONSTRUCTION SHALL BE PROTECTED FROM
CONTAMINATION AND DISINFECTED AS REQUIRED BY AUTHORITIES HAVING
JURISDICTION.
SPOILS
1. ALL SPOIL MATERIAL (INCLUDING WASTEWATER, WASH WATERS, AND SLUDGE) REMOVED
FROM THE JOB SITES SHALL BE DISPOSED OF, BY THE CONTRACTOR, OFF OF THE USFWS
PROPERTY. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL
REGULATIONS THAT APPLY TO THE OFF-STE AREA CHOSEN FOR THE SPOIL MATERIAL.
ALL COST ASSOCIATED WITH THE REMOVAL AND LAWFUL DISPOSAL OF ALL SPOIL
MATERIAL OFF USFWS PROPERTY SHALL BE INCLUDED IN THE WORK OF THIS CONTRACT.
DEMOLITION
1. CONDUCT REMOVAL OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT
EXISTING FEATURES TO REMAIN. ENSURE SAFE PASSAGE OF PEOPLE AND AUTHORIZED
VEHICLES AROUND THE WORK AREA.
2. PROVIDE CONSTRUCTION FENCES, BARRICADES OR OTHER SUITABLE DEVICES AS DIRECTED
BY THE THE USFWS TO PREVENT DAMAGE BY VEHICLES AND UNAUTHORIZED ENTRY INTO
WORK, CONSTRUCTION STAGING AND EQUIPMENT STORAGE AREAS.
3. PROVIDE ALL REMOVALS INCIDENTAL TO AND NECESSARY TO PROVIDE THE WORK OF THIS
CONTRACT AND LEGALLY DISPOSE OF OFF-SITE. REMOVE EXISTING FEATURES AND UNUSED
EARTH MATERIALS IN THEIR ENTIRETY UNLESS OTHERWISE INDICATED BY THE THE USFWS.
4. PROMPTLY DISPOSE OF DEMOLISHED MATERIALS AND TRASH. DO NOT ALLOW DEBRIS TO
ACCUMULATE ON-SITE.
SITE WORK
1. RESTORE ANY SITE AREA OR FEATURE DISTURBED DURING CONSTRUCTION TO ORIGINAL
CONDITION AS DETERMINED BY THE USFWS.
2. PROVIDE A MINIMUM OF 4 INCHES OF NEW TOPSOIL AND SEEDING, AND MAINTAIN LAWN
GROUND COVER UNTIL CONCLUSION OF THE PROJECT.
CONFINED ENTRY:
1. FOLLOW ALL PROPER OSHA REGULATIONS FOR ENTRANCE INTO CONFINED SPACES.
PAINTING, PATCHING AND COATINGS
1. INSTALL ALL PRODUCTS IN STRICT ACCORDANCE WITH THE MANUFACTURERS' INSTRUCTIONS, INCLUDING STRICT ADHERENCE TO SURFACE PREPARATION AND ENVIRONMENTAL
REQUIREMENTS.
2. REFER TO APPLICABLE SPECIFICATIONS FOR ADDITIONAL INFORMATION ON TESTING,
INSPECTIONS, AND QUALITY CONTROL. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING
AND PAYING FOR THE SERVICES OF A QUALIFIED INDEPENDENT TESTING AGENCY.
GENERAL NOTES
SUGGESTED CONSTRUCTION SEQUENCING
WASTEWATER TREATMENT PLANT
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, TECHNIQUES, AND SEQUENCES OF
CONSTRUCTION TO CONSTRUCT THE PROPOSED IMPROVEMENTS TO THE WASTEWATER
TREATMENT PLANT. IT IS IMPERATIVE THAT THE CONTRACTOR'S WORK SHALL NOT IMPACT
USFWS'S ABILITY TO MAINTAIN EFFLUENT QUALITY WITHIN THE NATIONAL POLLUTANT DISCHARGE
ELIMINATION PERMIT (NPDES) LIMITS. BELOW IS THE SUGGESTED SEQUENCING FOR
CONSTRUCTION ACTIVITIES.
1. PERFORM REMOVALS AND IMPROVEMENTS TO THE OFFLINE SECONDARY WASTEWATER
TREATMENT UNIT.
2. PERFORM REMOVALS AND IMPROVEMENTS TO THE SOLIDS STRAINER AND BAR SCREEN.
3. PERFORM IMPROVEMENTS TO THE FLOW DISTRIBUTION BOX.
4. PERFORM IMPROVEMENTS TO THE CHLORINE CONTACT TANK.
5. UPON COMPLETION OF IMPROVEMENTS AND PROPER CURING OF EPOXY COATINGS ON THE
OFFLINE SECONDARY WASTEWATER TREATMENT UNIT, SWITCHOVER INFLUENT FLOWS AT THE
FLOW DISTRIBUTION BOX TO THE OTHER SECONDARY WASTEWATER UNIT.
6. PERFORM REMOVALS AND IMPROVEMENTS TO THE OFFLINE SECONDARY WASTEWATER
TREATMENT UNIT.
7. UPON COMPLETION OF IMPROVEMENTS AND PROPER CURING OF EPOXY COATINGS ON THE
OFFLINE SECONDARY WASTEWATER TREATMENT UNIT, REMOVE TEMPORARY MEASURES, AND
PERFORM CLEANUP AND SITE RESTORATION.
WATER TREATMENT PLANT
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, TECHNIQUES, AND SEQUENCES OF
CONSTRUCTION TO CONSTRUCT THE PROPOSED IMPROVEMENTS TO THE WATER TREATMENT
PLANT. IT IS IMPERATIVE THAT THE CONTRACTOR'S WORK SHALL NOT IMPACT USFWS ABILITY TO
MAINTAIN WATER QUALITY CHARACTERISTICS IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS. BELOW IS THE SUGGESTED SEQUENCING FOR CONSTRUCTION ACTIVITIES.
1. TEMPORARILY RELOCATE EXISTING WATER TREATMENT COMPONENTS ADJACENT AND NOT
AFFIXED TO WALLS BEING REPAIRED.
2. PERFORM REMOVALS AND IMPROVEMENTS TO THE CONCRETE MASONRY UNIT WALLS.
3. PERFORM REMOVALS AND IMPROVEMENTS TO THE PERIMETER EXPANSION JOINTS.
4. REINSTALL EXISTING WATER TREATMENT COMPONENTS THAT WERE TEMPORARILY
RELOCATED TO PERFORM THE PROPOSED IMPROVEMENTS.
5. REMOVE TEMPORARY MEASURES, AND PERFORM CLEANUP AND SITE RESTORATION.
DRAWING NOTE:
1. THIS SHEET RELATES TO WORK WITHIN BOTH THE
WATER AND WASTEWATER TREATMENT PLANT.
MH
NO 1
MH
NO 2
MH
NO 3
MH
NO SA
MH
NO 5
MH
NO 6
MH
NO 8
SCALE:
OVERALL SITE PLAN
A
1"=20' W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
OVERALL
SITE PLAN
FJS
SAL
JRH
G-002
A
B
C
D
FLOW METER VAULT NO 1
SOLIDS STRAINER AND BAR SCREEN
FLOW DISTRIBUTION BOX
ASSET
ID
SECONDARY WASTEWATER
TREATMENT UNIT NO 1
E SECONDARY WASTEWATER
TREATMENT UNIT NO 2
F FLOW METER VAULT NO 2
G PUMP STATION NO 5
H CHLORINE CONTACT TANK
I AEROBIC DIGESTER
J OPERATIONS BUILDING
6" INFLUENT FORCE MAIN
8" INFLUENT TO FLOW DISTRIBUTION
BOX FROM SOLIDS STRAINER
8" INFLUENT TO OXIDATION DITCH NO 1
PIPE DESCRIPTIONID
4 8" INFLUENT TO OXIDATION DITCH NO 2
5 8" EFFLUENT FROM CLARIFIER NO 1
6 8" EFFLUENT FROM CLARIFIER NO 2
7 8" INFLUENT TO CHLORINE CONTACT TANK
8 8" OUTFALL
9 3" RAW ACTIVATED SLUDGE FROM CLARIFIER NO 1
10 3" RAW ACTIVATED SLUDGE FROM CLARIFIER NO 2
11 3" RECYCLED SLUDGE TO OXIDATION DITCH NO 1
12 3" RECYCLED SLUDGE TO OXIDATION DITCH NO 2
13 3" WASTE ACTIVATED SLUDGE
14 3" DIGESTED SLUDGE
15 3" TO SLUDGE DEWATERING REED BED (ABANDONED)
16 2 1/2" AIR LINE
17 8" DECANT DRAIN LINE
18 2" DISCHARGE LINE PUMP STATION NO 4
19 2" DISCHARGE LINE PUMP STATION NO 5
20 6" DRAIN LINE
21 1" SODIUM HYPOCHLORITE
22 3" WATER TO YARD HYDRANTS
23 1" WATER TO SOLIDS STRAINER
24 3" DIGESTER LINE
25 4" DRAIN
26 ROOF DRAIN
I
E
D
J
A
B
C
G
F
H
K RAW WATER VALVE VAULT
K
L WATER TREATMENT BUILDING
L
M POTABLE WATER STORAGE TANK
M
N PUMP STATION NO 4 AND VALVE VAULT
N
27 4" INFLUENT FROM WELLS
28 4" T0 STORAGE TANK
29 10" TO FIRE/BOOSTER PUMPS
30 12" TO WATER DISTRIBUTION SYSTEM
31 6" TANK DRAIN
32 8" PROCESS DRAIN
33 6" FLOOR DRAIN
34 4" FLOOR DRAIN
35 4" WATER LINE
36 6" TANK OVERFLOW
37 1" WATER
38 1" WATER SUPPLY TO FIRE PUMP CONTROLLERS
39 4" WELL WATER TO LABORATORY BUILDING
A
G-004
A
G-003
R
I
V
E
R
V
I
F
A
D
DRAWING NOTES:
1. THIS SHEET RELATES TO WORK WITHIN BOTH THE
WATER AND WASTEWATER TREATMENT PLANT.
2. THIS SHEET IS PROVIDED FOR REFERENCE ONLY.
O EX GENERATORS AND RELATED EQUIPMENT,
(FORMER REED BED DISPOSAL SYSTEM)
M
SCALE:
WATER TREATMENT BUILDING PLAN
A
1/4"=1'-0"
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
WATER TREATMENT
BUILDING PLAN
FJS
SAL
JRH
G-003
A
B
C
D
CHLORINE CONTACT TANK
IRON & MANGANESE FILTER NO 1
ASSET
ID
WATER SOFTENER NO 2E
F BRINE TANK
G SODIUM HYPOCHLORITE TANK
H CHLORINE CHEMICAL FEED PUMP
I SODA ASH TANK
J SODA ASH CHEMICAL FEED PUMP
4" PIPE FROM WELL VAULT NO 1
PIPE DESCRIPTIONID
K BULK SALT & BRINE STORAGE
L FIRE PUMP NO 1 (ELECTRIC)
M FIRE PUMP NO 2 (DIESEL)
N DIESEL STORAGE TANK
A
B
IRON & MANGANESE FILTER NO 2
C
D
E
WATER SOFTENER NO 1
O 5,000 GAL HYDROPNEUMATIC TANK
P BOOSTER PUMP NO 1
Q BOOSTER PUMP NO 2
R BOOSTER PUMP NO 3
S BOOSTER PUMP NO 4
K
F
G
I
H J
O
N
L
M
R
S
P Q
A
C-101
WATER TREATMENT PIPING - VARIOUS SIZES
4" PIPE TO WATER STORAGE TANK
4" WATER TREATMENT BYPASS PIPE
10" PIPE FROM WATER STORAGE TANK
10" FIRE PROTECTION PUMP PIPING
4" & 6" DOMESTIC PUMP PIPING
4" PIPE TO WATER TREATMENT BUILDING
1" PIPING TO FIRE PUMP CONTROLLERS
12" PIPE TO DISTRIBUTION SYSTEM
6 TYP
7 TYP
ELECTRICAL
SUBSTATION RM
104WT
WATER PUMP STATION
103WT
BRINE TANK STORAGE
101WT
WATER TREATMENT
102WT
EMERGENCY
ELECTRICAL RM
106WT
NORMAL
ELECTRICAL RM
105WT
DRAWING NOTES:
1. THIS SHEET RELATES TO WORK WITHIN THE WATER
TREATMENT PLANT.
2. THIS SHEET IS PROVIDED FOR REFERENCE ONLY.
LIMITS OF WORK
SCALE:
WASTEWATER TREATMENT IMPOVEMENT PLAN
A
1"=10'
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
WASTEWATER TREATMENT
IMPROVEMENT PLAN
FJS
SAL
JRH
G-004
A
B
C
D
FLOW METER VAULT NO 1
SOLIDS STRAINER AND BAR SCREEN
FLOW DISTRIBUTION BOX
ASSET
ID
SECONDARY WASTEWATER
TREATMENT UNIT NO 1
E SECONDARY WASTEWATER
TREATMENT UNIT NO 2
F FLOW METER VAULT NO 2
G PUMP STATION NO 5
H CHLORINE CONTACT TANK
I AEROBIC DIGESTER
J OPERATIONS BUILDING
I
E
D
J
A
B
C
G
F
H
A
C-103
A
C-102
MH
NO 6
MH
NO 5
MH
NO 8
MH
NO SA
DRAWING NOTE:
1. THIS SHEET RELATES TO WORK WITHIN THE
WASTEWATER TREATMENT PLANT.
2. THIS SHEET PROVIDED FOR REFERENCE ONLY.
B
C-104
A
C-104
C
C-104
LIMITS OF WORK, TYP
FLOW
DISTRIBUTION
BOX
SECONDARY WASTEWATER
TREATMENT
NO 1 & 2
FLOW METER
VAULT NO 1
SOLIDS
STRAINER
CHLORINE
CONTACT TANK
NO 2
CHLORINE
CONTACT TANK
NO 1
SAMPLING
MANHOLE
TO PLANT
OUTFALL
SLUDGE RECYCLE PUMPS (3)
CHLORINE PUMPS (2)
OPERATIONS BUILDING
AEROBIC
DIGESTER
BAR SCREEN
FLOWS FROM
NCTC CAMPUS
S O
D I U
M
H
Y P
O C
H L O
R I T
E
AEROBIC DIGESTER BLOWERS (2)
FROM ATMOSPHERE
AIR (TYP)
HAUL OFF-SITE
A C
T I V
A T
S
U
D G
E
RE
CY
CL
ED
S
LU
DG
E
ACTIVATED SLUDGE
DIGESTED SLUDGE
FLOW METER
VAULT NO 2
SLUDGE TRANSFER PUMPS (2)
EXISTING AIR STREAM
EXISTING LIQUID STREAM
EXISTING SOLIDS STREAM
DIRECTION OF FLOW
PUMP STATION NO 5
PUMP STATION NO 4
DRAIN
DECANT DRAIN
SCALE:
PROCESS FLOW DIAGRAM
A
NONE
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
PROCESS FLOW DIAGRAM
FJS
SAL
JRH
G-005DRAWING NOTE:
1. THIS SHEET RELATES TO WORK WITHIN THE
WASTEWATER TREATMENT PLANT.
2. THIS SHEET PROVIDED FOR REFERENCE ONLY.
HYDRAULIC PROFILE
A
HORZ: NONE
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
HYDRAULIC PROFILE
FJS
SAL
JRH
G-006
VERT: 1" = 5'-0"
DRAWING NOTE:
1. THIS SHEET RELATES TO WORK WITHIN THE
WASTEWATER TREATMENT PLANT.
2. THIS SHEET PROVIDED FOR REFERENCE ONLY.
M
WALL REFURBISH AREA, SEE NOTES 1 & 2
SCALE:
PARTIAL WATER
TREATMENT BUILDING PLAN
A
1/4" = 1'-0" W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
WATER TREATMENT
WALL REPAIR
PLAN AND SECTIONS
FJS
SAL
JRH
C-101
SCALE:
WALL REFURBISH ELEVATION
1/4" = 1'-0"
TYPICAL WALL ELEVATION
NOTES:
1. BOTTOM THREE COURSES OF CMU TO BE PREPARED AND
COATED WITH CYCLOALIPHATIC AMINE EPOXY COATING.
2. TEMPORARY RELOCATE EX WATER TREATMENT COMPONENTS
ADJACENT AND NOT AFFIXED TO WALLS BEING REPAIRED.
WATER TREATMENT
19'-9" +/- WALL REFURBISH AREA
W
A L
L
R
E F
U R
B I S
H
A
R E
A
W
A L
L
R
E F
U R
B I S
H
E
A
19'-8" +/- WALL REFURBISH AREA
L
L
R
E F
U R
B I S
H
A
R E
A
C-101
102WT
SCALE:
EXPANSION JOINT REHABILITATION
1 1/2" = 1'-0"
DRAWING NOTE:
1. THIS SHEET RELATES TO WORK WITHIN THE
WATER TREATMENT PLANT.
NOTES:
1. REMOVE EX EXPANSION JOINT SEALANT THROUGHOUT THE PERIMETER
OF WATER TREATMENT ROOM (102WT).
2. CLEAN JOINT, INSTALL BACKER ROD MATERIAL AS REQUIRED.
3. PROVIDE JOINT SEALANT FLUSH TO TOP OF EX SLAB.
EX SLAB
EX CMU WALL
EX EXPANSION JOINT
SEE NOTES 1,2 & 3
KEY PLAN
WORK AREA
EXPANSION JOINT
REHABILITATION,
SEE DETAIL 2/C-101
L
L
R E
F U
R B
I S
H
A R
SECONDARY
TREATMENT # 1 PLAN
A
1/4" = 1'-0"
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
SECONDARY WASTEWATER
TREATMENT NO 1
PLAN AND SECTIONS
FJS
SAL
JRH
C-102
SCALE:
SECONDARY TREATMENT #1 SECTION
1/4" = 1'-0"
C-102
EX GRATING
EX 8" CLARIFIER INLET
EX MUD VALVE
EX 8" EFFLUENT TO
FLOW METER NO 2
EX 6" TO PUMP STATION NO 5
EX SCRAPER TRUSS
EX CLARIFIER
EX INLET SKIRT
18'-0" DIA
1'-0"
10'-0"
1'-0"
3'-0"
6"
1'-0"10'-0"1'-0"5'-0"6"
EX WEIR TROUGH
EX OXIDATION DITCH
EX OXIDATION DITCH
EX RACE SKIMMER
EX ROTOR
EX SCUM PUMP
EX SUMP
EX 3" RAW ACTIVATED
SLUDGE TO OPERATIONS
BUILDING
EX 8" INFLUENT FROM FLOW
DISTRIBUTION BOX
EX DRIVE
ASSEMBLY
EX LADDER EX RAILING (TYP)
EX 8" CLARIFIER INLET
EX 4" DRAIN
EX 8" INFLUENT TO
OXIDATION DITCH NO 1
EX 3" RAW ACTIVATED
SLUDGE
EX 3" RECYCLED
SLUDGE
EX 8" EFFLUENT TO
FLOW METER NO 2
EX 6" TO PUMP STATION NO 5
EX 1'-6" DIA GALV
STEEL SUMP AND
SUBMERSIBLE
SCUM PUMP
EX LADDER
EX RAILING (TYP)
EX ROTOR
EX BRIDGE
ASSEMBLY W/
HANDRAIL
EX OXIDATION DITCH
EX CLARIFIER
EX FLOOR
DRAIN
EX PLUG VALVE (TYP)
EX SKIRT AND
SUPPORTS
EX ADJUSTABLE
SCUM TROUGH
EX ROTOR
BAFFLE
EX ROTOR
COVER
EX RACE
EX STAIRS W/
HANDRAIL
EX MOTOR DRIVE
FLOW
EX BAFFLE
KEYED NOTES
RAILING ANCHOR REPAIR, TYP OF ALL STRUCTURE'S RAILING ANCHORS,
SEE DETAIL 1/C-501
GENERAL NOTES:
1. PIPING AND EQUIPMENT SHOWN FOR CLARITY ONLY. SEE PLAN FOR
LOCATION AND ORIENTATION OF EQUIPMENT AND PIPING.
2. INSTALL ALL PRODUCTS IN STRICT ACCORDANCE WITH THE
MANUFACTURERS' INSTRUCTIONS, INCLUDING STRICT ADHERENCE
TO SURFACE PREPARATION AND ENVIRONMENTAL REQUIREMENTS.
3. DUE TO THE LIMITED AMOUNT OF OBSERVABLE CONCRETE SURFACE,
THE CONTRACTOR SHALL ASSUME THAT 50% OF THE STRUCTURE'S
ENTIRE CONCRETE SURFACE (APPROXIMATELY 2,300 SF) IS TO BE
REPAIRED IN ACCORDANCE WITH DETAIL 1/C-501.
PROVIDE CYCLOALIPHATIC AMINE EPOXY COATING TO ALL SURFACES OF OXIDATION
DITCH, CLARIFIER AND EXPOSED METAL PIPING. ON EXTERIOR WALL SURFACES, APPLY
COATING A MINIMUM OF 6 INCHES BELOW EXISTING GRADE. SEE GENERAL NOTE 2
2 1
EX CONTROL PANEL
DRAWING NOTES:
1. THIS SHEET RELATES TO WORK WITHIN THE
WASTEWATER TREATMENT PLANT.
2. ALL DIMENSIONS ARE APPROXIMATE, VERIFY IN
FIELD PRIOR TO CONSTRUCTION.
1 REPAIR CONCRETE SURFACES. SEE GENERAL NOTE 3 AND DETAIL 1/C-501
4 GRAVEL MOW STRIP, SEE DETAIL 3/C-501
5 REMOVE AND REPLACE EX DRIVE EQUIPMENT'S THRUST BEARING, THRUST WASHER,
RETAINER RING, SHEAR PIN, GUIDE BEARING AND PINION GEAR, SEE DETAIL 1/C-102.
3 TYP
1 2
3 TYP
EX SHAFT COVER PLATE
EX 3/8" x 3/4" FLAT HEAD
MACHINE SCREW
REPLACE EX
SHEAR PIN
EX 3/8" SET SCREW
REPLACE EX PINION
GEAR AND SET SCREW
REPLACE EX KEY
REPLACE EX THRUST WASHER
EX KEY
EX SHEAR PIN HUB
REPLACE EX RETAINING RING
(CARRIES ENTIRE WEIGHT OF
LOWER DRIVE.)
EX BEARING
MOUNTING CHANNEL
REPLACE EX REDUCER SHAFT
GUIDE BEARING
EX RETAINING RING GROOVE
EX DRIVE SHAFT
REPLACE EX THRUST BEARING
AND COLLAR
EX BEARING MOUNTING
PLATE
EX SCRAPER SUPPORT
EX SPUR GEAR
REPLACE EX 3/8" x 1 3/4"
BOLTS, TYP OF 4
REPLACE EX 3/4" x 2 1/2"
BOLTS, TYP OF 4
SCALE:
DRIVE EQUIPMENT REPAIR
NONE
NOTES:
1. CLARIFIER AND DRIVE EQUIPMENT MANUFACTURED BY LAKESIDE EQUIPMENT
CORPORATION, 1022 E. DEVON, P.O. BOX 8448, BARTLETT, IL 60103.
2. BEFORE ASSEMBLY, ALL MACHINED PARTS SHALL BE GREASED TO PREVENT RUSTING.
3. PROVIDE ONE SHEAR PIN FOR INSTALLATION AND TWO FOR SPARE.
4. POSITION BEARINGS SO THAT GREASE HOLES LINE UP WITH FEMALE BULKHEAD
CONNECTORS IN REDUCER MOUNTING PLATE. "TOP" IS IMPRINTED IN THE SPUR GEAR.
THIS SIDE MUST BE UP.
PARTS REPLACEMENT SCHEDULE
PARTS PART NUMBER
QUANTITY
THRUST BEARING AND COLLAR ZF5215 1
THRUST WASHER A-24318 1
RETAINER RING SH-293 1
SHEAR PIN (SEE NOTE 3)
A-15722 3
REDUCER SHAFT GUIDE BEARING SKF FY1 1
PINION GEAR A8605G 1
SECONDARY
TREATMENT #2 PLAN
A
1/4" = 1'-0"
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
SECONDARY WASTEWATER
TREATMENT NO 2
PLAN AND SECTIONS
FJS
SAL
JRH
C-103
SCALE:
SECONDARY TREATMENT #2 SECTION
1/4" = 1'-0"
C-103
EX GRATING
EX 8" CLARIFIER INLET
EX MUD VALVE
EX 8" EFFLUENT TO
FLOW METER NO 2
EX 6" TO PUMP STATION NO 5
EX SCRAPER TRUSS
EX CLARIFIER
EX INLET SKIRT
18'-0" DIA
1'-0"
10'-0"
1'-0"
3'-0"
6"
1'-0"10'-0"1'-0"5'-0"6"
EX WEIR TROUGH
EX OXIDATION DITCH
EX OXIDATION DITCH
EX RACE SKIMMER
EX ROTOR
EX SCUM PUMP
EX SUMP
EX 3" RAW ACTIVATED SLUDGE TO
OPERATIONS BUILDING
EX 8" INFLUENT FROM FLOW
DISTRIBUTION BOX
EX DRIVE
ASSEMBLY
EX LADDER
EX RAILING (TYP)
EX 8" CLARIFIER INLET
EX 4" DRAIN
EX 8" INFLUENT TO
OXIDATION DITCH NO 1
EX 3" RAW ACTIVATED
SLUDGE
EX 3" RECYCLED
SLUDGE
EX 8" EFFLUENT TO
FLOW METER NO 2
EX 6" TO PUMP STATION NO 5
EX 1'-6" DIA GALV
STEEL SUMP AND
SUBMERSIBLE
SCUM PUMP
EX LADDER
EX RAILING (TYP)
EX ROTOR
EX BRIDGE
ASSEMBLY W/
HANDRAIL
EX OXIDATION DITCH
EX CLARIFIER
EX FLOOR
DRAIN
EX PLUG VALVE (TYP)
EX SKIRT AND
SUPPORTS
EX ADJUSTABLE
SCUM TROUGH
EX ROTOR
BAFFLE
EX ROTOR
COVER
EX RACE
EX STAIRS W/
HANDRAIL
EX MOTOR DRIVE
FLOW
EX BAFFLE
EX CONTROL PANEL
GENERAL NOTES:
1. PIPING AND EQUIPMENT SHOWN FOR CLARITY ONLY. SEE PLAN FOR
LOCATION AND ORIENTATION OF EQUIPMENT AND PIPING.
2. INSTALL ALL PRODUCTS IN STRICT ACCORDANCE WITH THE
MANUFACTURERS' INSTRUCTIONS, INCLUDING STRICT ADHERENCE TO
SURFACE PREPARATION AND ENVIRONMENTAL REQUIREMENTS.
3. DUE TO THE LIMITED AMOUNT OF OBSERVABLE CONCRETE SURFACE,
THE CONTRACTOR SHALL ASSUME THAT 50% OF THE STRUCTURE'S
ENTIRE CONCRETE SURFACE (APPROXIMATELY 2,300 SF) IS TO BE
REPAIRED IN ACCORDANCE WITH DETAIL 1/C-501.
KEYED NOTES
RAILING ANCHOR REPAIR, TYP OF ALL STRUCTURE'S RAILING ANCHORS,
SEE DETAIL 2/C-501
PROVIDE CYCLOALIPHATIC AMINE EPOXY COATING TO ALL SURFACES OF OXIDATION
DITCH, CLARIFIER AND EXPOSED METAL PIPING. ON EXTERIOR WALL SURFACES, APPLY
COATING A MINIMUM OF 6 INCHES BELOW EXISTING GRADE. SEE GENERAL NOTE 2
REPAIR CONCRETE SURFACES. SEE GENERAL NOTE 3 AND DETAIL 1/C-501
GRAVEL MOW STRIP, SEE DETAIL 3/C-501
2 1
3 TYP
1 2
3 TYP
DRAWING NOTES:
1. THIS SHEET RELATES TO WORK WITHIN THE
WASTEWATER TREATMENT PLANT.
2. ALL DIMENSIONS ARE APPROXIMATE. VERIFY IN
FIELD PRIOR TO CONSTRUCTION.
EX ADJUSTABLE SCUM TROUGH IS RUSTED IN PLACE AND UN-ADJUSTABLE. APPLY
LUBRICATION TO MOVING PARTS TO FREE UP TROUGH COMPONENTS.
at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
WASTWATER TREATMENT
PLANT CONCRETE REPAIR
PLANS
FJS
SAL
JRH
C-104
SCALE:
SOLIDS STRAINER & BAR SCREEN PLAN
A
1/2" = 1'-0"
SCALE:
CHLORINE CONTACT TANK PLAN
C
1/4" = 1'-0"
SCALE:
FLOW DISTRIBUTION BOX PLAN
B
1/2" = 1'-0"
15'-6" ±
10'-6" ± 5'-0" ±
5'-8" ±
14'-6" ±
4'-0" ±
2'-5" ± 2'-5" ± 5'-6" ± 2'-5" ± 1'-9" ±
KEYED NOTES
REPAIR CONCRETE SURFACES
SEE DETAIL 1/C-501
RAILING ANCHOR REPAIR, TYP ALL STRUCTURE'S
RAILING ANCHORS, SEE DETAIL 2/C-502
3 REMOVE EX AND INSTALL NEW SEALANT ALONG
ENTIRE JOINT BETWEEN STAIRS AND CONCRETE
STRUCTURE
TYP
EX 8" OUTFALL TO
MANHOLE NO 8
EX 6" DRAIN TO PUMP
STATION NO 5
EX 8" INFLUENT
EX HANDRAIL, TYP
FIBERGLASS BAFFLE, TYP
EX 8" INFLUENT
FROM BAR SCREEN
EX HANDRAIL, TYP
REMOVABLE
GRATING, TYP
EX 8" EFFLUENT TO
OXIDATION DITCH & FINAL
CLARIFIER NO 1
EX 8" EFFLUENT TO
OXIDATION DITCH & FINAL
CLARIFIER NO 2
2 TYP
EX ADJUSTABLE V-NOTCH
WEIR (TYP OF 2)
EX GRATING, TYP
EX ALUM HANDRAIL,
STRINGER AND
GRATING PLATFORM
EX CONCRETE SLAB
EX 8" SANITARY SEWER
TO FLOW DISTRIBUTION
BOX
EX 6" FORCE
MAIN INFLUENT
EX 2" DISCHARGE FROM
PUMP STATION NO 6
EX 2" DISCHARGE FROM
PUMP STATION NO 4
EX REMOVABLE
HANDRAIL, TYP
2 TYP
DRAWING NOTES:
1. THIS SHEET RELATES TO WORK WITHIN THE
WASTEWATER TREATMENT PLANT.
2. ALL DIMENSIONS ARE APPROXIMATE, VERIFY
IN FIELD PRIOR TO CONSTRUCTION.
EX BAR SCREEN
3'-0" ±
1" MIN SAW-CUT AROUND
ALL DAMAGED SURFACE
2" AVG DEPTH, SEE
NOTE 6
SLIGHTLY UNDER-CUT
LOWER SAW CUT
ELEVATION AT WALL
SECTION AT WALL
3" AVG DEPTH, SEE NOTE 6
SLIGHTLY UNDER-CUT
LOWER SAW CUT
SECTION AT CORNER EDGE
1" MIN SAW-CUT AROUND
ALL DAMAGED SURFACE
NOTES:
1. SOUND CONCRETE WITH HAMMERS TO DETECT ALL LOOSE CONCRETE.
2. REMOVE ALL LOOSE AND DETERIORATED CONCRETE TO SOUND CONCRETE.
3. SAW-CUT 1" MINIMUM DEPTH IN PERPENDICULAR LINES AROUND ENTIRE PATCH AREA AND REMOVE REMAINING
CONCRETE TO SAW-CUT.
4. CLEAN ANY EXPOSED REINFORCING BARS. REMOVE ALL RUST. REMOVE 3/4" OF CONCRETE AWAY FROM BEHIND
REINFORCING BARS. COAT STEEL WITH ZINC-RICH EPOXY PRIMER.
5. CLEAN ENTIRE AREA.
6. PATCH AREA WITH POLYMER MODIFIED CONCRETE REPAIR MORTAR SPECIFICALLY MADE FOR VERTICAL, OVERHEAD OR
HORIZONTAL APPLICATION. INSTALL STRICTLY PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
7. REFER TO PROJECT SPECIFICATION 03 01 30 CONCRETE REHABILITATION FOR ADDITIONAL REQUIREMENTS.
6"
MIN
M I N
SCALE:
CONCRETE REPAIR DETAIL
NONE
W at er T re at m en t P la nt a nd W as te w at er Tr ea tm en t P la nt
R ep ai rs
N at io na l C on se rv at io n
Tr ai ni ng
C en te r
Co ns er va tio n
W ay
, S he ph er ds to w n, W V
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980 revision description by dateno.
Project Number:
Drawn By:
Designed By:
Reviewed By:
AUBURN MALONE SYRACUSEAUBURN MALONE SYRACUSE
17104
March 16, 2018
Any alterations to this document not conforming to section 30-13 of the West Virginia for Professional Engineers strictly prohibited.
WARNING
Construction Documents
0 - -Issued to Bidders
©Beardsley 2017
BEARDSLEY ARCHITECTURE, ENGINEERING, LANDSCAPE ARCHITECTURE, D.P.C.
CIVIL
WASTEWATER TREATMENT
PLANT DETAILS
FJS
SAL
JRH
C-501
SCALE:
RAILING ANCHOR REPAIR
NONE
EX ALUMINUM RAILING
EX CONCRETE WALL
EX GROUT TO REMAIN
PROVIDE NEW
SEALANT TO FILL VOID
AND SHED WATER
EX ALUMINUM RAILING
EX CONCRETE WALL
UNDISTURBED
SUBGRADE
EX GRADE
DRAINAGE STONE
FILTER FABRIC
SCALE:
GRAVEL MOW STRIP
NONE
DRAWING NOTE:
1. THIS SHEET RELATES TO WORK WITHIN THE
WASTEWATER TREATMENT PLANT.
VARIES
FIELD VERIFY
| Sheets and Views |
| 1 COVER |
| 2 G-001 |
| 3 G-002 |
| 4 G-003 |
| 5 G-004 |
| 6 G-005 |
| 7 G-006 |
| 8 C-101 |
| 9 C-102 |
| 10 C-103 |
| 11 C-104 |
| 12 C-501 |
File details come from the government source that posted it.