Revised_Contractor_Questions_and_Answers_Amendment_4_0004.pdf
PDF 119 KB Posted
- Attached to
- Renovation/Replacement at an existing headquarters Federal contract opportunity
- Solicitation number
- 140F0822R0008
About this file
This document contains questions and answers relating to a solicitation for the renovation/replacement of an existing headquarters lab located at the Kenai NWR Headquarters. The solicitation is for general construction services including upgrading electrical and data systems, replacing wall raceways with conduit, removing an existing center island and storage area to install a new flat countertop, removing and capping gas connections, and providing a chemically resistant floor covering. Bidders should assume providing power and data to five workstations, that the existing data rack has sufficient capacity with expansion, and that all existing lab equipment will be removed by the agency prior to installation. The solicitation is issued by the U.S. Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0822R0008_Amd_0004.pdf | ||
| Past_and_Current_Performance_Survey_0003.pdf | ||
| Pre-Bid_Site_Visit_Attendance_List_0003.pdf | ||
| Contractor_Questions_and_Answers_0003.pdf | ||
| Sol_140F0822R0008_Amd_0003.pdf | ||
| Drawings-Specifications_Kenai_Headquarters_Lab_5_0002.pdf | ||
| Drawings-Specifications_Kenai_Headquarters_Lab_2_0002.pdf | ||
| Drawings-Specifications_Kenai_Headquarters_Lab_1_0002.pdf | ||
| Sol_140F0822R0008_Amd_0002.pdf | ||
| Drawings-Specifications_Kenai_Headquarters_Lab_3_0002.pdf | ||
| Drawings-Specifications_Kenai_Headquarters_Lab_4_0002.pdf | ||
| Sol_140F0822R0008_Amd_0001.pdf | ||
| 140F0822R0008_-_Notice_to_Offerors_0001.pdf | ||
| SOW_Kenai_NWR_Lab.pdf | ||
| Price_Schedule.pdf | ||
| DOL_Wage_Determination.pdf | ||
| Sol_140F0822R0008.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 4; Attachment 1
HQ Lab Renovations Kenai National Wildlife Refuge
Solicitation # 140F0822R0008 Questions and Answers
1. Notice of Offer: On Page 31 F and on Page 32 2 Part II we read that the Contractor is to fill out the Past Performance Questionnaire/Qualifications and we are referenced to Section J for the attachment. In the Solicitation on Page 22 we see Section J speaking to the list of Attachments. Where may we find the Past Performance Qualification Attachment?
Response: The Past and Present Performance Survey is now provided via this Amendment for Offerors to complete.
2. During the Site Visit Walk-about the Workstation was spoken to in relation to several areas needing power/data for computer use. For pricing purposes may we figure on 4 to 5 power / data points?
Response: Assume 5 Data Points.
3. During the Site Visit the Data ‘Rack’ was shown to the attendees. We observed that the Rack was very full and we are concerned if there is room for new connections. Is the Contractor/A&E to Design and price for the existing Rack to accept the requirements of the new work?
Response: Assume Rack is sufficient for Expansion and shall require only additional Cable and wiring.
4. It is unclear in the SOW if the design team is supposed to show all of the existing lab equipment being relocated. Please clarify.
Response: All equipment will be reused. Contractor is to ensure there is adequate room is available above for existing equipment.
5. Emergency Shower, is it to be retained and where is it to be located?
Response: Retain the emergency shower and drain.
6. What type of flooring shall be used?
Response: Provide a resilient floor covering that is chemically resistant. Heat seamed preferred but must be installed as per the manufacturer’s recommendations.
Amendment 4; Attachment 1
7. Center Island, are we to remove the center drain or do you want similar?
Response: The center island and storage shall be removed. New countertop shall be flat with no storage.
8. Center Island, are we to retain the gas connections? If not, where do you want them capped?
Response: The gas connections (bunser burners) shall be removed and capped. It is preferred to be capped back in the Mechanical room. Abandon in place all piping between mechanical room and Lab.
9. DBE Requirement percentages. What is required and what are the exceptions?
Response: See FAR Clause 52.219-14 and FAR Clause 52.222-23 in the Solicitation.
10. Circuits are currently in wall attached raceways. Do you want us to replace these?
Response: Remove Raceways and install conduit as per the NEC.
11. Equipment on countertops, is the Contractor responsible for moving?
Response: All Equipment on countertops shall be removed by the USFWS Prior to installation.
This is also part of the Contractor evaluation based on schedule for notification allowance.